CONTRACTS - BUILDING, ENGINEERING AND RELATED CONTRACTS - PERFORMANCE OF WORK - REMEDIES FOR BREACH OF CONTRACT - DAMAGES - OTHER MATTERS - where homeowner alleged defects or omissions in work required substantial remedial work - where the allegedly defective work was work said not to have complied with requirements of the relevant Australian Standards and/or manufacturer's specification - where the homeowner also asserted there was consequential damages arising from the defective work - whether the homeowner's evidence supported the claim as made - where there was an absence of relevant independent expert opinion evidence
Queensland Building and Construction Commission Act 1991 (Qld), s 77, Schedule 1B s 4, s 20,
Bellgrove v Eldridge (1954) 90 CLR 369
Owners SP 92450 v JKN Para 1 Pty Limited [2023] NSWCA 114
Neil v Nott [1994] HCA 23; (1994) 68 ALJR 509
Penfold v Firkn & Balvius [2023] QCATA 11
Owners SP 92450 v JKN Para 1 Pty Limited [2023] NSWCA 114
State of New South Wales v Stevens [2012] NSWCA 415; (2012) 82 NSWLR 106
October 2024 - Ms R.J. Saunders - Solicitor WGC Lawyers
(a) the water penetration to the interior of her house and the resultant damage was caused by the manner in which Mr Sophocleous was performing his work;
(b) seemingly reliant on the report by the QBCC Inspector who investigated her complaint, the roof sheeting as installed is defective because:
(i) the wrong product has been used, that which was used not being suitable for use in construction of a sprung roof, and so is not 'fit-for-purpose'; and
(ii) there is what is known as 'oil canning' in the roof sheeting, such being indentation in the roof sheeting where it spans the ridge line, such which will cause premature deterioration of the roof sheeting; and
(c) there are other defects in the roof as constructed.
(a) The roofing material would be suitable for the purpose for which it was used;
(b) The work would be carried out
(i) in accordance with all relevant law and legal requirements, including for example the Building Act 1975 (Qld);
(ii) in an appropriate and skilful way; and
(iii) with reasonable care and skill.
(i) water was leaking from the ceiling in the areas where I believed the new roof sheeting to have been installed;
(ii) the barge capping had been removed leaving the end of the roof exposed;
(iii) the roof had no tarp covering to stop rain from entering.
Incorrect sheeting iron, poor installation, rust damage, loose screws in sheeting, sheeting iron not cut straight, ridge capping installing (sic) incorrect, damage to sheeting, over tightened screws causing indentation and water pooling;
Damages to timber beams and plaster not repaired correctly, and holes in plaster under eaves;
Mould under eaves caused by rain damage to ceiling.
Despite the direction to rectify, I did not grant further access to the Property due to the breakdown of the relationship, the conduct of the Respondent and previous unsatisfactory repairs.
On 1 April 2022, the QBCC notified me that the QBCC will not be taking any further action.
The roof has continued to leak in many areas since the QBCC Inspection Report which detailed the defective works and required rectification of the Work.
(a) Did Mr Sophocleous breach any one of the Warranties? This was to be answered by reference to two sub-issues, namely:
(i) Was the roof sheeting material supplied by Mr Sophocleous under the Contract not suitable for the purpose for which it was to be used ?
(ii) Did Mr Sophocleous not carry out the works:
- in accordance with all relevant law and legal requirements; or
- in an appropriate and skilful way, and with reasonable care and skill?
(b) If the answer to any of the primary question was 'Yes', the subsequent question was then - what damages (if any) flow from it?
The first visit was while the old roof was still on. Joanne had some of the ceilings done already and wanted a quote to finish the work so all the ceilings matched. ... There was no water damage to the ceiling. ...
On my second visit the water damage was quite visible. As it had been some time between quotes I wanted to reassess my figures, due to the rise in plasterboard and material prices, and sent a new quote.
...
As I stated before - there was no water damage the first time I visited and there was quite visible water damage the second time I visited.
Our plumber attended the property of [Ms Currow's address given] and assessed the Edwards 302L system.
