[2025] VCAT 735
General information, not legal advice.
Victorian Civil and Administrative Tribunal
2025-08-21
Original judgment source is linked above.
Use of a Buddhist monastery (innominate use in section 2).
Buildings and works associated with the use of a Buddhist monastery.
(a) be prepared to the satisfaction of the responsible authority
(b) be drawn to scale with dimensions
(c) submitted in electronic form
(d) be generally in accordance with the plans forming part of the application and identified as:
Development plans prepared by ARPC Pty Ltd:
Job No. 2371, TP01 - TP04 (inclusive), dated 2 July 2023 (circulated as corrected plan package to the Tribunal on 15 July 2025)
Job No. 2371, TP05, TP06, TP07, TP08 and TP08A, dated 15 May 2025 (circulated as corrected plan package to the Tribunal on 15 July 2025)
Landscape Plans prepared by Monarch Garden Design: Job No. 25-1225, Original issue A, sheets 1, 2 and 3, all dated 15 May 2025.
Compliance with documents approved under this permit
Weekend meditation retreats - must not occur in conjunction with any other monthly or annual event.
Working bee - must not occur in conjunction with any other weekend meditation retreat, monthly or annual event.
Vesak - Buddha's birthday / enlightenment / passing away celebration ( one day only - May)
Rainy season end celebration (One day only - November)
(a) Operations management details, including but not limited to:
- Event and visitor numbers for each event in accordance with this permit and how the limit of persons on site for each event will be controlled and maintained.
- The days and hours of operation.
- Use of the car parking area and prohibition of car parking outside the property boundary.
- Limiting or otherwise suspending the operation to address bushfire risks to the property and people therein.
- Uses of the buildings and open areas of the subject site.
(a) Details of the property (address, land size, etc).
(b) Land characteristics (slope, soil quality, waterways).
(c) Existing land uses.
(d) Location of existing infrastructure (buildings, fences, etc).
(e) Detail of current activity on adjoining properties and location of buildings.
(f) Details of existing vegetation (native vegetation, canopy trees, etc).
(g) Any soil damage or existing erosion.
(h) The availability of power and other services.
(i) A description of the state of the property with regard to vermin and noxious weeds.
(j) Details of the proposed use, including current and intended access to and through the property.
(k) Details of revegetation or land reclamation activities proposed to be undertaken.
(l) Details of proposed works associated with the use (i.e., replanting, fencing, etc).
(m) Details of weed and pest management.
(n) Details of water management (as relevant, dams, water access, treatment of waterways and/or drainage lines.
(o) Tree planting on the eastern side of the car parking area.
(p) A planting schedule of all proposed trees and shrubs of the appropriate Ecological Vegetation Class (EVC).
(q) A timeline for the completion of environmental works within 5 years of the use starting.
(a) It will be endorsed and form part of this permit; and
(b) It must be complied with;
(a) At all times the use of the land must be managed in accordance with the recommendations contained within the endorsed Land Management Plan, to the satisfaction of the responsible authority.
(b) That the owners and occupiers of the land are aware that agricultural land uses exist in the immediate area and adjacent to the site that may adversely affect the amenity of the land through the emission of noise, dust, odour visual amenity and the movement of vehicles including trucks.
(c) That the owners and occupiers of the land are aware that the agricultural land uses in the immediate area may expand their operations in the future.
The landowner must pay the reasonable costs of the preparation, execution and registration of the section 173 Agreement.
(a) Crossover details
(b) Signage details
(c) Swept Paths demonstrating forward motion ingress and egress
(d) Driveway construction and drainage details including driveway grades and indication of fall; and
(e) Underground drainage details, overland flow path and supporting calculations.
Environmental Health Conditions Land Capability Assessment
Discharge to EPA approved on-site wastewater treatment system
(a) The minimum of 20,000 litres of water must be provided and maintained solely for firefighting purposes.
(b) The water supply must be within 60 metres of all walls of the dwelling/monastery building (allowing for any obstructions).
(c) Fire Brigade vehicles must be able to get within 4 metres of the water supply outlet.
(d) The water supply and associated fixed above ground water pipelines and fittings must be constructed in materials resistant to corrosion and combustion. Other materials can be utilised where appropriately protected from the effects of radiant heat and flame.
(e) The water supply must be readily identifiable from the building or appropriate signage must point to the water supply.
(f) If the water supply is above ground the following additional standards apply:
- it must provide at least one 64 mm, 3 thread/25 mm x 50 mm nominal bore British Standard Pipe (BSP), round male coupling to CFA specifications.
- all pipe work and valving between the water supply and the outlet must be no less than 65 mm nominal bore; and
- if less than 20 metres from the building, each outlet must face away from the building to allow access during emergencies.
(g) All below ground water pipelines must be installed to the following depths:
- subject to vehicle traffic - 300 mm
- under houses or concrete slabs - 75 mm
(a) A clear statement of the plans purpose and scope
(b) Details on the site and any emergency features/equipment.
(c) A version control table and details on when and how the plan will be reviewed.
(d) Details the roles and responsibilities of the emergency control organisation (wardens)
(e) Outlines training requirements for the emergency control organisation (wardens) and how often exercises will be conducted.
(f) Details for onsite contacts, emergency services and neighbours.
(g) Contains appropriate "action statements" for:
- Before the Fire Danger Period
- During the Fire Danger Period - including details of how the bushfire threat will be monitored.
- When an extreme and catastrophic Danger Rating is forecast
- When any other lower trigger point for action is forecast (as determined by the sites emergency control organisation/management)
- When a bushfire threatens the site - including the trigger for sheltering in place or evacuation (as appropriate).
- After the bushfire threat passes.
(h) Details on evacuating staff, visitors and guests
(i) Details on sheltering in place (if required).
(a) The development is not started within 2 years of the issued date of this permit.
(b) The development is not completed within 4 years of the issued date of this permit.
(c) The use does not start within 2 years of completion of the development.
In accordance with Section 69 of the Planning and Environment Act 1987, an application may be submitted to the Responsible Authority for an extension of the periods referred to in this condition.
[1] The submissions of the parties, any supporting exhibits given at the hearing and the statements of grounds filed have all been considered in the determination of the proceeding. In accordance with the practice of the Tribunal, not all of this material will be cited or referred to in these reasons.
[2] These orders substituted the application plans and sought further submissions on an issue identified in our site inspection.
[3] Consistent with section 66(1)(a) of Schedule 1 to the Victorian Civil and Administrative Tribunal Act 1998 (Vic).
[4] The applicants referred to the website stating meditation would be led by Bhante Pasadika, who according to the website, is a senior Buddhist monk and renowned Meditation teacher.
[6] In December 2022. The council also confirmed it is currently seeking to implement the RLAR through an amendment to the Mitchell Planning Scheme, but has yet to receive authorisation from the Minister for Planning for such an amendment.
[8] Trans Traffic Survey attached to the Traffic Impact Study - survey undertaken 4-11 January 2024.
[9] Noting the traffic survey includes latitude / longitude points for each survey location. We have inputted these points into Nearmap to create the markers.
[10] Consistent with other decisions of the Tribunal. For example see Alphington Grammar School v Yarra CC [2024] VCAT 148, [142]-[147].
[11] Applicant submission - paragraph 40.
Delany