[2025] NSWCATCD 118
General information, not legal advice.
NCAT Consumer and Commercial
2025-08-12
Original judgment source is linked above.
Davis v The Owners - Strata Plan No. 63429, unreported NSWCATCD, 17 December 2014
Davis v The Owners - Strata Plan No. 63429 [2017] NSW CATCD 7, 31 January 2017
Davis v Owners Corporation SP63429 [2018] NSW CATCD 27, 21 June 2018
Owners Corporation SP32033; Patrick and Valerie Mullins [2015] NSWCATCD 23
Maple v The Owners - Strata Plan No. 8950 [2021] NSW CATCD 108
Hoare and Ors v The Owners Corporation - Strata Plan No. 73905 [2018] NSW CATCD 45
Soares v The Owners - Strata Plan No. 14593 [2019] NSWCATAP 35
Coscuez International Pty Ltd v The Owners - Strata Plan No. 46433 [2022] NSWCATAP 147
Franklin v The Owners Strata Plan No. 87497 [2022] NSW CATCD 210
Philip Anthony Feitelson and Anne Christine Davis, Applicants
Mr David D. Knoll AM of counsel instructed by Sachs Gerace Lawyers for the Applicants
Mr Victor F. Kerr SC instructed by Madison Marcus Law Firm for the Respondent
(1) An order pursuant to s.237 of the SSMA appointing a compulsory strata managing agent to exercise all functions of the Respondent including the functions of chairperson, secretary, and treasurer for a period of 24 months from the date of order.
(2) An order pursuant to ss.229, 232 and 241 of the SSMA that the secretary and chairperson of the Respondent shall deliver, and cause its agents to deliver, all the Respondent's books and records to the compulsory strata managing agent so appointed within seven days of the date of order.
(3) An order pursuant to either s.232 or s.229 of the SSMA that the Respondent, acting by and through any compulsory strata managing agent appointed above, is to, at its own cost, use suitably qualified licence contractors to carry out the maintenance and repairs to the common property of the Respondent listed in the report of Christopher Ward dated 1 June 2023 and of Scott Taylor dated 30 May 2023, such work to be undertaken in a proper and workmanlike manner in accordance with all applicable building codes and standards so as to achieve compliance with s.106 of the SSMA, such work to be carried out as soon as practicable but in any event within 24 months.
(4) An order pursuant to ss.106 and 232 of the Act that the Respondent pay the Applicants damages in the sum of $21,915.09.
(5) An order pursuant to s.149 of the Act that the by-law described as special by-law 83 in motion 7 of the Notice of Extraordinary General Meeting dated 23 November 2021, is prescribed as a change to the by-laws of the Respondent within the wording that appears in Attachment 8 of the Notice of the EGM and with the proposed special by-law 83 to operate on and from the date of these orders.
(6) An order pursuant to ss.229 and/or 241 and/or 232 and/or 246 of the SSMA that the Respondent promptly, and by no later than 28 days after the making of such order, do all acts necessary to register and record the additional by-law subject of the proceeding order on the title of the common property.
(7) An order pursuant to s.232 of the SSMA that any expenses incurred by the Respondent pursuant to an order of the Tribunal or any money (including costs) payable by the Respondent to the Applicants pursuant to an order of the Tribunal and this proceeding must be paid from contributions levied on lot owners in proportion to the unit entitlements of each lot owner but excluding the Applicants' lots.
(8) An order that the Respondent pay the Applicants' costs of and incidental to the proceeding.
(9) Such further or other order as the Tribunal considers fit.
(1) An order pursuant to section 237 of the Strata Schemes Management Act 2015 (the Act) appointing SCMS-Strata Pty Ltd (licence number 1052225) as strata managing agent to exercise all functions of the Respondent owners corporation including the functions of chairperson, secretary and treasurer of the Respondent for a period of 24 months from the date of these orders. The appointment shall be on the terms and conditions as set out in the proposal of SCMS-Strata Pty Ltd in Exhibit B.
(2) An order pursuant to sections 229, 232 and 241 of the Act that the secretary and chairperson of the Respondent owners corporation shall deliver, and cause its agents to deliver, all the Respondent owners corporation's books and records to the agent appointed pursuant to order 1 within 7 days of the date of these orders.
