[2024] VCAT 416
General information, not legal advice.
Victorian Civil and Administrative Tribunal
2024-05-08
Particular J, Mr J
Original judgment source is linked above.
Application for leave to amend Points of Claim - Whether proposed amendments are time-barred - Lendlease Engineering Pty Ltd v Owners Corporation No 1 PS 526740E [2022] VSCA 105 and Parkview Constructions Pty Ltd v The Owners-Strata Plan No 90018 [2023] NSWCA 66 considered - discretionary considerations - effect of delay, failure to comply with directions and possible prejudice - leave to amend granted with exclusion of time-barred claims - Building Act 1993 s 134, s134A.
East St Falls Pty Ltd (ACN: 118 282 278) and others per schedule
Elenberg Fraser Pty Ltd (A.C.N. 081 961 855) (Under external administration)
East St Falls Pty Ltd v L.U Simon Builders Pty Ltd (Building and Property) [2024] VCAT 416
THE BUILDING ACT
134 Limitation on time when building action may be brought
(1) Despite any thing to the contrary in the Limitation of Actions Act 1958 or in any other Act or law, a building action cannot be brought more than 10 years after the date of issue of the occupancy permit in respect of the building work (whether or not the occupancy permit is subsequently cancelled or varied) or, if an occupancy permit is not issued, the date of issue under Part 4 of the certificate of final inspection of the building work.
(2) Despite subsection (1), a building action may be brought more than 10 years but less than 15 years after the date of issue of the occupancy permit in respect of the building work (whether or not the occupancy permit is subsequently cancelled or varied) or, if an occupancy permit is not issued, the date of issue under Part 4 of the certificate of final inspection of the building work if -
(a) the building action is a cladding building action; and
(b) the building action has become or becomes prohibited on or after 16 July 2019 but before 1 December 2023 by this section as in force at any time before the commencement of section 49A of the Building Amendment (Registration and Other Matters) Act 2021.
(3) in this section -
cladding building action means a building action in connection with, or otherwise related to, a product or material that is, or could be, a non-compliant or non-conforming external wall cladding product.
It is s 134(1), rather than s 134(2) and (3), which is of importance in the East proceeding.
(a) Occupancy Permit No. 13101OP1 dated 13 June 2008 (being for the East Building (Level 1 and 2 (including common and ancillary areas) and Tenancies ER1, ER2, ER3, ER4 and ER5));
(b) Certificate of Final Inspection No 13101F7b dated 13 June 2008 (being for the East Build (Tenancies ER6 and ER7));
(c) Certificate of Final Inspection No. 13101F7c dated 14 October 2008 (being for the East Building (Stair 7 - Level 1 and 2));
(d) Occupancy Permit No. 13101OP2 dated 27 March 2009 (being for the East Building (Level 1 Amenities/Undercroft/Part Common Areas and Level 2-6 Residents));
(e) Occupancy Permit No. 13101OP3 dated 27 March 2009 (being for the East Building (Level 1 Amenities/Undercroft/Part Common Areas and Level 2-6 Residents, excluding the Level 2 Day Spa));
Those occupancy permits and certificates of final inspection are within exhibit "MNM-1" to the affidavit.
134A Limitation on time when plumbing action may be brought
Despite anything to a contrary in the Limitation of Actions Act 1958 or in any other Act or law, if a compliance certificate is issued in respect of plumbing work under Part 12A, an action (including a counter-claim) for damages for loss or damage arising out of or concerning any defects in the work cannot be brought more than 10 years after the date of issue of the certificate.
(i) Paragraph 7A, which alleges the Building Code of Australia's requirements for external walls to be non-combustible and for a building to be fire-resistant.
(ii) Paragraph 8A(a): that LUS carried out the works using aluminium composite panels.
(iii) Particular J beneath paragraph 17: that the works were defective because the panels were combustible and non-compliant with the Code.
(iv) The last sentence beneath paragraph 17: "Further particulars of the defects in the works (Defects) are set out in Schedule B".
