The proposed building work that gives rise to the need for protection work is Alterations and additions to double storey dwelling, including extension to rear.
a) a covering letter dated 17 January 2025 from SDA; > > b) the Form 6; > > c) the Form 7; > > d) a document dated 18 December 2024 prepared by the Interested Parties' builder, SPR Constructions (Vic) Pty Ltd titled 'Protection Work Statement' (Protection Work Statement);[2] > > e) a drawing of, inter alia, the Subject Land and the Adjoining Property, annotated by hand to indicate the proposed protection work; > > f) architectural and engineering drawings.
Protection works for demolition overhead will be via scaffold and planks
Demolition to ground and first floor constructions will be done by hand and all bracing to be done will form a safe work site and safe party walls.
Temporary fencing to front and back of property at 547 Royal Parade Parkville and the sideway of 545 Royal Parade Parkville to be installed between 25th February - 25" March
Scaffold for brickwork over the outhouse at 549 Royal Parade Parkville will be installed between 25th March - 25th April 2025
Both properties of 545 & 549 Royal Parade Parkville will be reinstated to the owner's satisfaction
B. Disagree with the proposed protection work for the following reasons:
(iii) overhead protection for adjoining property; ...
whether or not the work or equipment is carried out or used on, over, under or in the air space above the land on which the building work is or is to be carried out or the adjoining property;
(1) An owner or the agent of an owner may enter between the hours of 8 a.m. and 6 p.m. on, over, under or into the air space above any adjoining property -
(a) to carry out any survey under section 94; or
(b) to carry out the protection work required by the building regulations and agreed or taken to be agreed to or determined under this Part.
If notice of entry has been given in accordance with section 95(2), the adjoining owner or the adjoining occupier must not -
(a) refuse to admit the owner or the owner's agents to the adjoining property in accordance with the notice for the purpose of carrying out the survey or protection work; or
(b) obstruct or hinder the owner or the owner's agents in carrying out the survey or protection work on, over, under or in the air space above the adjoining property.
[1] Clause 17 of Schedule 3 to the Building Act 1993 provides: 'Unless the Building Appeals Board otherwise determines, a party to a proceeding before the Board must bear his, her or its own costs'.
[12] Applicant's Statement of Contentions, [3], TB 64 and [11], TB 65.
�D'Agostino
Merrick [2025] VBAB 85;
APPEAL - Appeal made under s 141(a) of the Building Act 1993 (the Act) by the adjoining owner against a determination made by the relevant building surveyor under s 87 of the Act as to the appropriateness of proposed protection work - Janney & Anor v Steller Works Pty Ltd [2017] VSC 363 considered.