(3) An order pursuant to either section 232 or section 229 or section 241 of the SSMA that, the Respondent, acting by and through any manager appointed pursuant to order 1, or itself if no such order is made, is to, at its own cost, using suitably qualified and where required licensed contractors, carry out the maintenance and repairs to the common property listed in the (engineering) reports, such work to be undertaken in a proper and workmanlike manner in accordance with all applicable codes and standards so as to achieve compliance with s 106 of the SSMA, and such work to be carried out as soon as practicable, but in any event within 24 months.
(4) An order pursuant to sections 106 and 232 of the Act that within 28 days the Respondent pay to the Applicants damages in the amount of $21,915.09.
(5) An order pursuant to section 149 of the Act that the by-law, described as proposed special by-law 83 in motion 7 in the notice of extraordinary general meeting dated 23 November 2021 (the EGM), is prescribed as a change to the by-laws of the strata scheme, with the wording that appears in attachment 8 of the notice of the EGM, and with the proposed special by-law to operate on and from the date of these orders.
(6) An order that the Respondent owners corporation record and register the by-law prescribed pursuant to order 5 in accordance with section 246 of the Act within 28 days of these orders being made.
(7) An order pursuant to section 150 of the Act that the following by-laws of Strata Plan 63429 be declared invalid.
(a) By-law 11.
(b) By-law 15.
(c) By-law 17.
(d) By-law 25.
(e) Special by-law 34.
(f) Special by-law 65.
(g) Special by-law 86.
(h) Special by-law 87.
(i) Special by-law 88.
(j) Special by-law 89.
(8) An order that the Respondent owners corporation record and register the removal of bylaws pursuant to order 7 in accordance with section 246 of the Act within 28 days of these orders being made.
(9) An order pursuant to section 24 of the Act that the special resolutions 4, 5, 7 and 9 passed at the general meeting on 13 November 2023 to effect special by-laws 86, 87, 88, and 89 be declared invalid.
(10) The parties be heard as to costs.
(1) The Adjudicator award's orders dated 21 April 2016 dismissing the First Applicant's application were revoked; and
(2) Ordered the Respondent to affect all repairs to common property necessary to prevent water ingress into the main bedroom of the upper storey of Lot 18 (Villa 8) on or before 30 May 2017.
"By consent, the Tribunal orders that the Respondent effect all repairs to or replace common property necessary to prevent water ingress into the main bedroom on the upper storey of Lot 18 by 28 February 2018".
(1) Application form and supporting material;
(2) Affidavit of Anne Davis dated 9 August 2023;
(3) Affidavit of Paul Owen dated 26 July 2023;
(4) Affidavit of Mary-Rose George dated 21 July 2023;
(5) Report of Chris Wood dated 1 June 2023; and
(6) Report of Scott Taylor dated 30 May 2023.
(1) Report of Chris Wood dated 8 March 2024;
(2) Report of Scott Taylor dated 12 March 2024; and
(3) Second affidavit of Anne Davis dated 13 March 2024 and Exhibit AD-2.
(1) Statutory Declaration of Ashley Goulding dated 15 December 2023;
(2) 29 statements of lot owners in support of the current management;
(3) Statement of Hudson Greenway dated 8 December 2023, garden contractor;
(4) Statutory Declaration of Diane Fuscaldo, secretary/treasurer of SP63429, dated 15 December 2023;
(5) Defects Report of Greg Killen dated 14 December 2023; and
(6) Garden Report of Richard Elliott dated 21 November 2023.
(1) Statement of Diane Fuscaldo dated 11 November 2024;
(2) Statement of Geoff Savige dated 22 October 2024;
(3) Statement of David Hayes dated 18 October 2024; and
(4) Joint Scott Schedule dated 11 November 2024.
(1) Applicants' Outline of Submissions dated 8 November 2024 (46 pages) plus supporting documents and annexures including transcript of the hearing;
(2) Applicants' Outline of Submissions in relation to oral evidence on Day 4 dated 9 December 2024 (17 pages); and
(3) Applicants' Outline of Reply Submissions dated 21 January 2025 (27 pages plus annexures).
(1) Respondent's Written Submissions dated 13 December 2024 (115 pages);
(2) Respondent's Reply Submissions dated 31 January 2025 (29 pages); and
(3) Respondent's pre-hearing Submissions dated 11 November 2024 (108 pages).