He found the Edwards 302L system was sitting on a side pitch frame, which is not fixed to roof battens, instead is resting on blocks of wood, with metal straps attaching the blocks of wood to the roof. This is not an approved method of attaching a cyclone frame to the roof.
The system also has multiple leaks which we fixed by replacing seals.
Roof penetration for the pipework is also very poor.
Mr Sophocleous Since purchasing your house did you ever make an insurance claim for water damage.
Ms Currow No.
Mr Sophocleous You have no video evidence of water dripping inside the house.
Ms Currow No, but I have had water dripping into the house at times since starting this proceeding, with continued staining and moisture.
Me The replacement of the ceilings internally was always intended to be done.
Ms Currow It was an option but I must now replace it.
I had a conversation with Steven Sargent [QBCC] about quality of work and responses from Ms Sophocleous at the time, and Steven said I could take it further to QCAT.
Sections and areas of Klip-Lok have been screwed down, presumably because the sheets are continuous full length from front to back and appear to be under tension. They curve slightly over the ridge. ...
...
Several screws are tensioned too tightly resulting in an obvious indent to the top flat surface of the corrugations.
My findings concluded that this roof may not have been installed to the manufacturer's recommendations for this particular type of cladding and roof frame.
It also appeared that some of the roof screws were either screwed down too tightly or not enough, resulting in some indentations allowing water pooling, and loose screws potentially allowing water penetration into the roof void.
In my opinion, this roof requires urgent attention to rectify.
Ms Currow informed me the roof was leaking. The fall was Nil in some locations. The roof sheeting was tension screwed in some locations. Pressure was such that it caused indent and low spots.
Mr Sophocleous Have you experience in replacing rooves?
Mr Eldred I have some experience in roofing, but my experience is in building inspection.
(a) The First Report - inspection date 10 May 202:[27]
The licensee has reroofed part of the dwelling when a rain event transpired and stopped work. The licensee secured the new roof cladding down to existing roof sheets during (sic) prior to the event. However the roof leaked into Bedroom 1 and possibly other areas of the dwelling. The licensee admitted responsibility for the leak in Bedroom 1, however believes they are not responsible for the other leak stains in the Master Bedroom, Hallway or Bedroom 3.
...
The QBCC considers it difficult to determine if the initial water leak from the hammer being placed under the roof contributed to water spreading into the Master Bedroom and Hallway from Bedroom 1.
The licensee had returned prior to QBCC inspection to fix-down barge capping, as apparently it was not in place when rain event occurred.
Clip-lock (sic) roofing is being used on shallow pitch, however excessive creasing has occurred to sheet pan around the ridge area. Excessive oil-canning in trays of Clip-lock roof sheeting will permit water to pond in these areas. Standards Australia HB 39-2015 Part 7.17 states that retainment of water from oil-canning in trays can lead to discolouration or deterioration of the roof sheet and contribute too (sic) thermally induced roof noise. ...
It is difficult to ascertain if the initial leak from a hammer being left in-between roof join has compromised the ceiling sheets in other rooms or barge-capping being left off has impacted on ceiling in Bedroom 3. To gauge if leaks have occurred from the recent rain events or are existing, then a more thorough examination (invasive) is required.
(b) The Second Report - inspection date 23 February 2022:
(i) In terms of the 'Living Room':[28]
There was evidence of water staining to Living Room ceiling, which was not evident when EDR inspection was undertaken in May 2021.
It appears water entry has occurred in the Living Room, whether the consequential damage has occurred prior to roof being completed when leak occurred between sheets (hammer left under sheet) or the new roof is leaking in (sic) this case.
Furthermore, the Met-lok roof cladding installed to the subject roof frame does not comply with manufacturer's specifications and therefore may be allowing water ingress to occur.
...
The QBCC has found that no consequential damage (moisture staining) to the Living Room ceiling was evident when an inspection occurred in May 2021. The ceiling surface has a large moisture stain present between the front door entry and kitchen that was not evident during the previous site inspection. Therefore, the QBCC considers there is sufficient evidence that the licensee is responsible for the consequential damage caused to the Living Room ceiling.
