appellant. Application allowed; Direction to Rectify dated 1 May 2005 as amended set aside.
A home builder successfully challenged a government order to fix flooding problems at a house they built. The court found that the house was built to the correct standards at the time, using information from the local council. The flooding was caused by the council's failure to maintain drains and new developments in the area, not by any problem with how the house was built. The council had a policy suggesting a higher floor level, but this wasn't an official rule and the builder didn't know about it. The court cancelled the order requiring the builder to fix the flooding.
AI-generated legal information, not legal advice. Zoe can make mistakes. Check the cited source, and for advice about your situation consult a qualified Australian lawyer.
No linked legislation citations have been extracted yet.
Demac Homes (Qld) Pty Ltd v Queensland Building Services Authority [2010] QCAT 190
Direction to Rectify; whether the footing system complied with AS2870-1996; whether the Caboolture Flood Management Policy applied the subject land; whether cause of flooding to the house was as a result of failure to comply with the Building Code of Australia or other external factors including the failure of the Caboolture Shire Council to maintain open stormwater drains and permitting development resulting in excess stormwater runoff; Direction to Rectify set aside.
Mr Ambrose of Counsel instructed by Hopgood and Ganim
Ms Hindman of Counsel instructed by Holding Redlich
The house as (as constructed) does not comply with the Building Code of Australia and section 5.2.1 of Australian Standard 2870 in that:-
Mr Chambers purchased the 5 acre block of land in Bellay Rd in 1984. The purchase was for future investment as he was in the Australian Navy at the time. The land was part of a new estate that had been developed in the Beachmere area. He engaged solicitors for the purchase but does not recall if flood searches were undertaken. One can reasonably suppose that searches of the local authority would have been done and if there were issues of flooding, this would have been brought to Mr Chambers attention. It is common practice for local authorities to identify areas that are subject to flooding even now Council records do not record the land as being flood affected.
The subdivision, consisting of acreage blocks, is curious in so far as the stormwater runoff is concerned. As is shown in the schematic plan[2] there is a main open stormwater drain (the "main drain") running between Bellay Rd and Bishop Rd with smaller open stormwater drains running into the main drain.
One such smaller drain is on the Chambers land along the northern boundary which is the subject of a registered easement in favour of the Council. These drains would have been clearly visible at the time of purchase, which it seems was soon after the completion of the subdivision. In addition the drain is shown on the real property title as an easement.
With the passing of time the drains have become overgrown with weeds, grasses and even mangrove seedlings, as well as being clogged with debris and silt. There is also a table drain adjacent to Bellay Road in between the front boundary of the Chambers' land and the road.
In the intervening years, the Chambers visited the land on occasion but, as Mr Chambers position with the Australian Navy caused him to be stationed at various places around the country, these visits were rare. Mr Chambers father would assist in making arrangements for contractors to clean the block up as required. Mr Chambers states that he was not aware of any drainage problems with the block during this period. I accept his evidence on this point but it is of little consequence to the outcome of the application.
"I told Mr Bullock that my wife and I wanted the house constructed 20 metres in from the front lefthand fence of the property and 20 metres in from the front boundary. The theory behind this was that we wanted the house as close to the front of the property as possible to allow people to see it from the road. We had wanted to maintain the back of the property for the kids to ride motorbikes and perhaps to keep some livestock. Mr Bullock responded that he would provide me with a costing/quote for the house at the front lefthand side of the block."
The Complaint to the Building Services Authority
(a) "At the inspection I observed that Demac Homes had undertaken the following works of the property:
(b) change the site levels to provide a fall to a catchment area (a dam) to accommodate the discharge of surplus water;
(i) lifted the level of the bund wall adjacent to the drainage channels that is influenced by the tides (during high tide water level increases in the drainage channel);
(ii) provided an electric pump to pump water from the dam to the drainage channel
(a) The design of the Concept Engineering calls for the dam to be six (6) metres wide, thirty (30) metres long and 1.5 metres deep but because of the substrate (it is silty sand) Demac Homes struck surface water when excavating a dam so the dimensions of the dam had to be changed. The dam is now longer and shallower than the original provided for in the original design of Concept Engineering"
(a) "Rectification work carried out to comply with Direction 27516 issued on 1/3/2005 is defective in that excavated vertical wall of over land flow catchment dam unstable and in a number of locations collapsed. Further remedial work is required to ensure long term stability of the excavation" [6]
"(a) As part of the Certis's assessment process, property information including a flood search was requested from Council. The following information was provided from Council:
(i) Council has no records indicating flooding of the above property.
