Currumbin Riverview [2025] QBCCMCmr 127
Body Corporate for Currumbin Riverview (respondent)
Body Corporate and Community Management Act 1997 (Qld) (Act), sections 227(1)(b) and 229(3)(a)
UTILITY INFRASTRUCTURE - where the applicant wants to install external taps on her front balcony and rear courtyard to enable her to water her plants - where she wants to connect to the mains water supply in the basement through penetrations in the slab - whether the body corporate has validly refused approval for the installations.
I am seeking to overturn the committee's decision voted on outside a committee meeting on 2nd September 2022, Motion 1 and seeking approval for the additional courtyard works as outlined in the Minutes of a meeting of the committee dated 6th April 2023, Correspondence: Item 1. All Meeting minutes are attached in Appendix F
(b) Notify all residents of the date and time at least 48 hours in advance.
• The body corporate accepts the attached quotes supplied by owner to engage All Clear Plumbing & Gas Services to carry out scope of works at owner's expense.
Plumber to install pipes, taps and Hoselink fittings to owners front balcony and rear courtyard.
• Pipework to be connected to main water outside of unit as per other existing lots in the scheme.
• Scope of works as per attached quotes total under $3000
• Estimated Jme that the water will need to be turned off is 30-60 minutes for rear courtyard install only. No water for all 24 units will be available during this period.
• 48 hours notice will be given to all residents prior to commencement of scope of works.
• Owner will install a stop valve on the rear water line at her expense to avoid any inconvenience to residents should anyone require future work on this line
• Some basement access required and will be negotiated with relative residents and BC Chairperson.
• As per Section 187 of the BC&CM Act: The lot owner is entitled to make this as an improvement and it will not detract from the appearance of the building (front tap and reel will be discreetly hidden from font view) and is a minor improvement under $3000
• Front installation of the pipework, tap & hose reel will be next to the existing air conditioning unit and hidden behind the balcony poted palms and by the azalea bushes in the garden between Lot 103 & 104
• Rear courtyard installation is enclosed within the fenced courtyard
• Please refer to the attached BC&CM documentation of this Act, s 159 (sic)
An Occupier must not change any Utility Infrastructure within a Lot, except with the Committee's written approval. The purpose of this by-law is to ensure that the Utility Infrastructure servicing other Lots and the Common Property is not affected in any manner.
An Occupier must not make any change to the external appearance of a Lot, except with the Committee's written approval (where a minor improvement as that term is defined in the Act). In all other cases, the approval must be given in writing by the Body Corporate.
Utility infrastructure will be reasonably necessary in this context, in my view, if the supply of [the utility service] cannot be performed or achieved without it, and if an alternative location for the infrastructure is not feasible or reasonably available. It will also be necessary to consider the whole picture, which here would mean taking into account the effect of the location of the utility infrastructure on the right of other lot owners to the use and enjoyment of the relevant common property.
[1] Lot 104 is also variously referred to as Lot 4 and Unit 4 but for consistency I will only use Lot 104.
[3] See sections 227, 228, 276 and Schedule 5 of the Act
[13] Recorded 14 December 2012, titles dealing number 714843477
[14] Sections 48C and 49C(4) of the Land Title Act 1994
[15] Registrar of Titles Directions for the Preparation of Plans, Department of Natural Resources, Mines & Energy, 1998-2018, paragraphs 9.6.3 and 4
[16] I note the sketch plan of exclusive use areas in the CMS is quite unclear.
[17] The list is somewhat unclear, and one tap may be listed twice.
[18] One may be wholly within a courtyard, but it is unclear from the annotated plan.
[19] Pursuant to the definition of improvement in schedule 6 of the Act, and improvement includes a change.
[20] See the definitions of utility infrastructure and utility services in schedule 6 of the Act
[22] Section 180(4) of the Standard Module
[23] Section 180(3) of the Standard Module
[25] The term utility infrastructure is defined in By-law 1.1
[27] Section 159 of the Act and sections 187 and 193 of the Standard Module
[28] Sections 187(4) of the Standard Module
[29] Section 115O of the Land Title Act 1994; the definitions of utility services and utility infrastructure in the Land Title Act 1994 point to the definitions of those terms in schedule 6 of the Act
[31] Section 68(1) of the Act, Ralborg No 2 Pty Ltd atf Ralston Property Trust v The Body Corporate for The Regent Apartments CTS 9573 [2020] QCATA 117
[32] Ralborg No 2 Pty Ltd atf Ralston Property Trust v The Body Corporate for The Regent Apartments CTS 9573 [2020] QCATA 117, para 62
[33] Ralborg No 2 Pty Ltd atf Ralston Property Trust v The Body Corporate for The Regent Apartments CTS 9573 [2020] QCATA 117
[34] Body Corporate No. 413424R v Sheppard [2008] VSCA 118
[37] Gold Coast Apartment Management P/L v Price & Ors [2017] QCATA 99
[38] Waters v Public Transport Corporation [1991] HCA 49
[39] Body Corporate for Beaches Surfers Paradise v Backshall [2016] QCATA 177 at 43, citing McKinnon v Department of Treasury [2006] HCA 45; (2006) 228 CLR 423
[40] Body Corporate for Beaches Surfers Paradise v Backshall [2016] QCATA 177 at 34, 74 and 98
[42] Noting section 20 of the Act and section 211 of the Standard Module
(2006) 228 CLR 423