Furthermore, the licensee has installed a roof cladding that is not fit for purpose or is suitable for a sprung curve ridge roof as per manufacturer's specifications.
QBCC Decision:
... the Queensland Building and Construction Commission finds licensee [Michael John Sophocleous] responsible for consequential damage to the Living Room ceiling, as the Metlok Cyclonic roof cladding installed to the existing sprung curve ridge roof frame does not comply with manufacturers (sic) specification. ...
It is difficult to determine if water ingress has occurred recently in the hallway since the previous inspection was undertaken.
...
There is a possibility that water ingress may occur internally, due to new roof cladding not being fit for purpose. Torrential rain event may be required to ascertain if the new roof is leaking above the hallway area.
(iii) In terms of the solar hot water unit in the roof:[30]
The licensee has used a painted timber block to help support the solar hot water system on the roof cladding.
Timber products are not deemed suitable or considered compatible to be fitted on top of sheet metal roofs, as per HB 39:2015 Installation Code for Metal Roof & Wall Cladding. Timber does not meet the same durability performance as sheet metal roofing, which may affect drainage from roof pans or allow moisture to be present on roof surface for prolong (sic) periods.
....
(a) In terms of the reference to a hammer left under the roof, at the time of his first inspection he observed 2 to 3 new sheets laid but there was a hammer that had been left between sheets which had later been removed;
(b) When he inspected the inside of the house at that time, he noted sporadic water staining to ceilings in various rooms but he was not able to determine if it was due to the hammer having been left between the sheets;
(c) He explained his references to the roof cladding being 'not fit for purpose' as being reliant on the following construction methods he observed:
(i) A ridge capping was installed but was not required unless the roof sheeting was broken into two parts;
(ii) Penetrations to the roof sheeting have been silicone sealed only instead of a Dek-tight seal being used;
(iii) The roof sheeting will not last its full expected life - it will deteriorate rapidly because the sheeting is not designed to hold ponded water.
Mr Sophocleous It was your suggestion to break to put the ridge capping on the roof to conceal the oil canning.
Mr Sargent No - I said to break the ridge but also contact Metroll. It was not intended to be continuous. You cannot put a ridge cap on Klip-Lok. Oil canning is at the top of the roof under the ridge cap - it will hold water.
Mr Sophocleous Did you assess the pitch of the roof by putting a level on it?
Mr Sargent Yes - 2.2 degrees
Mr Sophocleous Given the distance between the beams and the pitch, only Klip-lok is suitable.
Mr Sargent No - Trimdeck could be used.
During the inspection, I identified the following:
(a) The Metlok 680 roof sheeting was not installed as per manufacturers (sic) specifications and will not meet region C requirements as currently installed;
(b) The Roll Top Ridge Cap used is not designed for this use with Metlok 680;
(c) Swarfing (corrosion) is evident on the roof and in the gutter which in my experience will void any Bluescope warranty on the materials which may otherwise apply; and
(d) Sawtoothing into the gutters is evident.
My opinion is that, at the date of my inspection on 22 September 2022 the roof:
(a) Does not comply with Australian Standards AS 1562 and AS4040 for cyclonic regions;
(b) is most likely not eligible for any kind of BlueScope warranty.
(a) ensuring the manufacture of rolled formed products to strict tolerances;
(b) supplying technical information and advice to architects, building designers, and roofing contractors in relation to steel building products;
(c) selling and supplying high quality steel building products; and
(d) managing all facets of two of Australia's leading local manufacturers and suppliers of steel building products including roofing, cladding, rainwater, structural and fencing products.
(a) Identifying and providing a copy of the manufacturer's specification to which he referred;[33]
(b) Explaining that in his opinion the consequences of it not being installed as per manufacturer's specification is that:
It will not hold up. It is at risk of failure during a cyclone.
Mr Sophocleous Do you hold a QBCC licence for roofing?
Mr Macconnell No - I am a manufacturer.
Mr Sophocleous Have you installed a roof?
Mr Macconnell No.
Mr Sophocleous Why is it not in the M 680 specification that it is not to be used for curving?
Mr Macconnell You do not put everything in a standard as to what it is not designed for.
Mr Sophocleous Stramit Speed Deck Ultra can be curved.