(1) The management of SP63429 is not functioning satisfactorily within the meaning of s.237(3)(a) of the SSMA. In particular, the OC has a persistent and profoundly inadequate appreciation of important statutory responsibilities which cannot be allowed to continue;
(2) The OC has failed to perform its duties within the meaning of s.237(3)(c) of the SSMA including the duty to repair under s.106 of the SSMA. In particular, the OC has persistently failed to undertake adequate repairs to Villas 7, 8 and 9 owned by the Applicants; and
(3) In relation to Villa 8, the persistent failure to repair also reflects the failure to comply with the requirement imposed on the OC by a Tribunal order in 2017 and 2018.
"(3) The Tribunal may make an order only if satisfied that -
(a) the management structure of a strata scheme the subject of an application under this Act or an appeal to the Tribunal is not functioning or is not functioning satisfactorily, or
(b) the owners corporation has failed to comply with a requirement imposed on the owners corporation by an order under this Act, or
(c) the owners corporation has failed to perform one or more of its duties, or
(d) the owners corporation owes a judgment debt."
(1) The nature or duration of the actions or inactions of the owners corporation (or the level of dysfunctionality) must justify the appointment of a compulsory strata manager;
(2) Past inadequacies of the management of the owners corporation may gravitate against the appointment of a compulsory strata manager if for instance there has been a recent change in behaviour involving compliance or the election of a new strata committee that has adopted an approach that accords with the owners corporation complying with its obligations;
(3) The Tribunal should focus upon objective evidence. It is likely that a lot owner making an application for the compulsory appointment of a strata manager is subjectively dissatisfied with the current management of the owners corporation however the appointment of a compulsory strata manager requires more than the subjective belief of that lot owner/applicant.
"The appointment of a compulsory strata manager is a serious measure not to be taken lightly, because it removes the democratic process that has been established under the SSMA for the owners corporation to govern itself. In essence, it places the owners corporation into the hands of an administrator for a period of time."
(1) Breach of Tribunal orders dated 21 June 2018, including breach of consent order 4 for the OC to retain an independent qualified engineer to provide a scope of works in order to comply with order 3 and deregistering by-law 19 by 31 August 2018 and by-law 59 by 31 August 2018;
(2) Failing to register a replacement special by-law 46.2 within 60 days of the date of consent being 8 November 2017;
(3) Breach of Tribunal orders dated 17 December 2014;
(4) The OC seeking to enforce special by-law 46 against the First Applicant for failure to comply with special by-law 46 in July 2014 and in September 2016 for failing to withhold and consent to a proposed amendment to special by-law 46 to include references to work carried out by the First Applicant in Villa 8. Both OC applications were unsuccessful in the Tribunal;
(5) Failure to properly maintain and the keep the common property in a state of good and serviceable repair, including
(a) Ongoing water ingress into Villa 8 since 2009 and at Villas 7 and 9 since 2016;
(b) Deferring roof flashing works from 2017 until around November 2022 which were completed in June 2023;
(c) Balcony repairs, including issues with excessive rust to the steel balcony beams and support brackets and rotting to the wooden balcony beams since 2006;
(d) Termite issues;
(e) Cleaning of exterior lots;
(f) Pool heating;
(g) Garden maintenance;
(6) Budget issues, including failure to manage the capital works fund and administrative fund in a proper manner;
(7) Financial mismanagement, although this appears to relate to predominantly the budgeted amount for an optional sliding door replacement in a balcony by-law and seeking contribution from each lot owner of 33% of the cost of the optional replacement. The Applicants regard this as an attempt by the OC to shift costs to lot owners to keep levies low;
(8) Insurance claim reimbursement of an insurance claim by the First Applicant for storm damage at Villa 8 less a $10,000.00 excess incurred by the First Applicant;
(9) Inconsistent by-laws and procedures in respect of by-laws 1, 2, 5, 17, 15 and 3; and
(10) Errors in strata records.
(1) Ashley Goulding, strata manager;
(2) Diane Fuscaldo, treasurer and secretary of the strata committee of SP63429; and
(3) Statement of the owners of Villas 1-6, 10-12, 14, 16-20, 22, 25, 36-45, 5 and 28; and
(4) Statement of Hudson and Greenway, garden contractors.
