[2025] SACAT 69
General information, not legal advice.
SA Civil and Administrative Tribunal
2025-07-14
Original judgment source is linked above.
Dunne v Abilities Occupational Therapy Service [2025] SACAT 69
The applicant lodged a disciplinary complaint under the Building Work Contractors Act 1995 ('BWC Act') against the respondent, Abilities Occupational Therapy Service_._
The applicant contended that the respondent is a building work contractor or a building consultant pursuant to ss 3 and 20 of the BWC Act. Consequentially, the applicant contended that the respondent is required to be licensed and was subject to disciplinary action under the BWC Act. The applicant's contentions were made on the basis that the respondent carries on the business of performing building work or gives advice in respect of building work, in that it provides advice in relation to home support modifications, prepares drawings, assists in obtaining quotes from contractors, and furnishes reports.
The respondent submitted that it is a firm of occupational therapists and is neither a building work contractor nor a building work consultant as defined in the BWC Act and therefore, the Act does not apply to it.
Building Work Contractors - Complaints against building work contractors - Complaint by consumer - Proper cause for disciplinary action - Acting unlawfully, improperly, negligently, or unfairly in the course of conducting the business of the contractor - Application dismissed
Duncan v Bert Farina Constructions Pty Ltd [2024] SASCA 67
Woolworths Group Limited v Jackermis [2023] SASCA 31
Ms K Fitzgerald with Ms M Eaton, Gilchrist Connell, appeared for the respondent
"building work contractor" means - > > (a) a person who carries on the business of performing building work for others; > > or
(b) a person who carries on the business of performing building work with a view to the sale or letting (whether by lease, licence or other agreement) of land or buildings improved as a result of the building work;
"building" includes a wall or structure and part of a building or structure;
"building work" means -
(a) the whole or part of the work of constructing, erecting, underpinning, altering, repairing, improving, adding to or demolishing a building; or
(b) the whole or part of the work of excavating or filling a site for work referred to in paragraph (a); or
(c) work of a class prescribed by regulation;
"perform", in relation to building work, includes -
(a) cause building work to be performed; or
(b) organise or arrange for the performance of building work;
(a) carry on business as a building work contractor except as authorised by a licence under this Part; or
(b) advertise or otherwise hold himself or herself out as being entitled to carry on business as a building work contractor unless authorised to carry on business as such a contractor by a licence under this Part.
"building work contractor" includes - > > (a) a former building work contractor; and
(b) a person licensed as a building work contractor, whether or not carrying on business as a building work contractor; and
(c) a person formerly licensed as a building work contractor under this Act or as a builder under the repealed Act;
"building consultant" means a person (other than a registered architect) who carries on the business of giving advice or furnishing reports in respect of domestic building work (whether being work already performed, work in progress or work that may be required in the future), and includes a former building consultant;
"building work supervisor" includes - > > (a) a former building work supervisor; and
(b) a person registered as a building work supervisor whether or not acting as a building work supervisor; and
(c) a person formerly registered as a building work supervisor under this Act or the repealed Act;
21 - Cause for disciplinary action > > (1) There is proper cause for disciplinary action against a building work contractor if -
(a) licensing of the contractor was improperly obtained; or
(b) the contractor has acted contrary to an assurance accepted by the Commissioner under the Fair Trading Act 1987; or
(c) the contractor or another person has acted contrary to this Act or otherwise unlawfully, or improperly, negligently or unfairly, in the course of conducting, or being employed or otherwise engaged in, the business of the contractor; or
(d) the contractor has failed to comply with an order made by a court under Part 5; or
(e) events have occurred such that the contractor would not be entitled to be licensed as a building work contractor if the contractor were to apply for a licence.
(2) There is proper cause for disciplinary action against a building work supervisor if -
(a) registration of the supervisor was improperly obtained; or
(b) the supervisor has acted unlawfully, improperly, negligently or unfairly in the course of acting as a building work supervisor.
(3) There is proper cause for disciplinary action against a building consultant if -
(a) the consultant has acted contrary to an assurance accepted by the Commissioner under the Fair Trading Act 1987; or
(b) the consultant has acted unlawfully, improperly, negligently or unfairly in the course of acting as a building consultant.