Mr Macconnell Yes.
Mr Sophocleous Stramit Speed Deck Ultra is the same as Metroll680.
Mr Macconnell No - similar but different.
Mr Sophocleous The M680 and M700 product brochures are similar. Are they the same product or different?
Mr Macconnell They are a different profile. M680 is a higher profile not tested for spring curving. The M700 installation guide can be used as a reference for the installation of M680 in terms of stamping down in clips.
After inspection of the roof ... it is event (sic) that the roof has multiple issues regarding installation and material used on site.
Lots of swarfing is evident on the roof meaning the roof was not washed off after installation.
Swarfing avoids (sic) the warranty.
The product used was Metlok 680 is (sic) not designed for a curved roofs (sic) and should not be wrapped over the roof. The roll top used is not suited for the application on site.
The fixing of type 17 screws is (sic) on the metlok (sic) with a high rib must comply with cyclone testing data.
Metlok roof sheeting was not installed as per manufacturer's specifications.
All five point (sic) above are non-complianant (sic). The entire roof need s (sic) be replaced to be made complaint (sic). The water ingress during installation is also evident throughout the home. The roof frame is exposed rafters. This needs to be repaired as well. This can only be repaired during the roof removal to be done property.
...
Whilst removing the roof the battens must be removed to repair the ceiling sheets and re-instated, also new battens will need to be installed to meet current building codes. This also will require building approval. This quotation includes all of these costs.
Mr Sophocleous How are you going to replace the roof, what type of roof will you use?
Mr Eden Trimdeck - split the ridge - if new battens are required these will be installed - I do not know what is required because I could not see any screws on the roof.
(a) His quote could be more or less dependant on the amount of water damage and the extent of battening required;
(b) He has based his quote on wind classification of C 3.
There was extensive damage to the insulation under the old sheeting. In my opinion it was water damage caused by penetration through the old sheeting.
Ms Saunders You decided (when giving your quote on 10 February 2021) that the roof was a sprung curve roof and that 0.48 KlipLok material was appropriate.
Mr Sophocleous The existing sheeting was Trimdeck and installed as a sprung roof. Doing it again in that way alleviated the need for re-organising the frame. I was satisfied from my observations and experience that it was an acceptable method of construction.
Ms Saunders The description 'KlipLok' can be any product from any supplier.
Mr Sophocleous Yes.
Me Is KlipLok specific to Metroll.
Mr Sophocleous No. It is a Lysaght term but used across the board in the industry as a clip down system. Metroll's product is known as Metlok.
Ms Saunders Did you consult with Metroll before you quoted the work?
Mr Sophocleous No.
Ms Saunders You ascertained Metlok680 was a correct product?
Mr Sophocleous Yes - I always intended to use Metlok680.
Ms Saunders Did you tell anybody at Metroll it was to be sprung curve?
Mr Sophocleous No.
Ms Saunders Did you have specs for 680?
Mr Sophocleous No - I had Metroll700.
Me Why did you select Metroll680 and not Metroll700?
Mr Sophocleous Metroll680 provides for more fixings per m2 and allows for screw fixings which Ms Currow asked me to do. Also it has better cyclone rating.
Me What is the radius of the curve of the roof?
Mr Sophocleous I worked it out to be a radius of 88m - height of 125 mm at ridge with a fall of 1.5O over a width of 10 m up to 13 m.
Me When did you work this out?
Mr Sophocleous At the time I did the quote for the job.
Metlok680 is the correct reference document as this is the product manufactured and supplied by our Cairns branch. The correct and current product guide, 'Metlok680 Cyclonic Roofing Brochure' is following this letter. This product guide should be used when referring to Metlok produced and supplied from Metroll Cairns.
Additionally attached is the Metlok 700 Cyclonic Brochure. Whilst this is a slightly different system, with different sheet cover, clip system and load/span tables, it may be useful as it includes more installation information which is generally consistent with the Metlok680 installation. Please note if there are any differences between the Metlok680 and Metlok700 product guides the Metlok680 guide will prevail for the Cairns made product.
