[2026] FWC 166
General information, not legal advice.
Fair Work Commission
2026-01-16
Original judgment source is linked above.
s.739 - Application to deal with a dispute
Communications, Electrical, Electronic, Energy, Information, Postal, Plumbing and Allied Services Union of Australia
Endeavour Energy Network Management Pty Ltd Trading AS Endeavour Energy
Alleged dispute about any matters arising under the enterprise agreement and the NES;[s186(6)]
[1] The Communications, Electrical, Electronic, Energy, Information, Postal, Plumbing and Allied Services Union of Australia (Applicant) has made an application pursuant to s.739 of the Fair Work Act 2009 (Cth)(FW Act) seeking that the Fair Work Commission (Commission) deal with a dispute in accordance with the dispute settlement procedure of the Endeavour Energy Enterprise Agreement 2021 (Agreement). The Respondent to the dispute is Endeavour Energy Network Management Pty Ltd (Respondent).
[2] The dispute relates to a proposal by the Respondent to have employees who are not licensed electricians perform the installation and commissioning of community batteries.
[3] The Respondent proposes to install lithium-ion community batteries throughout its network as a part of an initiative to reduce carbon emissions and transition to renewable energy. The batteries will allow for the storage of surplus power created by rooftop solar, which can then be used during periods of higher demand. Consumers who wish to participate in the scheme will be able to rent a portion of a community battery. The Respondent submits this will assist households to save on energy costs while providing more people with access to solar power.
[4] Summarised at a high level, the Applicant's position is that the installation and commissioning of community batteries can only be done safely by licensed electricians. The Respondent does not agree and asserts that the unlicensed employees it wishes to undertake the work already have the skills to do the work and have received appropriate training.
[5] The parties are also in dispute as to whether the proposal amounts to a change that 'Materially Impacts' employees, as defined in the Agreement, and if so, whether the Respondent is required to provide certain information to the Applicant to meet its consultation obligations under the Agreement. The Applicant contends that Respondent is required to consult and provide to employees and their representatives information about the training proposed and how employees will be assessed as competent to perform the work. The Respondent does not consider that the proposal amounts to a change that 'Materially Impacts' employees but says it has nevertheless provided the information.
[6] The dispute resolution procedure in clause 35 of the Agreement broadly states at clause 35.1.1:
'The dispute resolution procedure will be used to deal with all disputes arising out of the employer-employee relationship.'
[7] The dispute resolution procedure includes graduated tiers. Clause 35.2.1 provides:
'35.2.1 Tier 1 disputes will be resolved at the local level as far as practicable and in a timely manner, with the involvement of the following:
a) the employee(s) concerned;
b) the employee's chosen support person (who may be a union representative or other individual)(if requested by the employee(s)); and
c) the supervisor, and manager (if required)'.
[9] Clause 35.3.1 of the Agreement provides that if the dispute is not resolved at Tier 1 level or is a corporate wide issue, it may be referred to Tier 2 level with involvement of the employee(s) concerned, the employee's chosen support person or union organiser (or other person designated by the union organiser) and relevant senior manager(s), affected local manager(s) and the manager with responsibility for industrial relations (or other persons designated by that manager). The Applicant escalated the dispute to Tier 2 and the parties met between August 2024 and November 2024, but the dispute did not resolve.
[10] Clause 35.4.1 of the Agreement, dealing with Tier 3 Disputes, provides that if the issue or dispute remains unresolved, it may be referred to the Commission for conciliation and/or arbitration. The dispute has now reached Tier 3, and it is not in dispute that the Commission has the jurisdiction to deal with the dispute.
[11] The dispute was not resolved via Commission facilitated mediation and the matter proceeded to arbitration in accordance with clause 34.4.1 of the Agreement. A hearing was held for this purpose.
[12] Both parties sought to be represented by lawyers. The matter involves complex considerations regarding work health and safety, skills and competencies and the broader regulatory environment concerning electrical work. As such, permission for both parties to be represented by a lawyer was granted pursuant to s.596(2)(a) of the FW Act on the basis that it would enable the matter to be dealt with more efficiently, taking into account the complexity of the matter.