(1) There was a current strata managing agent's agreement between Ace and SP63429 dated 28 June 2022;
(2) The buildings at SP63429 were currently insured with CHU up to an amount of $61,311,800.00;
(3) The OC is presently in a staple and solvent financial position and, as at the end of financial year 28 February 2023, had $27,906.00 in its administrative fund, $722,926.00 in its capital works fund and $750,832.00 in assets;
(4) Included all notices of minutes of AGM's and EGM's for the last three years of SP63429;
(5) Included notices and minutes of strata committee meetings for the last three years;
(6) Listed the following annual or regular maintenance activities of the OC including:
(a) Termite control activities with Circular Pest Control;
(b) Annual gutter cleaning for all villas and pool cabana;
(c) Annual treescape pruning;
(d) Annual northern slopes slashing;
(e) Weekly pool cleaning and maintenance; and
(f) Weekly garden and amenities maintenance;
(7) That the OC had completed in the last three years the following building and maintenance rectification works including:
(a) Building expansion joint maintenance of Villas 1-24;
(b) Refurbishment of front entry complex including lighting upgrade and painting (March 2021);
(c) Diagnosis and resolution of window flashing issues at Villas 25-36 (February 2021 - September 2021);
(d) Cleaning, painting and refurbishment of eastern pool cabana (March 2021);
(e) Arborist Report and tree maintenance on northern slopes (July/August 2021);
(f) Renewal upgrade of BBQ gas connections at east and west pools (December 2021);
(g) Installation of solar energy system on eastern pool cabana (January 2022);
(h) Upgrade of street bollard lights to LED (June 2022);
(i) Replacement of built-in BBQ at west pool (June 2022);
(j) Replacement of built-in BBQ at east pool (November 2023); and
(k) Planning and implementation of major planned maintenance works for V1-24, Zone of Complex (2021-2023).
(8) Mr Goulding noted that the ability of the OC to plan, implement and conduct repairs and maintenance in the last five years had been impacted by a range of events including:
(a) La Nina weather event which lasted from 2020-2023 bringing unprecedented rainfall;
(b) Major flooding in northern New South Wales;
(c) A major hail storm in Coffs Harbour in October 2021; and
(d) The global Covid-19 pandemic which resulted in shutdowns, supply chain disruptions and limitations during 2020-2022, including the sourcing of building and roofing materials for maintenance work of the OC.
(9) In 2022, lot owners voted at the OC's AGM to perform the second maintenance cycle for Villas 1-24. Between 2022 and 2024, the most recent cost estimate presented for this Planned Works Project being $1.35 million (an average of $56,000.00 per villa - see p.11 on Attachment 4 of the AGM notice for the meeting dated 27 April 2023).
(10) The works were substantially completed in August 2023.
(11) Generally the works were completed on Villas 1-24 including but not limited to:
(a) Building, cleaning and painting;
(b) Maintenance to vertical building wall expansion joints;
(c) Cyclical rust treatments and painting of balcony steel beams (every three years);
(d) Roof works including 100% replacement of all lead flashing and replacement of nearly 100% of parapet wall cladding boards;
(e) Replacement of north facing stairwell window in selected villas;
(f) Replacement of gutters, fascia and soffits on north side as required;
(g) Cleaning and replacement of front entrance polycarbonate ceilings damaged by hail as required;
(h) Roof tiled pointing as required;
(i) Post-works cracked tile replacements after all boots were off the roofs;
(j) Mould retardant treatment applied to all roofs as a final step.
(12) The OC and Mr Goulding used local tradespeople to undertake this work as they had established longstanding relationships with trusted and competent people around building, repair and water ingress issues in the building's 22 year existence.
(13) Mr Goulding denied that continuing water ingress claims that were the responsibility of the OC have been substantiated or that there were current water leaks.
(14) Mr Goulding indicated there had been unplanned building repairs in each of the four financial years ending 28 February 2020, 2021, 2022 and 2023 in the sum of approximately $20,000.00 or less.
(15) Mr Goulding denied that the strata records of SP63429 were incomplete or unkept or that the First Applicant had made any allegation of this after inspection of the strata records in March 2023.
(16) Mr Goulding also said that occasional breaches of by-laws of SP63429 are dealt with by the strata committee considering the complaint or reaching out to the owner in person to resolve the matter amicably.
(17) In summary, Mr Goulding considered that SP63429 was functioning satisfactorily and that the appointment of a compulsory strata managing agent would not be in its best interests as it would first deprive the OC of a committed and proactive strata committee and experienced strata manager, remove the democratic process under the SSMA and perhaps deny the OC of the benefits of the experienced trade people who are familiar with the buildings and provide cost effective services.