(v) Paragraph 19A: that the panels were combustible, not fire-resistant, non-compliant with the Code, constituted an undue risk of fire spread via the façade of the building, and were not good or fit for the purpose of being used in the external walls of the building.
(vi) Paragraph 19B: the matters alleged in paragraph 19A amounted to a breach of the Domestic Building Contracts Act warranties and to a breach of the Code.
(vii) Paragraph 20: until the panels are rectified the applicants are not covered by a policy of insurance for any damage that results from defects in the panels.
(viii) Paragraph 21: loss and damage insofar as they result from the panels being defective.
"(a) Construction details not followed.
(b) Gaps in timber cladding.
(c) Movement in timber cladding.
(d) Ineffective cappings/ flashings
(e) Incorrect fixing of cappings/ flashings."
1. Construction details not followed in that 150 mm wide x 28 mm thick ship lap boards were specified but 90 mm wide x 19 mm thick floorboards were installed.
2. Gaps in the Timber Cladding.
3. Movement in the Timber Cladding.
4. Ineffective cappings/ flashings
5. Incorrect fixing of cappings/ flashings.
6. Horizontal untreated pine battens installed behind the Timber Cladding.
7. Timber Cladding was not sealed in its entirety prior to installation.
8. Timber Cladding was combustible and non-compliant with the requirements of the BCA,[4] as to which the applicants refer to paragraph 19C below.
E. With respect to roof plumbing:
1. Water has and does leak through roofing into below lots
2. The roof, eaves, flashings and gutters were not installed in compliance with relevant and applicable Australian Plumbing Standards at the time of installation.
3. Non-compliant design.
(c) to add or substitute a new cause of action, together with a claim for relief on the new cause of action, being a new cause of action that, in the court's opinion, arises from the same (or substantially the same) facts as those giving to an existing cause of action and claim for relief set out in the originating process.
So the legislation required a focus on the "cause of action" expressed in the originating process and whether the "new cause of action" arose from similar facts.
Lot E201 - Timber cladding on External Boundary Walls
i. External timber cladding supplied is not in conformance with architectural specification, which required 150mm wide x 28mm thick dressed vertical shiplap cladding
ii. Cladding has moved, twisted peaked as well as become misaligned and or detached
iii. Bottom edges of cladding boards were not splayed or sealed
iv. Inadequate or not suitable fasteners for fixing the cladding to the battens
v. Horizontal untreated pine battens installed behind the cladding
vi. Timber cladding is combustible and not suitable or fit for purpose as an external wall
vii. As installed, the timber cladding is not fit for purpose
We should, however, state in the plainest of terms that we regard it as undesirable that limitation questions of the kind under consideration should be decided in interlocutory proceedings in advance of the hearing of the action, except in the clearest of cases. Generally speaking, in such proceedings, insufficient is known of the damage sustained by the plaintiff and of the circumstance in which it was sustained to justify a confident answer to the question.
The tribunal is not a court of pleading. Nonetheless, in determining the appropriate approach of the tribunal to proposed amendments of points of claim or points of defence, it is useful to bear in mind the principles which apply to applications for amendment to pleadings in courts of higher jurisdiction. In such cases, the guiding principle is that a court should permit amendments in order to enable the real questions in controversy between the parties to be determined upon a full hearing of the case at trial. A proposed amendment to a pleading will only be disallowed if it would be futile, in the sense that it would have been struck out if it had appeared in the original pleading. The power to strike out summarily an action, or a substantive cause of action, is exercised sparingly in courts of higher jurisdiction. It is only invoked where it is clear that the action, or the cause of action, is so untenable that it cannot possibly succeed.
An application for leave to amend a pleading should not be approached on the basis that a party is entitled to raise an arguable claim, subject to payment of costs by way of compensation. There is no such entitlement. All matters relevant to the exercise of the power to permit amendment should be weighed. The fact of substantial delay and wasted costs, the concerns of case management, will assume importance on an application for leave to amend.