(ii) Council does not have specific reduced levels on this allotment, but would appear that the minimum R.L. is approximately 1.0m Australian Height Datum.
(iii) The allotment is in an area where Council uses high tide levels to determine building levels. Reduced level at high tide levels to determine building levels. Reduced level at high tide is 1.60m Australian Height Datum.
(a) Certis then; issued a building approval based on the above information and the dwelling was constructed with a slab height of RL 1.905 (300mm above the 1.6 AHD advised by Council) and HSPT tank height of RL 1.70.1m AHD.
(b) The HSPT was approved by Council and fees were paid to enable Council to conduct 4 plumbing inspections.
(c) All work has been constructed to council approval. Sub-drain, drain and water rough-in inspections were carried out by Council during construction of the dwelling with no conditions resulting."[7]
(a) The floor of habitable rooms must not be lower than RL 2.3 metres AHD"
The parties agree that this policy is not a legally enforceable policy as it had not been formally adopted by the Council. However, the respondent submits Demac, in exercising proper building practices and investigations, ought to have been aware of the policy as it was on the Council's website, if not Demac then certainly Certis. Had the policy been adopted, the house slab would have been constructed, or ought to have been constructed to an RL level of 2.3m AHD. This would have avoided flooding in the house but would not have had any impact on the drainage issues around the perimeter of the house.
An alternate solution would have been to build the house at the rear of the block. Some issue was made as to whether the Chambers would have agreed to moving the house to the higher ground or have paid for imported fill to lift the house. All of this is now speculative and given what the Chambers have experienced it is now reasonable for them to say they would have considered and adopted one of these options. One obviously has to treat this evidence with caution but even so it carries little weight when one has regard to the issues for determination, that is whether the building work "as constructed" was defective.
It is submitted by the Authority that the policy ought to apply to the Chambers' site because:-
A pre cursor to the application of the policy is a finding that the subject land is in fact in an area "affected by tidal water". The land per se is not affected by tidal water, but there is conclusive evidence that tidal water does make its way up the main drain and into the drain on the Chambers land, if only to a minimal depth
There was no clear articulation of what is meant by the words "areas affected by tidal water". Although the word affected is an everyday word used in common parlance however here, it doesn't provide any assistance as to the degree the area must be "affected" before it falls within the policy. Quite obviously the land itself upon which the house is constructed is not "affected" by tidal water but, the storm water drain is affected by tidal water and in fact there is a video produced by the Chambers showing tidal water coming up the storm water channel. This of course is only at high tide.
The contour plan[10] shows that adjacent to the house the ground level at the bottom of the storm water drain is RL1.06 (and varying heights in that area). But, "affected" does not only mean that tidal water does flow onto the land but its affect is such that it does prevent or, inhibit, the egress of water from the land in a storm event. Therefore, in this context the land could be said to be "affected" by tidal water and therefore, consistent with the policy, habitable rooms should have been on a level of at least RL 2.3 metres AHD.
If this was the case then one could reasonably suppose that not only would the Policy be adopted by the Council the land itself would be shown as being in a 'flood plain" when Council records are searched. There is no clear identification or evidence that the land in fact is "affected by tidal water" nor is there any indication that the land is in a flood plain. In the absence of some clear notification, neither the owner nor the builder could be made aware of these facts.
I have therefore come to the conclusion that the Flood Management Policy is not a relevant policy which ought to have come to the attention of CERTIS. The land is sufficiently distant from Deception Bay to not have put the builder on alert, particularly in the absence of any advice to that effect from the Chambers, that tidal influences should be taken into account. Nor could there have been any reasonable expectation on the part of either the Chambers or Demac that hydraulic issues of the type considerably Mr Winders ought to have been addressed by Demac.
"If the authority is of the opinion that building work is defected or incomplete, the authority may direct the person who carried out the building work to rectify the building work within the period stated in the direction"
"a decision to direct or not to direct rectification or completion of Tribunal work"
The drainage and height of the floor level above finished ground level may be effected by factors other than structural design requirements. Such factors include the following:
(a) the local plumbing requirements, in particular the height of the overflow relief gully relative to drainage fittings and ground level
(e) the effects of existing and post construction landscaping;
(f) the level of existing legal point of storm water discharge
Drainage shall be designed and construct to avoid water ponding against or near the footing. The ground in the immediate vicinity of the perimeter footing, including the ground uphill from the slab on cut and fill sides, shall be graded to fall 50 mm away from the footing over a distance of 1 metre.
