[2016] NSWCATCD 89
NCAT Consumer and Commercial
2016-06-29
Original judgment source is linked above.
Reasons for Decision
The contract
The experts
The insurance Issue
The defects claim
Item 1, Water leaking into Garage from above ground detention pit 1. Failed waterproofing membrane - amount claimed $2,776.00
Item 2, Water leaking into Garage from control discharge pit 1 - failed waterproofing membrane - amount claimed $6,392.00
Item 3, 150mm stormwater pipe penetrating cavity wall of Garage - amount claimed $1,545.00
Item 4, repaired section of box gutter near outlet holding water - non-trademan like repairs - amount claimed include in item 5
Item 5, fasteners spaced 75 mm apart to be repaired - amount claimed included in item 9
Item 6, inadequate downturn folds of box gutter into recess outlet - amount claimed $1,388.00
Item 8, eight inadequate box gutter depth - amount claimed $18,419.00
Item 9, rivets spaced more than 40 mm apart at joints in box gutter
Items 10, 11 and 12, the height of the storm water pipe is higher than the up stand of the box gutter and parapet wall and inadequate pipe falls - amount claimed included in item 8
Item 13, defective flashing to steel beam causing water entry and damage to kitchen and laundry ceiling - amount claimed $4,131.00
Item 14 new cladding boards are not level to existing - amount claimed $1,800.00
Item 15, new cladding boards are not level to existing bow inwards - amount claimed $1,800.00
Item 16, water ingress from box gutter and outlet damaging suspended plasterboard ceiling in garage - amount claimed $3,583.00
Item 17, water ingress from box gutter and outlet damaging joinery unit placed at rear garage wall - amount claimed $3,403.00
Item 18, water damage and staining to plasterboard ceiling near rear wall kitchen - amount claimed $263.00
Item 19, water staining on suspended plasterboard ceiling from above box gutter - amount claimed $263.00
Item 20, plasterboard wall surface patched and not finally finished above cupboard doors - amount claimed $263.00
Item 21, final appearance of finish to all timbers - amount claimed $3,658.00
Margin
Conclusion
$2,776.00
$6,392.00
$1,272.00
$3,192.00
$1,800.00
$1,800.00
$ 236.00
21 $3,658.00 Subtotal $21,126.00 Margin 30% $ 6,337.80 Subtotal $27,463.80 GST 10% $ 2,746.38 Total $30,201.18
Costs
Economos