(4) Disciplinary action may be taken against each director of a body corporate that is a building work contractor or building consultant if there is proper cause for disciplinary action against the body corporate.
(5) Disciplinary action may not be taken against a person in relation to the act or default of another if that person could not reasonably be expected to have prevented the act or default.
(6) This section applies in relation to conduct occurring before or after the commencement of this section.
(1) In proceedings in respect of an offence against this Act, if it is proved that a person performed building work for another for fee or reward, the person is, unless the contrary is proved, to be taken to have been carrying on business as a building work contractor.
This registration group, incorporates design and subsequent changes to the participants home. Home modification design and construction includes installation of equipment or changes to building structures, fixture, or fittings to enable participants to live as independently as possible or to live safely at home.
Experience and understanding of concepts and limitations of AS1428 and other disability access standards and their application in accordance with a persons needs and specifications of plans. Must hold current license or registration in the relevant State or Territory.
Some supports must be delivered by people with specific qualifications, experience or licensing. Some professions (e.g., those regulated under AHPRA) also require registration or certification independent of any requirements relating to disability services. The table below outlines a list of professions and the usual expectation about qualifications or credentialing, for registration purposes. For example, where the profession is listed as "Physiotherapist", the provider is declaring as part of the registration process that they are a qualified and AHPRA registered Physiotherapist. Some states and territories will also require professions to meet other additional requirements for some registration groups. You can find further information in the relevant state or territory section in this guide. You can contact provider.registration@NDIS.gov.au for advice about qualifications or experience not listed. > > The following health professions are regulated and must hold current AHPRA registration:
The following professions must meet the registration or certification requirements of the relevant State or Territory:
Professional qualifications or membership (all qualifications and memberships must be current) > > Profession name - Professional qualifications or membership (all qualifications and memberships must be current) > > Audiologist - Audiology Australia accredited Audiologist or Audiologist member of AC_Aud_ equivalent > > Dietitian - Accredited Practising Dietitian with the Dietitians Association of Australia > > Orthoptist - Registration with the Australian Orthoptic Board > > Orthotist - Membership with the Australian Orthotic Prosthetic Association and/or recognition by a state/territory orthotic program as a qualified orthotic practitioner > > Pedorthist - Registration with the Australian Register of Pedorthists > > Prosthetist - Membership with the Australian Orthotic Prosthetic Association and/or recognition by a state/territory prosthetic program as a qualified prosthetic practitioner > > Speech Pathologist - Practicing membership with Speech Pathology Australia > > Audiometrist - Membership with the Hearing Aid Audiometrist Society of Australia or audiometrist member of AC_Aud_ equivalent > > Art Therapist - Membership with the Australia New Zealand Arts Therapy Association (ANZATA) Developmental Educator - Full membership of Developmental Educators Australia Inc (DEAI) > > Exercise Physiologist - Accredited exercise physiologist with Exercise and Sports Science Australia (ESSA) > > Interpreter/Translator - Certified or Recognised Practising Interpreter or Translator with the National Accreditation Authority for Translators and Interpreters Ltd (NAATI) > > Music Therapist - Active "Registered Music Therapist" with the Australian Music Therapy Association > > Social Worker - Membership with Australian Association of Social Workers Rehabilitation Counsellor - Membership with the Australian Society of Rehabilitation Counsellors Inc or equivalent > > Welfare Worker - Membership with the Australian Community Workers Association or equivalent > > Counsellor - Membership with the Australian Counselling Association or equivalent > > Personal Trainer - Personal training qualification, Certificate III, IV or Diploma in Fitness or equivalent > > Accountant/Book-keeper - membership with ATMA, AAT, CBK, ACCA, ABAL, CPA, ICB, IPA or CAANZ or equivalent > > Rehabilitation Engineer - Chartered Professional Membership with Engineers Australia > > Aboriginal Health Worker - Registration with the Aboriginal and Torres Strait Islander Health Practice Board of Australia.