In the same case, French CJ stated that undue delay, non-compliance with ordered timetables and potential waste of public resources "are to be regarded as both relevant and mandatory considerations"[23] upon an application for leave to amend a pleading.
I acknowledge that the applicant in each of the Proceedings have not complied with the Tribunal's order to file and serve an application for leave to file a Proposed 4APOC. As set out above, the applicants have been unable to do so in the time ordered because (a) of the change of solicitor and the need for my firm, together with new counsel, to receive the client file, read in, and form a view on the work needing to be undertaken (b) contact each of the sublessees to procure their consent and instructions.
Traverse Alpine Developments Pty Ltd (ACN: 152 793 256) (removed by order dated 23/05/23)
Alan Norman Ford & Christine Elizabeth Ford ATF Alan N Ford Superannuation Fund (removed by order dated 23/05/23)
Tonks Superannuation Pty Ltd ATF Tonks Family Superannuation Fund
Eilan Donan Pty Ltd (removed by order dated 23/05/23)
Maria Susanne Devlin (removed by order dated 23/05/23)
Moedski Pty Ltd ATF The Bellmoed Family Trust (removed by order dated 23/05/23)
Matthew Gregory Salisbury (removed by order dated 23/05/23)
Paul Poli & Oliver Nikolovski (removed by order dated 23/05/23)
Lochlee Pty Ltd ATF D B McKay Family Trust (removed by order dated 23/05/23)
NYTW Pty Ltd ATF The Zhao & Liu Family Trust (removed by order dated 23/05/23)
Patrick Management Pty Ltd ATF The Patrick Tonkin Superannuation Fund
Dr Heather Webber (removed by order dated 23/05/23) & Heathbren Pty Ltd
Merri Bridge Pty Ltd (removed by order dated 23/05/23)
Mount Carli Pty Ltd, Rosalina Acance Jnr & Lea Acance
Patrick Jean-Christophe Charles Laplagne & Virginia Gai Williamson
Jeffrey John Lahnor & Sharon Elizabeth Lahnor (removed by order dated 23/05/23)
Fallons Superannuation Nominees Pty Ltd (ACN 094 452 703)
[1] I made the order on 23 November 2023, in terms to which the applicants and LUS had consented. They submitted minutes of a consent order. By an administrative error the minutes produced a consent order dated 27 November 2023 made by Member F Marks.
[2] The parties argued the application on the footing that the proceeding had begun on 25 March 2019. The Tribunal's file shows, however, that the filing fee was paid on 26 March 2019.
[3] The affidavits are dated 2 December 2022, 27 March 2023, 1 May 2023 and 13 November 2023 respectively.
[6] The 2022 Act, s 2(i); Special Gazette (No 371) dated 26 July 2022.
[11] Lendlease Engineering Pty Ltd v Owners Corporation No 1 PS526704E [2022] VSCA 105.
[12] Parkview Constructions Pty Ltd v The Owners - Strata Plan No 90018 [2023] NSWCA 66.
[13] Owners Corporation PS No. 1 PS 519798G v May [2016] VCAT 399; Vincentis v SDJ Property Fifth Pty Ltd [2022] VCAT 29; Singleton v East Gippsland Building Permits Pty Ltd [2023] VCAT 943.
[14] Singleton v East Gippsland Building Permits Pty Ltd [2023] VCAT 943 at [54].
[18] Wardley Australia Ltd v Western Australia [1992] HCA 55; (1992) 175 CLR 514 at 533.
[19] See Paragraph 28 above and footnotes 5-10.
[20] Makrenos v Papaioannou [2008] VSC 83 at [10].
[21] Aon Risk Services Australia Ltd v Australian National University [2009] HCA 27; (2009) 239 CLR 175.
[24] Affidavit of 2 December 2022 paragraph 29 which summarises an affidavit of Teneile Jade Lambe dated 1 June 2022.
East St Falls Pty Ltd
L.U Simon Builders Pty Ltd
(1992) 175 CLR 514
(2009) 239 CLR 175