(a) A Metlok680 sheet has a cover of 684 mm and a rib height of 41.5 mm;
(b) A Metlok700 sheet has a cover of 700 mm and a rib height of 40 mm;
(c) The minimum pitch for both is 1 degree;
(d) Both are stated to be designed for long run roofing applications, and both stated as being suitable for use in cyclonic areas.
(e) It is only the Metlok700 guide that contains a reference to 'spring curving'.
Me Is Metlok 680 and Metlok 700 the same product?
Mr Grambower No.
Me Can Metlok 680 be used as a spring curved roof sheet?
Mr Grambower Possibly, but not recommended because it has never been tested - not common to use.
On inspection of the property I ascertained that the following issues were present:
- - Possible 0.42 gauge material was used, causing "oil canning" of sheets between roof battens, which will create water ponding in the pan of the sheets
- - We advise using 0.48 gauge to address the above issue
- - Incorrect penetration of hot water service pipes through new roof cladding
- - ...
- - Multiple steps in roof end sheets at gutter line which is indicative of poor installation method
- - Screws used sporadically to fix down an otherwise 'clip fixed' roof profile
- - Ridge cap installed on a sprung curved roof, which was not required
- - Solar hot water service incorrectly mounted on blocks of timber on new roof sheets.
- - ...
Mr Sophocleous You are proposing to use Stramit Speed Deck sprung curve.
Mr Ashby Yes.
Mr Sophocleous It is standard practice in Cairns.
Mr Ashby Yes.
Mr Sophocleous You will use 0.48.
Mr Ashby Yes.
Mr Sophocleous How long have you been a roofer?
Mr Ashby Since 1995.
Mr Sophocleous How long have you been in Cairns?
Mr Ashby 18 years.
Mr Sophocleous You feel this is the best solutions in roof replacement.
Mr Ashby Yes due to roof structure being the old style.
Mr Sophocleous You use a Klip-Lok style of roof sheeting.
Mr Ashby Yes - best solution for foot traffic - Trimdeck is not suitable due to minimum fall of 20
Mr Sophocleous What about the use of a ridge capping although a sprung roof.
Mr Ashby It's not common but not a bad idea. In sprung curve you do get a flat point and you can get ponding.
Mr Sophocleous What would you say in general about the roof itself?
Mr Ashby I do not know if it was clipped - I can see it is sporadically screwed. Metlok can be screwed if you use the right screw. Workmanship in some areas was poor - not the best.
(a) Under Clause 4.1(b) of the terms of the Contract, being the warranty imposed under the QBCC Act Schedule 1B s 20, namely that all materials supplied in performance of the Contract Work would be, having regard to the relevant criteria, suitable for the purpose for which they are used, with the 'relevant criteria' referred to therein being either:
(i) Generally accepted practices or standards in the building industry for the materials; or
(ii) Specifications, instructions or recommendations of manufacturers or suppliers of the materials.
(b) under Clause 4.1(d) of the terms of the Contract, being the warranty imposed under the QBCC Act Schedule 1B s 21, namely that the Contract Work would be carried out in accordance with all relevant laws and legal requirements, including for example, the Building Act 1975. In turn she argued that for building work to be compliant with the Building Act it must be compliant with the relevant standards as referred to in the Building Code of Australia,[48] asserting that the relevant standard is AS 1562 Part 3.5.1 therein.[49]
(a) used Metrol680 roof sheeting as a sprung curve roof, albeit that such product is not "designed for spring curved roofs and does not meet the requirements of Table 7.17.1(A) in HB 39:2015 and is therefore not fit for purpose."[50], and
(b) included a "ridge cap which impacted the integrity of the sheets rendering the installation method non-compliant with AS 1562/HB39:2015".[51]
(c) There is a clear causal link between:
(i) the respondent's breach of warranties by failing to use good and proper materials, and to install such materials in accordance with the BCA, Australian Standards and manufacturers specifications; and,
(ii) the defective roof permitting water penetration resulting in internal damage to the property.
...
The type of roof sheeting and method of installation of the roof sheeting has caused the works to be noncompliant with the Building Act.