A rehabilitation engineer is a professional engineer applying informed theory and practice, including specialised knowledge and application of technologies, to safeguard and improve the quality of life of people who use, or would benefit from, AT, often in collaboration with a multidisciplinary team > > (AT stands for Assisted Technology).
Home modifications are custom-built changes to a participant's home to help them access and use areas of their home. > > Home modifications can be minor changes or they can be more complex. > > Minor home modifications are home modifications that don't change the structural parts of the home or cost more than $20,000. They have 2 categories:
Complex home modifications usually need building approvals or permissions, and certification of work such as plumbing and electrical works. They may involve highly complex or technical works, or impact several areas of a participant's home. > > Home modification (HM) assessments > > The NDIA needs sufficient evidence to decide which home modification supports are reasonable and necessary to include in a participant's plan. > > Plans include funding for a home modification assessment and should also include advice on the scope of the home modification to be assessed (for example, improved access to the bathroom). > > Home modifications assessors > > A home modifications assessor is an occupational therapist with skills to provide detailed and complex home modifications assessments. > > The NDIA expects that a home modifications assessor required for Category B minor home modifications and complex home modifications should demonstrate:
States and territories have different rules about building approvals and permissions and when you need a building contract. You and your builder are responsible for making sure you have the right approvals and permissions for your building works. > > You'll need to check your local council requirements for your home modifications. Most local councils will have information on their website or you can call them. > > We'll tell you if you need to give us written confirmation that you have the appropriate building approvals and certifications. We might need this before we can make certain payments to you or the provider. You'll need the necessary certifications for the completed work before we can pay or approve the final stage payment for home modifications. > > Minor home modifications may also need trade certifications, such as an electrical certificate of compliance. Or plumbing certification for changes that affect the 'wet seal', such as modifications to a bathroom floor or lower walls. > > You are responsible for making sure your home modifications meet the legal and administrative requirements. Your building works project manager can help you check your home modification complies with the required standards. > > What are your responsibilities for contracts? > > You, or the homeowner, will sign the building contract and enter into a legal agreement with your builder. We are not a party in this contract or involved in this agreement. > > Your commitments are the same as if you were paying for the work with your own money. This includes making sure you or your providers comply with any local authority regulations for the modifications.
Your occupational therapist or home modification assessor needs to approve any changes to your recommended supports. They need to check the modifications will still meet your needs.
Home modification assessors > > Home modification assessors are occupational therapists who are qualified to recommend more detailed home modifications supports. They will review your functional needs and goals in your home. > > Your home modification assessor will recommend the specific home modification supports you need and explain how they relate to your disability and goals. You should make sure your assessor understands what you want the home modification to achieve. > > They can also help identify if you'll need additional supports while your modifications get done, like hire facilities or temporary accommodation. > > Your home modification assessor may work with a building construction practitioner. They will work together to complete the home modification assessment report and submit this to us. We have assessment templates on our website. > > Your home modification assessor should be independent from your builder. > > When your home modification is complete, your home modification assessor may review your NDIS funded home modification supports. For complex home modifications they will do another assessment with you after you've been using your new supports. This is to make sure the home modification meets your disability support needs. > > Builders > > Builders construct your home modifications. Builders are responsible for meeting all legal and administrative requirements, like the National Construction Code and Australian Standards. They are responsible for making sure the building site is safe when home modification works are underway, and for fixing their work if they get it wrong. > > You should have a service agreement with your builder. Or you can use a building contract if your state or territory building authority requires one. The service agreement or building contract details what modifications will be done and how much they will cost. > > It should outline which providers are responsible for the work, and how and when your modifications will be completed. The service agreement or building contract should also outline:
If you have complex home modifications, it's best they are managed by only one builder. This is important when your home is a building site. It means one builder will manage all the trades in your home and is responsible for safety requirements. It's also usually better value for money. > > A building works project manager can help you check your contract and arrangements with your builder. > > Building construction practitioners > > Building construction practitioners have building knowledge and expertise to:
