Emerald Lakes - The Village Residential [2025] QBCCMCmr 403
The Body Corporate for Emerald Lakes - The Village Residential (respondent)
Body Corporate and Community Management Act 1997 (Qld) (Act), sections 227(1)(b) and 229(3)(a)
Body Corporate and Community Management (Accommodation Module) Regulation 2020 (Accommodation Module)
APPLICATION FOR INTERIM ORDER - where the applicant is challenging motions passed at the scheme's annual general meeting authorising repair works - where the applicant seeks an order to suspend implementation of the motions - whether the interim order sought by the applicant is warranted in the circumstances.
Act, ss 94, 100, 152, 270; Accommodation Module, s 170
The body corporate is ordered not to implement or commence any works approved under Motions 27, 28, and 29 passed at the Annual General Meeting on 2 July 2025.
2. Independent Engineering Assessment and Remediation Plan
Within 21 days of this order, the body corporate must engage SW Consult [SWC], or another suitably qualified and QBCC licensed structural waterproofing engineering firm, to:
(a) Conduct comprehensive testing and assessment of the approximately $360,000 of rectification and remediation works carried out by [Mr S][2] (QBCC licensed trade contractor - Carpentry), which were completed without written contracts and without independent engineering oversight, testing, or certification;
(b) Provide a detailed written report to the body corporate identifying: - The adequacy and compliance of completed works with structural waterproofing standards; - Any deficiencies or non-conforming work requiring rectification; - A comprehensive scope of works required to restore the structural waterproofing integrity of the buildings to a sound and compliant condition consistent with the body corporate's obligations under section 170 of the Accommodation Module;
(c) Prepare tender specifications for the required remediation works and oversee a competitive tender process to obtain at least two fully priced proposals from appropriately qualified and licensed contractors;
(d) Present the engineering report and alternative tender proposals to lot owners at an Extraordinary General Meeting, at which meeting a motion to formally rescind Motions 27, 28, and 29 from the 2025 AGM will also be considered.
Within 21 days of this order, the body corporate must formally request the Queensland Building and Construction Commission (QBCC) to investigate the works performed by [Mr S] for compliance with the Queensland Building and Construction Commission Act 1991 and associated regulations, including but not limited to the written contract requirements under section 67G of the QBCC Act 1991, scope of license compliance, and warranty provisions.
Within 7 days of receiving the waterproofing assessment report required under Order 2, the body corporate must:
(a) Provide a complete copy to the body corporate's insurance broker with full disclosure of all material findings; and
(b) Upload the complete report to the StrataMax portal with read access enabled for all lot owners and their authorised representatives.
Within 7 days of receiving the QBCC investigation report or findings required under Order 3, the body corporate must:
(a) Provide a complete copy to the body corporate's insurance broker with full disclosure of all material findings; and
(b) Upload the complete report to the StrataMax portal with read access enabled for all lot owners and their authorised representatives.
6. Mandatory Document Disclosure and Records Access
Within 14 days of this order, the body corporate must upload the following documents to the StrataMax portal with read access enabled for all lot owners and their authorised representatives:
(a) All quality assurance reports, test reports, and certification documents that have been provided to the insurance broker in relation to building works and structural waterproofing;
(b) All correspondence with the insurance broker regarding the status of rectification of the structural waterproofing defects identified in the 2023 SW Consult [SWC] report, including any correspondence regarding policy coverage, claims, or disclosure obligations;
(c) The complete Commercial Master Builders contracts (or any other executed contracts) for works performed by: - BRS Pty Ltd - [Mr S] - PM Concepts Pty Ltd, and the additional 18 documents sent to the insurer, all of which were referenced in item 2.2 of the Minutes of the Formal Committee Meeting held on 10 September 2025.
7. Retraction of Misleading Statements Regarding Building Condition
The body corporate must, within 14 days of this order, issue a formal retraction and correction of any statements made in body corporate records, minutes, newsletters, or correspondence asserting or implying that the buildings "cannot be made waterproof" or cannot achieve adequate structural waterproofing integrity. The retraction must:
(a) Acknowledge that such statements are inconsistent with the body corporate's statutory obligations under section 170 of the Accommodation Module to maintain common property in structurally sound condition;
(a) Confirm the body corporate's commitment to achieving full structural waterproofing integrity in accordance with engineering specifications and statutory requirements; and
(b) Be circulated to all lot owners and uploaded to the StrataMax portal.