(1) SP63429 is not dysfunctional and it attends to all its required functions including financial management, holding general meetings, notifying lot owners of AGM's and EGM's, holding regular strata committee meetings, enforcing by-laws and addressing building maintenance work;
(2) The Applicants have attempted to create an illusion of dysfunctionality by "nit picking their way through insignificant issues" that have arisen and been dealt with satisfactorily by the OC;
(3) Programmed work to restore balconies, termite control and similar matters;
(4) Where there is an identified systemic problem in the villas, the practice appears to be for the OC to prepare a maintenance schedule for repairs to be made to the specific item (balconies, painting, pathways, sliding doors) over a period of time in order to spread the expense; and
(5) Other unique items such as the gate intercom has been changed to a keypad operation.
(1) That the OC breached the Tribunal orders dated 17 December 2014, 31 January 2017 and 21 June 2018; and
(2) That those proceedings support the contention that the OC has unnecessarily pursued legal action without proper grounds.
(1) By consent, to register a replacement special By-law 46.2 in the agreed form attached to the orders within 60 days (Orders 1 and 2);
(2) By consent, to retain an independent qualified engineer to provide a scope of works for the repair or replacement of common property to prevent water ingress into the main bedroom on the upper storey of Lot 18 (Orders 3 and 4);
(3) To register a change of by-laws removing By-law 19 and special By-law 59 by 31 August 2018 (Orders 7 and 10); and
(4) To refund payments made by Dr Davis under special By-law 59 and By-law 19 (Orders 8 and 11).
(1) Villa 7: main bedroom, sliding door, soffit, garage and hallway;
(2) Villa 8: garage, main bedroom, loungeroom, balcony, outdoor terrace, soffit, skylight and hallway;
(3) Villa 9: sliding door, downstairs study, back bedroom, kitchen, lounge and garage.
(1) In Villa 7, while there was remnant mould on the main bedroom ceiling from previous water ingress, there is no moisture entering the roof into the cavity above the ceiling and Mr Binet arranged for the repair of the remnant mould by a licenced painter;
(2) In respect of Villa 8, the patio ceiling which had been modified showed a high moisture and a water stain on the garage ceiling was pre-existing and not caused by any recent water ingress;
(3) In respect of Villa 9, there was high moisture in an area next to kitchen cupboards in the living room which, on further inspection, had resulted from a fault in the installation of flashing on the roof above that area which Mr Binet then fixed; and
(4) There was a water stain on the ceiling in the upstairs north-western bedroom which Mr Binet considered was not the result of current water ingress.
(1) Emails between the Applicants and the OC as far back as 2018 maintaining the gardens around their villas were not being properly maintained;
(2) Whether the OC was entitled to abandon, or refuse to maintain, a centralised irrigation system in favour of individual irrigation systems which shifted the cost of watering common property gardens to individual lot owners;
(3) Complaints by Mr Owen, a lot owner, about garden maintenance by his neighbour;
(4) Emails between the Second Applicant and the OC in 2019 concerning gardens around Villa 9 and By-law 17; and
(5) Asserting that the gardens are not to the standard of [address] annexing a 2019 landscaping assessment report by Scott Taylor of Terrain Consultants.
(1) A lack of rejuvenation and re-plantings an introduction of species a poor association;
(2) Bare areas in the majority of existing garden;
(3) The precis gated entry has plant associations that are random, sparse, nonsensical and poor in form and density, colour and interest;
(4) Owners have individualised gardens including by produced plantings of species of poor associations eg Villa 12's cacti garden and Villa 14's blue gravel space within intermittent small scrub plantings;
(5) Pruning of topiary and trees has removed screening and created poor forms and structures.
(1) Gardening, plant care, lawns, weed management and pest management activities were all being properly undertaken;
(2) The gardens had a tidy appearance;
(3) New plant species were harmonious and maintained overall visual continuity;
(4) There was sufficient soil and mulch cover;
(5) Photos taken during his inspection were labelled to identify the location they depicted and suggested the gardens were being maintained to a high standard.
(1) The budgets contain reviews of the past year's maintenance activities;
(2) Reports on prior year expenditure and budgeted expenditure for the next year on common property maintenance and replacement comes about both those part of the Administrative Fund Budget and Works Fund Budget including detailed information for plant capital works projects and garden maintenance works;
(3) There also detailed information circulated about the major planned maintenance cycle for Villas 1-24 involving maintenance replacement of roof flashing, parapet wall cappings, gutters and fascias (especially those north facing) soffits, roof tiles and balcony timber slats.
(1) A report dated 1 June 2023;
(2) A second report dated 8 March 2024;
(3) A third report dated 17 June 2024.