They could be an architect, engineer, builder, or other building related practitioner. They should be independent from any of the builders who provide quotes for your job. > > A building construction practitioner will work closely with you and your home modification assessor to help plan the home modification. They will make sure the home modification supports recommended by your assessor are possible in your home. They will also work out how the modifications can be done in the most effective way. > > Your building construction practitioner will review your property and home. They will give information to support the home modification assessment. They will also identify if any preliminary works by building specialists like engineers, surveyors or architects, are needed to help plan your modifications. > > You can ask your building construction practitioner to also be your building works project manager if they have the right skills and if we have funded this. > > You can ask your building construction practitioner to help you check builder credentials and get builder quotes. > > Building works project managers > > If you have a very complex home modification, we'll include funding for a building works project manager. This could be because the work is high risk, or if you need extra help to manage the home modification. > > Your building works project manager is independent from your builder. They can help you understand your building contract and communicate with your builder. > > ... > > [The document goes on to also refer to Independent Building Certifiers] > > Other building professionals > > Some complex home modifications may need building professionals with special skills, like engineers, surveyors, or other building experts. We can only fund these services if they meet the NDIS funding criteria. > > Your building construction practitioner will identify if a building professional is needed to help plan your home modification, or during or after construction. > > If we don't fund a building professional, you can choose to pay for this based on your individual needs. > > In some cases, NDIS funded home modifications may be part of your larger building project. You'll need to decide whether to hire professionals with special skills to manage the risks involved in your own building project. We'll only fund building professionals related to the NDIS funded building works. We don't provide funding related to your private works.
He has a passion for rehabilitation, assessing and prescribing complex home modifications and is one of a small number of therapists in the state with specialist NDIS training to complete major home modifications.
A complex home modification assessment involves myself making an appointment with a particular client. I will then attend the home of that particular client. We will talk through their background. It might be their disability or particular illness that they have. We will talk through and given my registration as an occupational therapist, I have an understanding of their disability. I then will talk through what their future goals are, whether it be they wish to remain in their house until they pass away, or as their condition may continue to degenerate. I then make a series of recommendations based on that person, based on their home environment and based on what they choose to do and their goals. And, then come up with a series of recommendations and put that into a report.
Many NDIS participants report difficulty managing everyday activities in their homes. For some, this is due to poor technique, for others - a lack of equipment or minor home modifications such a simple ramps and rails. For a limited view, there may be a need for complex home modifications: those requiring structural changes to the dwelling. > > Whilst any Occupational Therapist is able to prescribe simple home modifications for National Disability Insurance Scheme (NDIS) participants, the National Disability Insurance Agency (NDIA) has introduced a process where the prescription of complex home modifications is limited to expert Occupational Therapists. These therapists review the participants functional performance and thoroughly investigate all options to assist them to access and use essential areas of their home prior to the prescription of complex modifications. Participants have a choice of these OT's from a list in each region, and are assured that these therapists are experts in this practice area and have been trained in working with the NDIA i.e., considering all alternatives, understanding reasonable necessary and providing the justification documentation required. > > This two-day training package has been designed in collaboration with the NDIA day to address the specific challenges and issues that have been identified for occupational therapists who wish to assess participants with complex home modification requirements and develop concert plans for NDIS participants ...
I certainly don't tell them how to do it. So, from an occupational therapist perspective our expertise comes from function. So we have an understanding of their medical condition, we understand how that is going to change over time, how it may evolve. We then work alongside those builders to say: yes, we need to widen it to this point because we need to have a wheelchair fit through it. But, that is certainly where it finishes.
So I do reference the Australian Standard as AS1428.1. So, I will within my report and certainly within those diagrams, I have always drawn up the ramp. So I use specific software to allow me to do that and that is purely based so that I can give the builder a really clear understanding of what needs to happen. I don't tell them how to actually construct it. I just tell them it needs to be a certain length. It may need to be longer than the Australian Standards as well, depending on their function and their disability. So, I can stray from it, based on their actual clinical function and their predicted future function.
