[2025] QCAT 401
General information, not legal advice.
Queensland Civil and Administrative Tribunal
2025-10-08
Original judgment source is linked above.
This matter was heard and determined on the papers pursuant to s 32 of the Queensland Civil and Administrative Tribunal Act 2009 (Qld)
3. The preliminary issue of whether the subject of item 1 in the Direction to Rectify constitutes "building work" under the Queensland Building and Construction [sic] Act 1991 (Qld) will be decided on the papers, without an oral hearing, after 22 March 2025.
The as constructed stormwater system included associated earth works does allow for the free collection and drainage of stormwater adjacent to and around the southern side of the house, resulting in poor building practices in that the stormwater pits being higher than adjacent ground levels and ground level not having sufficient grades to direct the water away from the building. - This pertains to item 4 of the complaint form.
(1) Construction, extension, repair or replacement of a water reticulation system, sewerage system or stormwater drain, other than works connecting a particular building to a main of the system or drain.
Effective filed gullies are integral because they carry water away from the dwelling. When they are defective, there is the potential to impact the performance of the dwelling.
Are the pipes and traps a building or buildings?
1. The subject of item 1 in the Direction to Rectify is not "building work" under
[1] Submissions of the Respondent filed 21 February 2025 at paragraph 3.11.
[3] Statement of Rodney Turkington filed 21 February 2025 at paragraphs 16 to 17.
[4] Written argument of the Applicant filed 31 January 2025 at paragraphs 28 to 30.
[5] Statement of Timothy Mark Bartholomaeus filed 31 January 2025 at paragraph 9.
[6] Submissions of the Respondent filed 21 February 2025 at paragraph 3.11.
[7] See Submissions of the Respondent filed 21 February 2025 at paragraph 3.16 to 3.28.
[8] Cheshire Contractor Pty Ltd v Everett [2017] QSC 287, [21].
[10] Statement of Rodney Turkington filed 21 February 2025 at paragraph 23.
[11] Submissions of the Respondent filed 21 February 2025 at paragraph 3.29.
[13] Statement of Rodney Turkington filed 21 February 2025 at paragraph 23.
Dixonbuild Pty Ltd
Queensland Building and Construction Commission [2025] QCAT 401
Cheshire Contractor Pty Ltd v Everett [2017] QSC 287