[13] The following people gave evidence in support of the Applicant's case:
[14] The following people gave evidence in support of the Respondent's case:
30.1.1 The parties recognise that both Endeavour Energy and its employees have obligations under the Health and Safety Act 2011 (NSW) to ensure the workplaces safe.
30.1.2 Endeavour Energy's primary concern is the health and safety of its employees, contractors, visitors, customers and the general public. The parties to this Agreement agree to share an ongoing commitment to promote the health, safety and welfare of all employees, contractors, customers, visitors and a general public and nothing in this Agreement shall be designed are applied in ways that reduce or diminish this objective.'
[16] The Applicant also referred to clause 7.1 of the Agreement which provides:
7.1.1 The duties of Endeavour Energy, consistent with the Agreement and other relevant legislation, include the following:
a) to provide work;
b) to pay for the work performed; and
c) to provide a safe working environment'.
7.3.1 Endeavour Energy may direct an employee to carry out such duties as are within the employee's skill, competence and training consistent with the classification structure of this Agreement provided that such duties are not designed to promote deskilling.
7.3.2 Endeavour Energy may direct an employee to carry out such duties and use such tools and equipment as may be required provided that the employee has been properly trained in the use of such tools and equipment.'
[22] The dispute involves highly technical considerations and during the hearing it became apparent that the precise matters about which the parties were in dispute were unclear. The matter was adjourned to enable the parties to continue their discussions and, if necessary, file further materials. Following that process, the parties identified the specific aspects of the work about which they remained in dispute, and the Applicant sought a further alternative order that:
[24] As the dispute had originally centred around cable jointers and line workers, the Respondent also submitted that installation of community batteries:
[26] In this regard, Mr Messer gave evidence that:
[27] Ms Koot did not agree that there would be delays and gave evidence that:
[28] Having considered the competing positions of the parties, the matters that need to be determined to resolve the dispute include:
[29] Mr Messer gave evidence that the field crews that have been undertaking community battery installation are comprised of:
[30] Mr Thornton gave evidence that the field crew working on community batteries is also made up of:
[32] Whether EFMs who do not hold an electrical licence should be able to undertake testing and commissioning of the batteries is also a key matter in contention.
[35] Mr Shanahan said the overall design of the community battery includes:
[36] The batteries used by the Respondent were procured by engineers with battery subject matter expertise with two use cases in mind, i.e. for use as:
[37] Mr Messer gave evidence that there are currently two different types of batteries that the Respondent installs on its network:
[38] However, Mr Johnson said these are not the only types of batteries used and that there are other types of community batteries installed on the network including:
[39] Field workers involved in installing community batteries are required to follow and use:
[40] Mr Messer gave evidence that when installing EcoJoule batteries the field crew are required to:
[42] Mr Messer gave evidence that when installing Pixii batteries the field crew are required to:
[47] Mr Thornton gave evidence that employees that hold one of the following authorisations are able to install equipment on the Respondent's network:
[49] Mr Messer gave evidence that the authorisations held by field crew team members installing community batteries cover:
'Perform electrical testing, connection and/or inspection activities at ground level and aloft on a pole/structure (including utilising energised LV work practices to apply temporary insulating material/barriers where required and the use of low voltage insulating gloves).'[50]
What specific training has been provided in respect of community battery installation?
[66] The Presentation also indicates that the awareness session includes a practical activity involving inspection of a Pixii Power Shaper battery and EcoJoule EcoSTORE battery on site at the Training Centre.