I have no idea about where plumbing goes and everything like that. Quite often, with those complex modifications we're talking about removing walls. Because the average standard house is fairly small. So, more often that not, I'm recommending walls be removed, but I'm not getting to the level of detail as far as relocating plumbing or electrical work because I don't have the knowledge about that.
So, in relation to NDIS funding, that particular report you're referring to, which has got the recommendations based on all the photographs and things like that, the NDIS have an assessment template that we fill out that provides a bit more about the medical background and what our recommendations are. So that basically the NDIS can look at the application form and form their judgment about the extent of the home modifications, which is outlined in that second document with the photos, that they can make a decision as to how much or how little funding they will contribute to that person's application.
The NDIS and this Service Agreement > > This Service Agreement is made for the purpose of providing supports under the Participant's National Disability Insurance Scheme (NDIS) plan. > > The Parties agree that this Service Agreement is made in the context of the NDIS, which is a scheme that aims to: > > • support the independence and social and economic participation of people with disability, and > > • enable people with a disability to exercise choice and control in the pursuit of their goals and the planning and delivery of their supports. > > Schedule of supports > > The Provider agrees to provide the Participant occupational therapy assessment and intervention. > > .... > > [under the heading of consents]: > > I consent to having an Occupational Therapy assessment and intervention undertaken of my function and/or home environment. I understand that this is being done to provide recommendations and advice regarding my ongoing safety and independence. > > I consent to having photographs taken of my home in order to improve the accuracy of possible recommendations if indicated.
80.1 Installation of automated swing dates to enable independent wheelchair access into and out of the front access;
80.2 Installation of a retrofitted automatic door opener;
80.3 Changes to the lounge access to enable wheelchair access including removing an existing doorway, widening the opening and replacing with a new door, relocating light switch.
80.4 Changes to the bathroom and toilet areas: removing a lined cupboard; adding an external sliding door and widen bathroom; remove walls between toilet bathroom shower bath and existing vanity; changes to alcove; retiling; regrading of floor to provide stepless entry and sufficient fall back to shower waste; new basin; L shaped rail in shower alcove; supply and install bidet; handheld shower hose on sliding rail; mixer tap with extension handle in shower alcove; angles rail on left side of toilet; install mirror above vanity.
Mr Gareth Dunne is a 51 year old male who resides with his wife and three children in the own home in the regional township of Roseworthy, South Australia. > > Gareth received a diagnosis a Motor Neuron Disease (MND) in June 2022 following noticing reduced strength in his left knee. MND is a rapidly progressing neurological disease that affects the motor neurons. > > Gareth has been informed by his neurologist that he has a life expectancy of approximately 2 years. > > Gareth currently presents with the following physical impairments:
Gareth has co-existing conditions of asthma and anxiety. > > The nature of MND means that Gareth's mobility and independence will progressively worsen and he will require total assistance in all aspects of his life. > > Gareth is well supported at home by his family. It is Gareth and his families' wish that he resides at home throughout this journey of MND.
These specific items were discussed in a home visit on Wednesday the 31st of January 2024 whereby Kate and Gareth were both consenting to the 500mm wide wall hung basin alongside the position of other fittings. > > Following completion of all works, Kate communicated via SMS that that she was wanting the above issues rectified (despite previously communicating verbal consent). A further home visit was then completed on Monday the 19th of February to their home however neither of them was able to or wished to be present, and therefore OT, Dave's bathrooms' owner (Dave) and employee (Kurt) were the only one's present. A review of Kate and Gareth's outstanding issues were reviewed and discussed but due to the owners not being present. > > OT reviewed both the basin and curtain rail height, and they both comply with AS1428.1. Discussion occurred on site about how to rectify the situation but given Gareth or Kate were not present, an email outlining potential further actions was sent to Kate & Gareth on Monday the 19th of February 2024 at 3:02pm. This included information that the shower curtain height and vanity meet the Australian Standard requirement. > > They were advised and acknowledged that any additional tile height (required to enable greater height of shower curtain) would need to be self-funded. > > Since this email, Kate has not been willing to engage in further conversation regarding OT's reply to reach an outcome where all parties are satisfied. At no stage throughout the entire build process did Kate raise any issues with me as the OT. > > I have reviewed the completed home modifications and feel the work has been completed to a high standard. > > The work is clinically appropriate for Gareth current and future needs, and I support full payment of Dave's bathrooms outstanding invoices. > > Please note that the original recommendations, and minor adjustments to the scope of works have been made in consultation with the following documents, and the completed modifications also adheres to all of the below documents. > > 1) NDIS Complex Home Modifications Operational Guidelines Dated 09 August 2022 > > 2) Australian Standard 1428 Design for Access and Mobility Part 1 (General) (AS 1428.1) > > 3) NDIS Home Modifications - Guidance for Builders and Assessors > > 4) The reasonable and necessary criteria outlined in National Disability Insurance Agency Act 2013, section34(1)(a)-(f) 2013.
