[2011] VCAT 96
Victorian Civil and Administrative Tribunal
2011-01-27
Ms J
Original judgment source is linked above.
Section 79 of the Planning & Environment Act 1987; Moreland Planning Scheme; Major Activity Centre; Business 1 Zone; Design and Development Overlay; Heritage Overlay; Multi-level mixed use development; Policy; Height; Structure Plan; Car parking; On-site amenity.
Department of Transport (Director of Public Transport)
Damfine Pty Ltd & Anor v Moreland CC [2011] VCAT 96
Mr M Naughton, Solicitor of Planning & Property Partners Pty Ltd. He called evidence from:
Demolition of the existing building and the construction of an eight-storey building (plus basements) accommodating 64 dwellings, a 75 seat restaurant, two shops, two offices and associated car parking.
Application under Section 79 of the Planning and Environment Act 1987.
Cl. 34.01-1 (use of land in the B1Z for dwelling and office).
Cl. 34.01-4 (construction of buildings and works on land in the B1Z).
Cl. 43.01-1 (demolition and construction of buildings and works in HO149).
Cl. 43.02-2 (construction of buildings and works in DDO18).
Cl. 52.06 (reduction of the car parking requirement).
Cl. 10, 11, 11.01, 11.04, 15, 15.01, 15.02, 15.03, 16, 16.01, 17, 17.01, 18, 18.01, 18.02, 21, 22.02, 22.05, 22.11, 22.13, 22.15, 34.01, 43.01, 43.02, 52.06, 52.07 and 65.
The review site is located on the south-west corner of Sydney Road and Michael Street in Brunswick. The property has a frontage of 19.22 metres, a depth of 56.98 metres and an overall site area of 1095 square metres. It is presently occupied by a two-storey commercial building. The site forms part of the Sydney Road commercial strip. To the south is a two-storey commercial premises. To the north, on the opposite side of Michael Street is the Brunswick Club- a two-storey building which is currently undergoing buildings and works to convert part of it to dwellings. On the east side of Sydney Road are church buildings and further commercial land uses. Development in the area is predominantly two-storeys. To the west are industrial properties.
We undertook an inspection of the subject site and its surrounds after the hearing.
What does the Planning Scheme say about the development and use of this land?
To ensure that the height and form of new development is compatible with the Brunswick Structure Plan.
Is the proposed built form an acceptable response to the physical and strategic context of the site?
Is adequate car parking provided, and will the traffic impacts of the proposal be acceptable?
Will the development provide an acceptable level of internal amenity for its occupants?
Will the development have an unreasonable impact on the amenity of nearby residential properties?
(b) The bike storage area adjoining Saxon Street provided with entry from within the building rather than from Saxon Street.
(c) The location of any substation required by the relevant power company for this development. Any substation must be incorporated within the building (i.e. not free standing or pole mounted in the street) to ensure minimal impact on the visual amenity of the public realm.
(d) Any design details or modifications to the plans arising from the recommendations of the approved Acoustic report (refer to Condition No. 3 of this permit).
(e) A schedule of all proposed exterior decorations, materials, finishes and colours, including colour samples (3 copies in a form that can be endorsed and filed).
(f) Bicycle parking areas dimensioned in accordance with the specifications of Bicycle Victoria's Bicycle Parking Handbook.
(g) A schedule specifying the allocation of car spaces. One car space must be allocated to each of the dwellings.
(h) A minimum width of 1.6 metres and a minimum area of 8 square metres for all balconies/decks.
The development must be constructed in accordance with the recommendations contained in the approved Acoustic report to the satisfaction of the Responsible Authority.
(a) Buildings and works that necessarily form part of the environmental site assessment process, and
(b) Building and works that the environmental professional engaged by the owner/developer advises must be carried out before an environmental site assessment can be prepared.
(a) A Certificate of Environmental Audit for the land must be issued in accordance with Section 53Y of the Environment Protection Act 1970 and provided to the Responsible Authority; or,
(b) An Environmental Auditor appointed under Section 53S of the Environment Protection Act 1970 must make a Statement in accordance with Section 53Z of that Act that the environmental conditions of the land are suitable for the use and development that are the subject of this permit, and that Statement must be provided to the Responsible Authority.
