[2025] WASAT 132
General information, not legal advice.
State Administrative Tribunal (WA)
2025-11-28
Mr P
Original judgment source is linked above.
CITATION : COTTON and SOVEREIGN BUILDING COMPANY PTY LTD [2025] WASAT 132
Building dispute - Application for conversion of order to remedy of Building Commissioner to order to pay - Scope of works required for compliance - Reasonable costs of works
Building dispute - Complaints that regulated building service not carried out in a proper or proficient manner or faulty or unsatisfactory - Whether damp proof course present - Complaints of non-compliant lintels - Reasonable costs of works
Mortar Joints - There are more joints that are over the allowable measurement of 20mm for a mortar joint as per the supplied photos/inspection report and as per the Guide of Standards and Tolerances 2019 WA. The joints are running from 5mm to 30+mm.
The Respondent is to remedy the mortar joints of the external face brickwork to be within the tolerances stipulated in Australian Standard 3700-2018 Masonry structures Table 12.1 Tolerances in masonry construction.
All works are to be carried out in a proper and proficient manner, making good any affected surfaces.
The respondent is to make good all areas affected by repairs.
This order is to be complied with within 28 days of the date of this order.
(a) the scope of the works required to obtain compliance; and
The Inspector wet tested the mortar, and could establish no PPE was integrated with the mortal mix.
RM does not agree that either the RM or LD tests were a suitable test to confirm if there was a DPC in the brickwork.
Item 5 - Non-compliant lintels above window frames and doors
I certify that the preceding paragraph(s) comprise the reasons for decision of the State Administrative Tribunal.