I am writing to provide clear evidence to the invoice that will be submitted for payment to Kate & Gareth Dunne who self-manage Gareth's NDIS plan. > > Mr Gareth Dunne is a 51-year-old Male who resides with his wife, Kate and children in their own home in Roseworthy, SA. Gareth has a primary diagnosis of Motor Neuron Disease, which affects mobility and ability to perform activities of daily living. > > I have been providing OT services until recently for Mr Gareth Dunne. > > As all parties have discussed throughout the journey there are items that have unexpectedly come up that were not included in your original quote/scope of works and thus we have requested that the family fund these out of a different budget line. > > I am placing this request with consideration of the NDIS reasonable and necessary principles (Section 34 of the National Disability Insurance Scheme Act 2013)
The following items are clinically recommended outside of the major home modifications scope of works: > > 1) Supply and fitting of an RPZ valve. > > Note that the plumber initially stated that the RPZ valve was not required but when you went to purchase it, the supplier stated that it was essential. > > 2) Supply and fitting of a towel rail and towel hook. > > 3) Widening of both bathroom door and opening between lounge and dining room > > It was noted in the original scope that the following recommendation was made: > > Add external sliding door (to match existing) and widen into bathroom to 850mm. During the quoting phase, it was noted that the current opening would achieve this width and thus did not require widening. During an additional home visit once the bathroom and external walls had been partially demolished, it was noted that the opening would not be sufficient and widening of the this entrance was essential. All parties also agreed that a 920mm hinged door would be supplied and fitted. I understand that supply and fitting has been included in the initial quote but there would be a small additional charge to widen the door and make good. > > It should also be noted that this Tax Invoice has been modified since sending it to the Dunne's with the removal of the rails as these should have been in the original cost.
99.1 Carries on business as a firm of occupational therapists.
99.3 Does not organise the performance of building work in the sense contemplated by the BWC Act. It does arrange quotes from a builder so that the builder in turn organises and supervises the building work.
99.4 Was not a building work contractor as defined by the BWC Act.
99.5 Does not hold itself out or advertise that it was entitled to carry on business as a building work contractor, but rather does hold itself out as a firm that can provide services where an occupational therapist will make recommendations about what building work is recommended from an occupational therapist's perspective.
