[2018] VCAT 1362
General information, not legal advice.
Victorian Civil and Administrative Tribunal
2018-09-11
Original judgment source is linked above.
Section 87A of the Planning & Environment Act 1987; Maroondah Planning Scheme; General Residential Zone Schedule 2; Design and Development Overlay Schedule 10, Significant Landscape Overlay Schedule 4; Application to reduce scale of project from 16 apartments to 8 townhouses; Planning Policy; Building Height; Underdevelopment; Design
FCAP Pty Ltd v Maroondah CC [2018] VCAT 1362
Mr Kyle O'Brien, Town Planner, David Lock and Associates
Application to amend permit to allow the construction of eight townhouses on the land.
Application under section 87A of the Planning and Environment Act 1987 - to amend a permit issued at the direction of the Tribunal.
General Residential Zone Schedule 2; Significant Landscape Overlay Schedule 4; Design and Development Overlay Schedule 10.
Clause 32.08-6 - Construct two or more dwellings on a lot;
Clause 43.02-2 - Construct a building and construct and carry out works;
The subject site has an area of 1,115 square meters and currently contains a single dwelling and associated outbuildings.
Zhou v Maroondah CC [2016] VCAT 196, Kind David School v Stonnington City Council [2011] VCAT 520, Callea Property Developments Pty Ltd v Wyndham CC [2014] VCAT 466, Bestway Group Pty Ltd v Monash CC (Red Dot) [2008] VCAT 860, Central Estate Properties Pty Ltd v Manningham CC (Includes Summary) (Red Dot) [2014] VCAT 343
ARE THE PROPOSED CHANGES A TRANSFORMATION OF THE PROPOSAL?
If a proposed use or development is totally unrelated to the permit as it exists and would entail completely new conditions, I consider that the amendment process would be inappropriate. There would be no point in attempting to amend a permit in such circumstances where nothing would be left of the original permit. An application for a new permit should be made. However, where the permit is not transformed but retains significant elements of its previous content, and simply adds to, expands or alters what has been previously allowed, I consider that amending a permit, rather than always having to apply for a new permit, is now clearly contemplated by the provisions in the Act.
It is not possible to lay down a universal rule which identifies where the line is to be drawn between amendment and transformation. It is possible only to say in any particular case on which side of the line the proposal falls. However I consider that the line must be drawn in a town planning context so the question is whether from a town planning perspective what is proposed is a modification of what the permit allows, or alternatively a transformation into something different. If it is the latter it goes beyond the jurisdiction conferred by section 87A and requires a new application for permit with all the statutory process that entails.
I note here that in the King David matter that Tribunal considered that exceptional circumstances might include market conditions as a reason for seeking amendments. I would treat such circumstances with extreme caution. In my view, in anything other than the most extra-ordinary circumstances, a change in market conditions would normally fall outside the contemplation of planning considerations. I would take the previous Tribunal's adoption of such a circumstance to not to be taken as an opportunity for permit holders to amend plans or use just because it is felt that what has been approved may not sell in the current market or that the amendments may see a better return achieved. Rather it should be taken to mean that unusual or unanticipated conditions of a most extra-ordinary nature have arisen that requires substantive changes.
While one can recognise the intertwining nature of planning, development and economic benefit, as expressed within section 4 of the Planning and Environment Act, for many commercially driven applications there will always be an element of a calculated 'market risk' as part and parcel of the process. If the calculation of such risk is found wanting once a permit is gained, then the proper and orderly planning process required under the Planning and Environment Act would seem to require an examination of a substantively revised proposal through the process of a new permit application.
IS THE AMENDED PROPOSAL AN UNDERDEVELOPMENT DUE TO ITS HEIGHT?
Residential development consists of low rise, multi level, multi occupancy, apartment style buildings in garden settings, where the buildings are softened and framed by canopy trees.
IS THE AMENDED PROPOSAL AN UNDERDEVELOPMENT DUE TO THE REDUCTION YIELD?
Strategic sites (Inc Ringwood and Croydon Town Centres)
[1] The submissions of the parties, any supporting exhibits given at the hearing and the statements of grounds filed have all been considered in the determination of the proceeding. In accordance with the practice of the Tribunal, not all of this material will be cited or referred to in these reasons.
[2] Pursuant to section 87A of the _Planning and Environment Ac_t 1987
[3] Kind David School v Stonnington City Council [2011] VCAT 520
[4] Callea Property Developments Pty Ltd v Wyndham CC [2014] VCAT 466
[6] Extracted from the plan prepared by t a square (Drawing TP05) dated 26 September 2017
[7] Croydon Town Centre Structure Plan Background Report Planisphere 2006 page 30
[8] Referenced at Clause 11.01 of the scheme
[9] I have simply divided the total figures between the locations specified to provide an estimate of the dwellings required for Croydon (e.g. for the Greenfield sites I have calculated the number between the two sites mentioned in the structure plan)
FCAP Pty Ltd
Maroondah CC [2018] VCAT 1362