CITATION: Douglas v Strata Corporation No 15944 [2024] TASSC 25
STRATA CORPORATION NO 15944, 69 AUBURN ROAD, KINGSTON
Equity - Equitable remedies - Interlocutory injunctions - Generally - Cause of action in nuisance where damages and injunction sought as final relief - Past events of flow of water from defendant's land onto plaintiff's land - Where leaks from defendant's reticulated water system alleged to be one source - Interlocutory order sought in prohibitory terms to prevent a repetition - Where practical effect of order would require positive action - Where making of order likely to finally decide the issue - Damages an adequate remedy - Relief refused.
Racecourse Totalizators Pty Ltd v The Totalisator Administration Board of Queensland [1995] FCA 1405; (1995) 58 FCR 119; Mineralogy Pty Ltd v Sino Iron Pty Ltd [2016] WASCA 105, considered.
Judgment Number: [2024] TASSC 25
VICKIE LEE DOUGLAS v STRATA CORPORATION NO 15944, 69 AUBURN ROAD, KINGSTON
"The respondent be restrained from operating or permitting to be operated its system ... so as to cause or permit water to be discharged from that property onto the plaintiff's property ... to such a degree as to damage the plaintiff's property or to cause an unreasonable interference with the use or enjoyment of the plaintiff's property".
(a) In early March 2022 the plaintiff observed significant quantities of water flowing onto and over her property from 69 Auburn Road "over/through" the shared boundary. A considerable quantity of water was seen to be running over No 7/69 Auburn Road through the rear boundary fence.
(b) The water that came from the defendant's property flowed through drains at the base of the retaining wall and left a build-up of mud and silt. Slime appeared, and covered the concrete area at the base of a wall.
(c) When this was notified to the occupants of Unit 6, the secretary of the defendant, (Anneke Tadema), spoke to the plaintiff, apologised for the water discharge, and said the cause was a burst pipe and that she was organising a plumber.
(d) On 20 March 2022, water was still "seeping" through the retaining wall. Ms Tadema told the plaintiff the water would be turned off at 69 Auburn Road at various times; it appears to have been two hour intervals.
(e) On 27 March, the plaintiff told Ms Tadema that water was still flowing through onto her property and that slime was still being created at the base of the retaining wall. She was advised that a plumber had visited but could not find anything and there was a need to further investigate the situation. The water had been turned off.
(f) On the same day Mr Amos told the plaintiff there were bursting mains as a result of cheap plastic fittings used in the original construction. He said they were going to install a water restrictor to reduce water pressure and turn the water off at non-peak times.
(g) On all occasions when it appeared there was an issue with the main water system on the defendant's property, the basement of Unit 7 would flood. Mr Amos noticed that once the mains water was turned off and any issue rectified, the water would very quickly recede from that basement, and dry out within several days. The flooding of the Unit 7 basement was a good indicator of a problem.
(h) On 29 March 2022 Ms Tadema told the plaintiff the leak had been discovered and a plumber had been contacted. She said there should not be any water as there was no pressure due to the water being turned off. The leak seems to have been fixed by a plumber on 27 March. On 1 April 2022 Ms Tadema told the plaintiff of this.
(i) In the period from April to November 2022, the defendant made efforts to engage a plumber to install a pressure reduction value, as had been recommended by the plumber who attended in March. Difficulties were encountered. On two occasions different plumbers were engaged to install a valve, but, without explanation, neither attended the property at the appointed time and made no further contact. On 6 December 2022, the owner of Unit 6 noticed water seeping under neighbouring property and advised Mr Amos. Again, a plumber was booked to install the valve, this time for 7 December but again, without explanation, that plumber did not turn up.
(j) On 21 December 2022, the plaintiff observed water "pouring over the top of the retaining wall and through the drain holes". The backyard of the property "between the retaining wall and the boundary was drenched, with water seen flowing from number 69 Auburn Road across the boundary". The same thing was seen on 26 December.
(k) On 26 December 2022, a plumber went to the defendant's property and rectified an issue with the mains pipe on the defendant's property by excavating the location of the suspected leak and undertaking repairs and replacement of the "poly water pipes". The defendant continued to restrict the water use until a valve had been installed.
(l) On 31 December 2022, Mr Amos emailed the plaintiff, explaining that they had made arrangements for a pressure valve to be installed, but those arrangements had fallen through each time. He said there was a pressure valve on order and was soon to be installed. On 1 January the plaintiff complained that water was still seeping "through the retaining wall".
(m) On about 5 January 2023 the pressure valve was installed at the defendant's property. The December 2022 and January 2023 plumbing works cost the defendant the total sum of $6,160.
(n) By 20 July 2023 the plaintiff had, for several weeks, seen water "exiting the wall at the street front of her property, running over the footpath and slowly running down Beach Road". Water was again seen flowing through the retaining wall. The plaintiff says that the "ground at the back of my property near the boundary [had] become saturated". By email of the same day, the plaintiff told the defendant of water coming through the retaining wall, saying that "the ground is moist at the back of our boundary", and asking that they check for leaks.
(o) Mr Amos inspected the entire area which included looking at the basement of Unit 7, and found no signs of leakage. Mr Amos replied to the plaintiff that they had looked in "all the usual places that indicated a leak" and had not found anything obvious. They were "working on engaging a professional to do an inspection to make sure everything is working how it should".
(p) As at 4 September 2023, water flows across the boundary of the two properties and onto the plaintiff's land "after rain", with water pooling around the base of the retaining wall.
(q) In December 2022, the plaintiff was told by an insurer that the policy of insurance on the property would not be renewed in February 2023 because of the risk posed to the house by the retaining wall, and she has since been unable to obtain insurance.
"The defendant has failed and continues to fail to contain storm water and/or other water to the defendant's land or to divert such water flow to a storm water or other catchment system, with the consequence that the flow of water on the plaintiff's land has, and continues to, create a nuisance on the plaintiff's land."
Water has been slowly running down Beach Road for several weeks (we have reported this to Council). Today we noticed is now coming through our retaining wall again, and the ground is moist at the back of our boundary."
"What is firstly required is a consideration of what it is that is required to be done by the order and the effect that will have. It is where the order can be seen to have a profound effect that further 'assurance' will be necessary. This may be so where the matter would then be financially [sic finally] determined and a defendant has raised a triable is thereby denied a right to a full hearing ... It may also arise at a lesser level where, for instance, what is required is very costly and time consuming. In these cases the position is reached where the making of the order cannot be justified without another strong factor being able to be weighed against these effects and that factor may be a strong case being shown for final relief, although the difficulty is assessing it at an interlocutory stage may often have the result that the relief is denied." [Emphasis added]
Douglas
Strata Corporation No 15944 [2024] TASSC 25