(1) The Applicants' expert, Mr Wood, was to prepare a draft Scott Schedule to provide to the Respondent's solicitors based upon the "approximately 20 defects" listed in his current report, by Friday 16 August 2024;
(2) The two experts were to attend a conclave at Pacific Villas, Coffs Harbour, to review the draft Scott Schedule by 16 September 2024;
(3) Mr Killen would prepare a marked up copy of the Scott Schedule to provide to his solicitors and the Applicants solicitors reflecting the extend of their respective agreements and disagreements;
(4) The proceedings were listed for a further day in Sydney (15 November 2024) for an expert conclave to be held to consider the expert opinions on the agreed lists of defects and issues;
(5) Although there was a minor slippage in that timetable, that is of no consequence. The Applicants' solicitors filed in the Tribunal a copy of the Scott Schedule on or about 13 September 2024. That Scott Schedule contained 26 items, issues or defects on which the experts opined. At the further hearing on 15 November 2024, there was a conclave of both engineering experts, Mr Wood and Mr Killen, upon which the Tribunal relies to make its determination.
(6) The Applicants sought work orders for remediation, repair or maintenance in respect of the 26 items contained in the Scott Schedule. The Respondent submitted that no order should be made in respect of the 26 items. It is left therefore to the Tribunal to deal with each of the items and to determine whether, and if so, what order should be made.
#1 and #2 - Villas 7 and 9, Bedroom 1, sliding door
#3 - Villa 7, Bedroom 1 and hallway timber floorboards
#4 - Villa 7, Bedroom 1 skirting boards and wall lining adjacent to eastern window
#5 and #6 - Villas 7 and 9, Bedroom 1, sliding door
#7, #8 and #9 - Villas 7, 8 and 9 - Gutters, Fascias and Downpipes
#10 and #11 - Villas 7 and 9, Bedroom 1, Balcony structural steel support beams and brackets
#14 - Retaining and dwarf wall between Villa 7 and 8 driveways
#19 and #20 - Villas 7 and 9, Bedroom 1, decking boards and joists
#22 - Villa 9, Garage Northern access door and window
#23 and #24 - Villas 7 and 9, Bedroom 1, Deck glass balustrade
(1) Confining it to replacement of dislodged gaskets being the relevant defect agreed by the experts rather than make a nonspecific order for repair of the glass balustrades generally; and
(2) Not include an order that they be maintained in good order thereafter.
#25 and #26 - Villas 7 and 9, Bedroom 1, Deck glass balustrade
Respondent to install 600Pa doors in Villas 7 and 9 within 6 months.
Villa 7, Bedroom 1 skirting boards and wall lining adjacent to eastern window
Respondent to replace sliding door as per Item 1 above. No further order is required.
Respondent to include in ordinary planned maintenance work.
Villas 7 and 9, Bedroom 1, Balcony structural steel support beams and brackets
Respondent to include in ordinary planned maintenance work.
Respondent to have door serviced by a qualified garage door service contractor within 3 months.
Retaining and dwarf wall between Villa 7 and 8 driveways
Respondent to clean common property pavers and repair any loose pavers within 3 months.
Respondent to replace waterproofing so that it is fully integrated onto the existing waterproof membrane within 3 months.
Respondent to repair damage to ceiling lining and mould growth within 3 months.
Villas 7 and 9, Bedroom 1, decking boards and joists
Respondent to repair decking boards only (not joists) within 6 months.
Respondent to repair or make serviceable the gaskets that hold the glass infill panels into the aluminium frame of the balustrades within 3 months.
Respondent to have the deck glass tested within 3 months by a contractor experienced in testing degrees of delamination in order to assess whether there is sufficient delamination to warrant replacement and are to be replaced if testing identifies that there is and the balustrades are to be maintained in good order thereafter.
Damages of $21,915.09 pursuant to s.106 of the SSMA
(1) The Second Applicant incurred $52,081.90 for kitchen repairs by Infracraft Detailed Joinery;
(2) The Second Applicant incurred $6,050.00 in legal expenses; and
(3) There was a $10,000.00 deductible or excess on the OC's CHU insurance policy which applied to this claim.
(1) First, pursuant to s.106(5) of the SSMA and in breach of the OC's duty to maintain the common property and keep it in a state of good and serviceable repair; and
(2) Secondly, in breach of the OC's duty pursuant to s.160 of the SSMA to insure and keep insured the whole of the building.