99.6 Was not required to hold a building work contractor's licence.
[25] The applicable principles are well understood. In any exercise of statutory interpretation, it is necessary to start with the language of the provisions. Those provisions must be construed in the context of the language of the statute as a whole. In Project Blue Sky Inc v Australian Broadcasting Authority, the plurality explained that the primary object of statutory construction: > > ... is to construe the relevant provision so that it is consistent with the language and purpose of all the provisions of the statute. The meaning of the provision must be determined "by reference to the language of the instrument viewed as a whole". In Cmr for Railways (NSW) v Agalianos, Dixon CJ pointed out that "the context, the general purpose and policy of a provision and its consistency and fairness are surer guides to its meaning than the logic with which it is constructed". Thus, the process of construction must always begin by examining the context of the provision that is being construed. > > [26] The Court is to give the words used the meaning that the legislature is taken to have intended them to have. That will ordinarily correspond with the grammatical meaning of the section. However, the context, the consequences of a particular construction and the purpose of the statute may sometimes require a non-literal interpretation to be adopted. Further, absent an examination of context and purpose, a literal interpretation may be impossible, or meaningless. > > [27] Having said that, as the appellant emphasised, considerations of context and purpose do not amount to an invitation to rewrite the legislation. As French CJ and Hayne J said in Certain Lloyds Underwriters v Cross: > > The purpose of legislation must be derived from what the legislation says, and not from any assumption about the desired or desirable reach or operation of the relevant provisions. > > [28] To that end, as the plurality said in In Taylor v Owners - Strata Plan 11564: > > The question whether the court is justified in reading a statutory provision as if it contained additional words or omitted words involves a judgment of matters of degree. That judgment is readily answered in favour of addition or omission in the case of simple, grammatical, drafting errors which if uncorrected would defeat the object of the provision. It is answered against a construction that fills gaps disclosed in legislation or makes an insertion which is "too big, or too much at variance with the language in fact used by the legislature". > > (Footnotes omitted)
[39] The fundamental task of the Court in construing legislation is, of course, to give the words used in the relevant provisions the meaning that the legislature is taken to have intended. > > [40] The contemporary approach to this task is conveniently summarised in the following passage from the reasons of Kiefel CJ, Gordon and Nettle JJ in SZTAL v Minister for Immigration & Border Protection: > > The starting point for the ascertainment of the meaning of a statutory provision is the text of the statute whilst, at the same time, regard is had to its context and purpose. Context should be regarded at this first stage and not at some later stage and it should be regarded in its widest sense. This is not to deny the importance of the natural and ordinary meaning of a word, namely how it is ordinarily understood in discourse, to the process of construction. Considerations of context and purpose simply recognise that, understood in its statutory, historical or other context, some other meaning of a word may be suggested, and so too, if its ordinary meaning is not consistent with the statutory purpose, that meaning must be rejected. > > [41] Similarly, in CIC Insurance Ltd v Bankstown Football Club Ltd, Brennan CJ, Dawson, Toohey and Gummow JJ emphasised that context in its widest sense and statutory purpose are to be considered from the outset, and not only when an ambiguity might be thought to arise on the text. This may include consideration of matters such as the existing state of the law, and the mischief which the legislation was intended to remedy. > > [42] In the case of South Australian statutes, s 14 of the Legislation Interpretation Act 2021 (SA) expressly provides that the interpretation that best achieves the purpose or object of the Act (even if not expressly stated in the Act) is to be preferred to any other interpretation. > > [43] Any inconvenience or improbability in the result of a construction may indicate a meaning other than the literal meaning of the relevant provision. Whether a particular construction assists or interferes with the coherent operation of the relevant legislation scheme may also be a relevant consideration. > > [44] At the same time, contextual and purposive indications may not be used to rewrite the legislation; the meaning derived must be consistent with the language in fact used in the relevant legislation. Further, the purpose must be one which may be discerned from the legislation itself, read in the context of any relevant extrinsic material. Legislation must not be construed on the basis of some a priori assumption as to the statutory purpose, or as to the desirable reach or operation of the relevant provision. > > [45] In SZTAL v Minister for Immigration & Border Protection, Gageler J described the task as one involving "constructional choice" between the competing meanings that may be available: > > The constructional choice presented by a statutory text read in context is sometimes between one meaning which can be characterised as the ordinary or grammatical meaning and another meaning which cannot be so characterised. More commonly, the choice is from "a range of potential meanings, some of which may be less immediately obvious or more awkward than others, but none of which is wholly ungrammatical or unnatural", in which case the choice "turns less on linguistic fit than on evaluation of the relative coherence of the alternatives with identified statutory objects or policies" > > (Footnotes omitted)
119.1 Whether the work is or will be in compliance with building codes and regulations such that it is structurally sound, compliant and properly implemented.
119.2 Whether the work is or will be done in accordance with the contract.
119.3 Whether the building work has or will be performed in a way that complies with statutory warranties, and this focuses on issues to do with design, quality and compliance rather than simply functional needs.
Dunne
Abilities Occupational Therapy Service [2025] SACAT 69