- Having regard to:
(a) the damage to the existing sheets, and
(b) the non-compliant installation method of the roofing sheets,
the reasonable and necessary course to achieve the works promised under the contract is the removal and replacement of the roof in its entirety.
The applicant claims against the respondent the cost of replacing the ceiling sheeting which is damaged.
That work (the replacement of ceiling sheeting) does not go beyond the work that the applicant had intended to be completed prior to the respondent undertaking the roofing work. However, the replacement of ceiling sheeting is now required because the existing ceiling sheets are damaged (and became damaged following the respondent's roofing works), as opposed to being an option that could have been taken up by the applicant (to replace ceiling sheeting that was in good condition with no visible damage, for aesthetic purposes only):
...
The applicant submits that:
(a) the evidence supplied by the applicant reasonably demonstrates that the water staining to the property is a result of the defective roof; and,
(b) the Respondent is responsible for the water ingress due to the non-compliant installation of the roof in contravention of the BCA and, pursuant to section 72(2) of the QBCC Act, is liable for the consequential damage.
Here, the issue is not that the work is, for example:
(a) aesthetically damaged which may reduce the value of the property, but that the work is not compliant with the relevant laws and is structurally defective; or
(b) defective in the sense that the contractor performed work that was different to what they were contracted to perform, but otherwise compliant with the Building Act (in which event the sensible approach would be to determine damages based on the reduction in value of the property).85
The issue at the heart of this dispute is that the product used by the respondent is not suitable for the applicant's roof; it is not fit for purpose.
The evidence supports a finding that the roof is non-compliant with the Building Act as a result of being non-compliant with the BCA.
This may only be remedied by removing the product and replacing it with a product that is suitable for the applicant's proof and necessarily compliant with the BCA, applicable Australian Standards, and Manufacturers Specifications. Such a course is reasonable and justified, and proportionate to the particular defect about which is complained.
(a) For Ms Currow - it was left up to me to determine a relevant quantum.
(b) For Mr Sophocleous - it was at most $500 being the cost of a box of screws and around 2 hours of labour.
A frequent consequence of self‑representation is that the Court must assume the burden of endeavouring to ascertain the rights of the parties which are obfuscated by their own advocacy.
(a) The Metlok cladding has been installed to the "existing sprung curve ridge roof frame"; and
(b) "To gauge if leaks have occurred from the recent rain events or are existing, then a more thorough examination (invasive) is required".
(a) he should not have installed the roof sheeting as a sprung roof ?; and/or
(b) Metlok680 is a product that could not have been used for a sprung roof ?
A Fundamental Flaw in the presentation of Ms Currow's case
(a) having regard to the relevant criteria, suitable for the purpose for which they are used, so as to show a breach of the warranty under Clause 4.1(b) of the Contract, it being s 20 of Schedule 1 B of the QBCC Act, namely was it in accordance with the following:
(i) generally accepted practices or standards applied in the building industry for the materials; or
(ii) specifications, instructions or recommendations of manufacturers or suppliers of the materials.
(b) carried out in accordance with all relevant laws and legal requirements, including, for example, the Building Act 1975, so as to show a breach of the warranty under Clause 4.1(d) of the Contract, being the warranty imposed under the QBCC Act Schedule 1 B s 21.
Where a builder has carried out work to a building which requires remediation, the issue that arises is whether the building Owner is entitled to the cost of repairing that defective work - the cost of cure - or is limited to the diminution in the value of their building as a consequence of the defective quality of the work undertaken.
... the measure of damages recoverable by the building owner for the breach of a building contract is ... the difference between the contract price of the work or building contracted for and the cost of making the work or the building conform to the contract, with the addition, in most cases, of amount of profits or earnings lost by the breach.
The qualification, however, as to which this rule is subject is that, not only must the work undertaken by necessary to produce conformity, but it must be a reasonable course to adopt. ... Many examples may, of course, be given of remedial work, which though necessary to produce conformity would not constitute a reasonable method of deal with the situation and in such cases the true measure of the building owner's loss will be the diminution in value, if any, produced by the departure from the plans and specifications or by the defective workmanship or material.
As to what remedial work is both "necessary" and "reasonable" in any particular case is a question of fact. ...