(1) The terms of special by-law 46 appear to relieve the OC of any liability for this event, at least under s.106 of the SSMA, and place it with the Lot 18;
(2) At least some of the sums sought to be recoverable by the Second Applicant were not recoverable under the CHU insurance policy such as the deductible and legal expenses; and
(3) It's unclear exactly how the CHU insurance policy failed to comply with s.160 of the SSMA and, even if it did, how that gives rise to a damages claim by the Second Applicant against the OC: see Coscuez International Pty Ltd v The Owners - Strata Plan No. 46433 [2022] NSWCATAP 147 at [134].
(1) An almost identical proposal was submitted by the owner of Villa 6, the plans for which were drafted by the same architect, and which was submitted to the 23 November 2021 EGM;
(2) It was passed by the OC with only 2% of unit entitlements voting against it whereas the Second Applicant's similar application at the same meeting had 72% of unit entitlements voting against it.
(1) First, she did not work collaboratively with the strata committee to formulate a special by-law consistent with the procedures and model by-law of the OC;
(2) Secondly, the Second Applicant's proposed by-law did not contain a clear and comprehensive point-by-point description of the proposed works in one attachment, and plans and diagrams in a separate attachment;
(3) Thirdly, the OC sought an Annual Fee of $45.00 payable by the Second Applicant to acknowledge that she is being granted a right or privilege of value; and
(4) Fourthly, the owners of Villa 6 co-operated with the strata committee in preparing a by-law in accordance with the OC's documentation recommendations, including a detailed description of the proposed works in a separate attachment and agreed to pay the Annual fee of $45.00.
(1) The descriptions for the works to be performed in both Villa 6 and 7 were noted on the architect's plans in almost identical terms;
(2) Any matters of substance were only minor or immaterial;
(3) No annual fee was charged for four previous carport special by-laws namely for Villas 3, 4, 5 and 8. The special by-law 18 which approved an enclosed carport for Villa 4 contained the only description for the works in the diagram (and not in a separate document);
(4) Only three witnesses provided evidence to support the OC's contention that the refusal of special by-law was reasonable. They were:
(a) Ms Maria Lindsay in a statement dated 1 October 2023 gives her reason as non-compliance with matters of form;
(b) Ms Fuscaldo and Ms Lindsay complain about the lack of any indemnity provided by the Second Applicant, however this is included in clause 4(a); and
(c) Ms Marion Barclay in a statement dated 9 November 2023 at [14] stated that '... owners have every right to deny the request given the hostile behaviour of Ms Davis and her continual disputes related to special privileges granted ...' This statement is indicative if the ill-will between the Applicants and the other lot owners.
"(1) By-laws may be made in relation to the management, administration, control, use or enjoyment of the lots or the common property and lots of a strata scheme.
(2) A by-law has no force or effect to the extent that it is inconsistent with this or any other Act or law."
"(1) By-law cannot be unjust
A by-law must not be harsh, unconscionable or oppressive.
Note : Any such by-law may be invalidated by the Tribunal (see section 150).
(2) By-law cannot prevent dealing relating to lot
No by-law is capable of operating to prohibit or restrict the devolution of a lot or a transfer, lease, mortgage or other dealing relating to a lot.
...
"(1) The Tribunal may, on the application of a person entitled to vote on the motion to make a by-law or the lessor of a leasehold strata scheme, make an order declaring a by-law to be invalid if the Tribunal considers that an owners corporation did not have the power to make the by-law or that the by-law is harsh, unconscionable or oppressive."
(1) First, cleaning of outside building surfaces such as windows and doors is not encompassed in the duty of an owners corporation to "maintain and keep in a state of good and serviceable repair" the common property of strata scheme within the meaning of that term in s.106(1) of the SSMA. Unclean windows and doors produce the same performance and functional efficiency as clean windows and doors - they continue to act as barriers between inside and outside and for a means of egress and ingress out of, and into, the lot. In this way, there is no inconsistency between by-law 11 and s.106 of the SSMA;
(2) By-law 11 is an original by-law as it was not made by the OC, the Tribunal's jurisdiction under s.150 to declare invalid a by-law that an owners corporation did not have the power to make is not enlightened;
(3) The by-law is not on any reasonable analysis harsh, unconscionable or oppressive within the meaning of s.150(1) of the SSMA. No other owners have complained about the by-law according to Ms Fuscaldo's evidence and the Applicants have given no evidence about the prejudice they suffer by complying with the by-law.