Alternative grade systems will be required on lot line construction. Any paving shall also be suitably sloped"
(a) safeguard occupants from illness or injury and protect the building from damage caused by:
(iii) the accumulation of internal moisture in a building; and
Surface water means all naturally occurring water, other than sub-surface water, which results from rainfall on or around the site or water flowing onto the site, including that flowing from a drain, stream, river, lake or the sea.
(a) Surface water, resulting from a storm having an average occurrence interval of 20 years and which is collected or concentrated by a building or site work, must be disposed of in a way that avoids the likelihood of damage or nuisance to any other property.
(b) Surface water, resulting from a storm having an average recurrence interval of 100 years must not enter the building.
(c)A drainage system for the disposal of surface water must -
(i) convey surface water to an appropriate outfall; and
(ii) avoid the entry of water into a building; and
Applied to rainfall, means the average or expected interval between events of a given rainfall intensity being exceeded
Surface water must be diverted away from class 1 building as follows:
(a) slab - on - ground - finished ground level adjacent to buildings:
(b) the external finished surface surrounding the slab must be drained to move surface water away from the building and graded to give a slope of not less than 50mm over the first 1m from the building (see figure 3.1.2.2);
the height of the slab - on - ground (measured at the slab edge) above external finish surfaces must be not less than:
50mm above paved or concreted areas that slope away from the building in accordance with (a).
The appropriate slab height above finished ground level may vary depending on:
(1) The local plumbing requirements; in particular the height of the overflow relief gully relative to drainage fittings and ground level (to work effectively, they must be a minimum of 150mm below the lowest sanitary fixture).
(2) The run-off from storms and the local topography.
(3) The effect of excavation on a cut and fill site.
"I'm not an expert in the actual workings of an HTP Plant, but from my understanding of it, it would not be compliant. The ring that was placed on top was probably my suggestion to prevent flooding in the short term, stops the electrics being shorted out. The current situation is that they have a ring on the top. That doesn't alter the fact that the tank is at the wrong level. It's merely there to prevent surface flooding coming into the top of the tank or hitting the top of the tank".
"What I'm saying is the Australian Standard is one document you can rely on. If you decide to satisfy that document, then you satisfy the building code of Australia. In other words, it's one of the solutions you can use. You can go and design a footing system outside the Australian standard and if you can prove that it's going to work, then you've come up with an alternative solution and that may very well comply with the Building Code of Australia as well."
"Depending on the permeability of the clays, the length of the flood exposure and the depth of the footing system there is however some risk of the development of differential movements between the external wall footings and the internal slab areas"
"It appears that we are diametrically opposed to Mr Griffiths with regard to compliance with the Building Code of Australia. We say the building does not comply....he has an opposite view.
At page 7 of the Griffiths report.....it is stated :..."I believe, providing water collected or concentrated by the building or site work is conveyed to an appropriate outfall, does not present an unhealthy situation, does not enter the dwelling, and avoids that water damaging the building, the work should be deemed to comply"
It appears that Mr Griffiths has overlooked the definition of "Surface water" in the BCA. It is not only water concentrated by the building or site work, and includes run-off and tidal water. In this regard his conclusion that the building complies with the BCA is incorrect."
John Alfred Finglas, of 68 Bayside Drive, Beachmere;
"extensive development beyond the original catchment of the Main Drain has increased run-off into the Main Drain, above and below the site, to the extent that surcharging, due to the increased flow in the channel during major floods, may well be the cause of the Site being flooded more now than had been expected prior to the planning and construction of the subject house"
(a) The requirements of the Council at the time of approval was to build the house to an RL of 1.9m;
(b) The Council requirements with respect to flooding have been complied with because the Flood Management Policy was not an official Policy demanding compliance and also there is not sufficient evidence to find that the subject land fell within the area "affected by tidal water";
(c) The footing system as constructed complies with AS2870-1996
(d) The applicant has complied with the requirements of AS2870-1996 as it was obliged to do so under the contract.
(e) The cause of water inundation is contained in the report of MMWA Environmental and the evidence given by Mr Winders which evidence is accepted and relied upon for the reasons stated.
(f) The applicant in reliance on the information provided by the Council and the fact that this was an approved subdivision acted reasonably in construction of the house having regard to the topography of the property and absence of advice FPM.
(g) No further action was required to be taken by the applicant.
[8] Ex 2 Joint Agreed Statement of Facts
[9] EX 36 LRB 2, letter from Council 13 September 2003.
[13] Respondents submissions para 34-36
[27] Reports of MWA Environmental dated 8 July 2008 and 27 July 2009
Demac Homes (Qld) Pty Ltd
Queensland Building Services Authority [2010] QCAT 190
Application allowed; Direction to Rectify dated 1 May 2005 as amended set aside.