[3] Ex 5 pg 3. See also Ex 26. Capitalisation is as it appears in the original.
[8] Ex 8 - see pg 3 of the EDR Report therein.
[11] Ex 5 para 33. See also Ex 5 para 47 for additional items said to have been reported by Ms Currow,
[14] Ex 5 para 82. A copy of the Report is Ex 9. Ms Currow stated that the Direction was issued on 22 March 2022 (see Ex 5 para's 84 and 85, however a copy of the Direction to Rectify was not put into evidence during the hearing, only a copy of the covering letter to it.
[21] Such being done by way of a Footnote to Exhibit 5.
[23] The words stated here as attributed to individual persons is not taken from a transcript and so is not to be read as being verbatim. It is as per the notes I took during the hearing. Wherever similar references are made in these reasons the same applies.
[24] This questioning arguably went beyond the ambit of issues raised in cross-examination and thus technically not permissible however it was not objected to and thus I allowed it. It also provided me with some clarity as to the meaning of Mr Everett's evidence.
[26] Ex 8 and Ex 9. Whilst within the second report which is Ex 9 it is state that a copy of a Direction to Rectify as issued to Mr Sophocleous was enclosed therewith, a copy of that Direction did not appear in the bundle tendered as the report of Mr Sargent.
[29] Ex 9 - pg 4 of 15. Similar comments are made in terms of the 'Main Bedroom' (pg 5), 'Bedroom 3'(pg 7).
[31] Oral evidence-in-chief of Mr Sargent.
[37] Ex 18 at Pg 4 - see photographs referenced as Document ID 2 to 7; at Pg 5 - see photographs references as Document ID 1 to 4.
[40] This exchange is not a single series of questions and answers but taken from my notes of such at various times during his cross-examination, all of which I have put together in this way as it dealt with a consistent aspect of the issues to be determined in this proceeding.
[41] Ex 17. Emphasis as is in the original.
[42] Ex 5 para's 79 to 81. See also Anx JC-22 to Ms Currow's statement.
[43] Ex 5 para's 94 and 95. See also Anx JC-28 to Ms Currow's statement.
[46] These were received as Exhibits 27 to 31 respectively.
[47] Ms Currow's filed 16 October 2024 - Ex 36. Mr Sophocleous's filed 23 October 2024 - Ex 37. Ms Currow's in reply filed 28 October 2024. - Ex 38.
[57] It is public knowledge that Cyclone Jasper was a severe weather event which hit the Cairns Region in December 2023 causing substantial torrential rain to fall on Yorkey's Knob, being the suburb of Cairns where Ms Currow's house is situated.
[58] Penfold v Firkn & Balvius [2023] QCATA 11 at [37] per Judicial Member Forrest SC.
[59] [1994] HCA 23; (1994) 68 ALJR 509, 510.
[63] Similar observations may be made about Ms Currow's allegations that were interspersed in her statement and closing submissions about a television antenna, even though no evidence was led dealing with that issue.
[64] Ex 9 pg 8 of 15. Whilst the Direction to Rectify did not form part of the documentary material before the Tribunal, I infer it was an item contained therein requiring rectification.
[65] N. Dennys and R. Clay, Hudsons - Building and Engineering Contracts 13th Ed (London: Sweet & Maxwell, Thomson Reuters (Professional) UK, 20150, at 7-006, p.828.
[66] Ibid, p.829, see Bellgrove v Eldridge (1954) 90 CLR 369, 617.
[67] Bellgrove v Eldridge (1954) 90 CLR 369, 618 and 619.
[68] See Owners SP 92450 v JKN Para 1 Pty Limited [2023] NSWCA 114;[71] and the earlier authorities cited therein.
[69] As noted in State of New South Wales v Stevens [2012] NSWCA 415; (2012) 82 NSWLR 106 at [36], the quantification of nominal damages is discretionary.
[70] See again Owners SP 92450 v JKN Para 1 Pty Limited [2023] NSWCA 114;[71].
Currow
Sophocleous [2025] QCAT 174
(1954) 90 CLR 369
(1994) 68 ALJR 509
(2012) 82 NSWLR 106