8. Retraction of Defamatory Characterisations of Lot Owners
The body corporate must, within 14 days of this order, issue a formal retraction of statements made in body corporate records characterising lot owners who have raised questions about building works, requested transparency, or sought verification of insurance disclosure as "disgruntled owners" or as acting to harm the body corporate. The retraction must:
(a) Acknowledge that lot owners raising legitimate questions about compliance with statutory obligations and fiduciary duties are exercising their rights under the BCCM Act and Accommodation Module;
(b) Acknowledge that such characterisations are inconsistent with the body corporate's obligation under section 94 to act reasonably, fairly, and in the interests of all lot owners; and
(c) Be circulated to all lot owners and uploaded to the StrataMax portal.
9. Prohibition on Defamatory and Derogatory Communications
The body corporate and its committee members are ordered to immediately cease and refrain from issuing any communications, including but not limited to committee emails, newsletters, minutes, or correspondence, that contain derogatory, defamatory, or disparaging assertions against lot owners based on those lot owners holding or expressing views different from the committee's position, including views on:
(a) The adequacy or appropriateness of building works; (b) Compliance with statutory maintenance obligations; (c) Transparency and access to body corporate records; (d) Insurance disclosure obligations; or (e) Financial management and expenditure decisions.
This order does not prevent the body corporate from engaging in respectful debate or presenting factual information supporting committee decisions, but prohibits ad hominem attacks, defamatory characterisations, or communications designed to intimidate or discourage lot owners from exercising their statutory rights.
Suspend implementation of building works approved under Motions 27, 28, and 29 at the AGM on 2 July 2025, which have not yet commenced, pending final determination of this application.
27.a. BELLA VUE ROOF & FACADE REPAIRS INCLUDING APARTMENT 3111, 3112, 3113 & 3115 INTERNAL REPAIRS BY BRS (COMMITTEE RECOMMENDATION)
That the Body Corporate engage Building Rectification Services Contracting Pty Ltd (BRS) to complete repairs to the Bella Vue rooftop, facade and internal repairs to apartments 3111, 3112, 3113, & 3115 as per quotation 15569d (enclosed) at a total cost of $85,910.00 including GST, plus a contingency of 10%, being a total of up to $94,501.00 including GST.
And further that, the costs be paid from the existing Sinking Fund balance.
28.a. BELLA VUE FACADE AND INTERIOR REPAIRS TO BELLA VUE APARTMENTS BY BRS (COMMITTEE RECOMMENDATION)
That the Body Corporate engage Building Rectification Services Contracting Pty
Ltd (BRS) to complete repairs to the Bella Vue apartments 3041, 3051, 3063, 3071,
3081, 3085, 3088, 3091, 3092, 3093 and 3094 as per quotation 15568b (enclosed)
at a total cost of $164,010.00 including GST, plus a contingency of 10%, being a
And further that, the costs be paid from the existing Sinking Fund balance.
29.b. PORTO BELLAGO BUILDING REPAIRS BY [Mr S] (COMMITTEE RECOMMENDATION)
That the Body Corporate engage [Mr S] to complete repairs in
Porto Bellago to apartments 24, 26, 30, 31, 32, 33, 35, 36, 44, 60, 69, 73, 74 and B1,
Level 1 Hallway and B1 & Level 3 Hallway as per various enclosed quotations at a
total cost of $116,720.31 including GST, plus a contingency of 10%, being a total
And further that, the costs be paid from the existing Sinking Fund balance.
Consideration of legal issues and likelihood of success
[2] Given the circumstances and submissions made by the applicant, I considered it appropriate to anonymise this contractor's name and have done so throughout this decision.
[5] For general principles see: Australian Broadcasting Corporation v O'Neill [2006] HCA 46 and SDW2 Pty Ltd v JLF Corporation Pty Ltd & Ors [2017] QSC 1
[7] Section 170(2)(a) of the Accommodation Module
[8] See Klinger & Anor v Body Corporate for Costa D'Ora Apartments [2007] QDC 300, Magog (No.15) Pty Ltd v The Body Corporate for The Moroccan [2010] QDC 70, Seiwa Pty Ltd v The Owner's Strata Plan 35042 [2006] NSWSC 1157
[9] In fact, the body corporate ought to carry out proactive maintenance works to prevent defects from arising where possible.
[12] Luadaka v Body Corporate for The Cover of Emerald Lakes [2013] QCATA 183 applying Commonwealth Bank of Australia v Human Rights and Equal Opportunity Commission [1997] FCA 1311; Secretary, Department of Foreign Affairs and Trade v Styles [1989] FCA 342; Body Corporate for the Reserve v Trojan resorts Pty Ltd [2017] QCATA 53 (2 May 2017)
[13] Commonwealth Bank of Australia v Human Rights and Equal Opportunity Commission [1997] FCA 1311
[14] SWC notes this defect, while still major, is not a priority given that the other defects are allowing water ingress into habitable areas.
[15] Item 2 of committee meeting dated 5 February 2025.
[16] Minutes of committee meeting dated 10 September 2025.