Where a Statement of Environmental Audit is issued for the land, the buildings and works and the use(s) of the land that are the subject of this permit must comply with all directions and conditions contained within the Statement, to the satisfaction of the Responsible Authority.
Where a Statement of Environmental Audit is issued for the land, before the development is occupied and/or the use starts, and before a Statement of Compliance is issued under the Subdivision Act 1988, and before an Occupancy Permit is issued under the Building Act 1993, written confirmation from an Environmental Auditor appointed under Section 53S of the Environment Protection Act 1970 that the directions and conditions contained within the Statement have been satisfied must be provided to the Responsible Authority, to its satisfaction.
Where a Statement of Environmental Audit is issued for the land, and any condition(s) of that Statement require(s) any maintenance or monitoring of an ongoing nature, the owner(s) must enter into an Agreement with Council pursuant to Section 173 of the Planning and Environment Act 1987 to ensure compliance with the condition(s). Where a Section 173 Agreement is required, the Agreement must be executed before the use starts and/or the development is occupied and/or, a Plan of Subdivision is certified under the Subdivision Act 1988. All expenses involved in the drafting, negotiating, lodging, registering and execution of the Agreement, including those incurred by the Responsible Authority, must be met by the owner(s).
(a) Buildings and works that necessarily form part of the environmental audit process, and
(b) Building and works that the environmental auditor engaged by the owner/developer advises must be carried out before a Statement of Environmental Audit or a Certificate of Environmental Audit can be issued.
These works must be carried out in accordance with a works plan approved by the environmental auditor engaged by the owner/developer. A copy of the works plan must be provided to the Responsible Authority before the development starts.
(a) A description of the location in the context of alternate modes of transport and objectives for the Green Travel Plan;
(b) Outline Green Travel Plan measures for the development including, but not limited to:
(i) household welcome packs - tram, train and bus timetables relevant to the local area must be included in the pack of information provided to purchasers upon a purchaser's occupation of a dwelling;
(ii) include a minimum of 10 by 2 hour metcard (zone one) within the household welcome pack or a myki rail pass (of equivalent value) and registration information;
(iii) bicycle parking and facilities available on the land;
(c) A plan showing the bicycle parking areas to be provided for use by residents;
The development must be undertaken in accordance with the approved Construction Management Plan to the satisfaction of the Responsible Authority.
(a) be completed before the development is occupied
(c) be properly formed to such levels that it can be used according to the endorsed plan
(e) have the boundaries of all vehicle parking spaces clearly marked on the ground to accord with the endorsed plan
(f) not be used for any other purpose other than the parking of vehicles.
(a) the development does not start within two (2) years from the date of issue of this permit;
(b) the development is not completed within four (4) years from the date of issue of this permit;
(c) the use does not start within four (4) years from the date of issue of this permit.
The Responsible Authority may extend the periods referred to if a request is made in writing before the permit expires or within three months afterwards.
[1] We have considered all submissions presented by the parties although we do not recite all of the contents in these reasons.
[2] Planning and Environment List Practice Note 1 (PNPE1)
[3] Clauses 11, 11.01, 16.01, 21.04 and 22.02.
[5] Interim Brunswick Major Activity Centre Height Limit Area - Sydney Road and Upfield Corridor
[6] Although a permit will still be required if the setback requirements are not met.
[7] Refer to Clause 11.04-2, which includes a strategy of encouraging higher density housing in Neighbourhood Activity Centres that is designed to fit the context and enhances the character of the area.
[8] The requirement to consider the Structure Plan is also detailed in Clause 22.15 (Brunswick Activity Centre Policy).
[9] Although the plans refer to a '2 bed + study type' dwelling, this form of dwelling comprises of two bedrooms and a desk within the living/dining area. It does not include a separate room which will be used as a study.
[10] As provided for in Clause 55.03-11 which, although not applicable to this proposal, has been used by Councils and the Tribunal in the assessment of visitor car parking for these types of developments. The use of this rate generates a requirement for 13 visitor car spaces.
[11] Development of Four or More Storeys.
[12] The First Stone Pty Ltd v Darebin CC [2009] VCAT 1472 and Merri Merri Developments Pty Ltd v Darebin CC (red Dot) [2010] VCAT 1045
Damfine Pty Ltd & Anor
Moreland CC [2011] VCAT 96