(1) Applications that do not comply with a substantial portion of the necessary conditions may not be approved;
(2) Applications that are substantially compliant with the conditions may be approved by the strata committee, subject to the right of the neighbouring lots to challenge the decision at the next general meeting of the OC; and
(3) Applications with more than minor variations from the construction guidelines may be approved by ordinary resolution of the OC.
(1) By-law 17.2.2 does not authorise any action to be taken. On the contrary, it prohibits an owner from taking the prescribed action. While by-law 17.2.2 contemplates the OC might give consent, and stipulates criteria for giving that consent, that cannot override the statutory requirement that consent by special resolution of the OC is necessary if the relevant proposed action is the addition, alteration or erection of a structure on common property for the purposes of its improvements or enhancements, within the meaning of s.108(1) of the SSMA.
(2) In that sense, by-law 17 is not the same as the blanket approvals in by-law 15 and by-law 65.
(3) Further, by-law 17 is an original by-law not made by the OC and the Respondent submits that the Tribunal does not have jurisdiction under s.150 to declare invalid a by-law that an owners corporation did not have power to make.
(4) The Tribunal agrees with the Respondent's submission that upholds the by-law on the basis that it does not obviate the need for approval by a special resolution pursuant to s.108 of the SSMA.
(1) By-law 65 was made by a special resolution at the AGM held on 11 April 2017 which "specifically authorises the taking of the particular action proposed". The Respondent submits that this is sufficient compliance with s.108(s) of the SSMA since it authorises lot owners to take the action authorised in by-law 65;
(2) The action authorised in by-law 65 is for "each owner to conduct the works", in essence being bathroom renovations. The Respondent says the action authorised by by-law 65 is adequate in its specificity of authorisation and particularity as to the action proposed;
(3) The Applicants dispute this saying a general permission is not a specific authorisation for the purposes of s.108 of the SSMA and for these reasons, by-law 65 is invalid. The work authorised under this by-law, bathroom renovations, will not be a minor renovation within s.110 of the SSMA by reasons of s.110(7)(b) and (d). This by-law is beyond the power of the OC to make as it is inconsistent with s.108 of the SSMA;
(4) The Tribunal agrees with the Applicants that the Respondent's submissions should be rejected and that by-law 65 should be declared invalid.
(1) Motion 4 - Not to replace, maintain or clean the front entryway pavers which uniquely service lots associated with Villas 1-24;
(2) Motion 5 - Not to replace the centralised irrigation system;
(3) Motion 7 - Not to replace the intercom system at the front entry gate;
(4) Motion 9 - Not to replace the pool heaters that were removed by the owners corporation with approval by general motion in 2006.
(1) An order pursuant to either section 232 or section 229 or section 241 of the SSMA that, the Respondent is to, at its own cost, using suitably qualified and where required licensed contractors, carry out the maintenance and repairs to the common property listed in the Works Table at paragraph 180 of these Reasons for Decision, such work to be undertaken in a proper and workmanlike manner in accordance with all applicable codes and standards so as to achieve compliance with s 106 of the SSMA, and such work to be carried out as prescribed for each item in the Works Table, and within the scope of works for that item proposed by Mr Chris Wood in Exhibit K.
(2) An order pursuant to section 149 of the SSMA that the by-law, described as proposed special by-law 83 in motion 7 in the Notice of Extraordinary General Meeting dated 23 November 2021 (the EGM), is prescribed as a change to the by-laws of Strata Plan No. 63429, with the wording that appears in attachment 8 of the Notice of the EGM, and with the proposed special by-law to operate on and from the date of these orders.
(3) An order that the Respondent owners corporation record and register the by-law prescribed pursuant to order 2 in accordance with section 246 of the Act within 28 days of these orders being made.
(4) An order pursuant to section 150 of the SSMA that the following by-laws of Strata Plan 63429 be declared invalid.
(a) By-law 11.
(b) By-law 15.
(c) Special by-law 34.
(d) Special by-law 65.
(e) Special by-law 86.
(f) Special by-law 87.
(g) Special by-law 88.
(h) Special by-law 89.
(5) An order that the Respondent owners corporation record and register the removal of bylaws pursuant to order 4 in accordance with section 246 of the Act within 28 days of these orders being made.
I hereby certify that this is a true and accurate record of the reasons for decision of the Civil and Administrative Tribunal of New South Wales.
Feitelson
The Owners - Strata Plan No. 63429 [2025] NSWCATCD 118;