[2025] VCAT 480
General information, not legal advice.
Victorian Civil and Administrative Tribunal
2025-05-29
Original judgment source is linked above.
(a) A reduction in the width of the permeable paving car park from 3,000mm to 2,400mm to allow for a 300mm garden area along the northern edge of the car park.
(b) The Electric Vehicle (EV) charge station located on the northern façade of the dwelling and set back from the front façade.
(c) All trees to be retained clearly identified in accordance with their designation as noted within the Arborist's Plan dated 04/06/2022, prepared by ArborReport Victoria.
(d) Tree protection fencing is to be erected around the TPZ of the street tree (Tree 13) to 2m, where occurring on the nature strip.
All fencing is to be erected prior to the commencement of all works on the site including demolition.
(e) All excavations for the construction of the proposed crossover are to be supervised by a suitably qualified and experienced arborist with all root pruning undertaken in accordance with section 9 of AS4373-2007 Pruning of Amenity Trees.
(f) A Tree Protection Zone (TPZ) of 3.73m for Tree 9.
TPZ measures to be installed before any works occur on site, including demolition works. The proposed driveway must be constructed at or above the existing soil level, with permeable materials (e.g. paving with geo-tec liner), and with no trenching or major excavation inside the TPZ.
These works will be closely supervised by the project arborist, to ensure there is no inadvertent impact to the roots of this tree.
(g) A Tree Protection Zone (TPZ) of 2.64m for Tree 11.
TPZ measures to be installed before any works occur on site, including demolition works. The proposed driveway must be constructed at or above the existing soil level, with permeable materials/paving, and with no trenching or major excavation inside the TPZ. These works will be closely supervised by the project arborist, to ensure there is no inadvertent impact to the roots of this tree.
(h) A section diagram of the material proposed within the car space.
When approved, the plans will be endorsed and form part of this Permit.
(a) constructed
(b) properly formed to such levels that they can be used in accordance with the plans
(c) surfaced with an all-weather sealcoat; and
(d) drained
(a) The development does not start within three (3) years from the date of this Permit; or
(b) The development is not completed within five (5) years of the date of this Permit.
(a) Before this Permit expires;
(b) Within six (6) months after the expiry date; or
(c) Within twelve (12) months after the expiry date if the request relates to the completion of the development or a stage of the development.
[1] I have considered all the written and verbal submissions made by the parties (including all of their tendered documents), and the filed statement of grounds. In accordance with the practice of the Tribunal, I do not refer to all of the contents of these documents in my reasons.
Croker
Darebin CC [2025] VCAT 480