[72] In respect of the terminology used in the table below, Mr Thornton clarified:
The installation of ducts, conduits and earthing must be installed by a licensed electrician
The mounting hardware should be installed by a licensed electrician or checked by a licensed electrician after they are installed
Can be done by an electrician (unlicensed or equivalent)
Must be directly supervised by a licensed electrician
Electrical connection checks at LCL filter and transformer
Contractual maintenance is completed by the battery supplier
The installation of ducts, conduits and earthing must be installed by a licensed electrician
Can be installed by an 'Electrically Qualified Person'
The mounting hardware should be installed by a licensed electrician or checked by a licensed electrician after they are installed
Can be done by an 'Electrician (EFM)' excluding remote functional checks
Can be done by an 'Electrician (EFM)' excluding remote functional checks
Contractual maintenance is to be completed by the battery supplier
The installation of ducts, conduits and earthing must be installed by a licensed electrician
The mounting hardware should be installed by a licensed electrician or checked by a licensed electrician after they are installed
Step 11: Turn off DC, apply danger tag and test/prove de-energised
Can be done by an 'Electrician (EFM)' excluding remote functional checks
Inspection maintenance is to be completed from ground level and visual only
The installation of ducts, conduits and earthing must be installed by a licensed electrician
Can be installed by an 'Electrically Qualified Person'
The mounting hardware should be installed by a licensed electrician or checked by a licensed electrician after they are installed
Can be installed by an 'Electrically Qualified Person'
The mounting hardware should be installed by a licensed electrician after they are installed
Can be installed by an 'Electrically Qualified Person'
Step 14: Turn off DC, apply danger tag and test/prove de-energised
Can be installed by an 'Electrically Qualified Person'
Can be installed by an 'Electrically Qualified Person'
Can be installed by an 'Electrically Qualified Person'
Can be installed by an 'Electrically Qualified Person'
Can be installed by an 'Electrically Qualified Person'
Can be installed by an 'Electrically Qualified Person'
Can be done by an 'Electrician (EFM)' excluding remote functional checks
Can be done by an 'Electrician (EFM)' excluding remote functional checks
Inspection maintenance is to be completed from ground level and visual only
The installation of ducts, conduits and earthing must be installed by a licensed electrician
Not applicable. There will be no further installation of these batteries and it is expected that all of these units will be removed from service this year.
The mounting hardware should be installed by a licensed electrician or checked by a licensed electrician after they are installed
Who does the Respondent want to test and commission batteries?
What is involved in testing and commissioning community batteries?
[76] Mr Shanahan gave evidence that tests involved in the commissioning process for community batteries include:
and these tests are typically carried out by line workers or cable jointers on overhead lines, ground cables, and associated switches.[92]
Is this different to the work that the workers usually do?
Do workers have the competency and experience needed to test and commission community batteries?
Risks the Applicant said arise from having unlicensed workers test and commission community batteries
assuming low voltage AC is present and suffers electric shock resulting in possible severe injury or death
bond and the pre engineered bond has a high resistance
Door may not be earthed properly and becomes live in the event of a fault
worker/public resulting in possible severe injury or death
Incorrect test results using the neutral continuity instead of testing earth continuity. A fault could result in metal components
becoming live resulting in possible electric shock of worker/public resulting in possible severe injury or death
Fire from short circuits or possible electric shock of worker/public resulting in possible severe injury or death
[90] Page 41 of the Presentation is entitled "Site Preparation and Clearances", shows two pictures and includes the description "Installation of 2.4m earth stake adjacent to Battery cabinet".
[91] Page 46 of the Presentation is entitled "Installation key points - Earthing /Protective Bonding", includes four pictures and has the following instructions:
"Connect bonding cable from main earthing point to the bonding copper busbar on the bottom of the cabinet with M8 lug".
"Connect earthing between the Distribution Board main earth bar and:
[97] The Applicant indicated that it holds concerns about exposure to DC and 'hot joints' and referred to elements of the Presentation that it indicated gave rise to this concern.
[98] Page 12 of the Presentation sets out the table comparing the different types of batteries and their specifications as set out below:
[99] Page 13 of the Presentation provides the following examples of hazards and controls from a LV Battery SWMS which are said to "highlight the main points relating to BESS systems":
State 'stored DC energy in LVAA special conditions, maintain clearances, use LV Live Work procedures, rated LV insulating gloves
Electric shock and / or flash burn (possible if cells fail)
PPE, insulated equipment and testers, covered tools
Spill Kit, complete electrical isolation of unit, create exclusion zone
Awareness of flammable gases, PPE, provide ventilation (open doors / use fans)
Use mechanical lifting apparatus where available / suitable, seek assistance, manual handling techniques
Isolate supply at upstream switches, call 000, secure area, notify Ops Manager
[100] A note on the bottom of page 13 of the Presentation states:
[101] Page 14 of the Presentation is entitled "Isolation of LV Battery - General Principle" and provides instruction regarding isolation in a non-routine emergency situation and a routine non-emergency situation. In relation to an emergency situation the Presentation states:
"When it's UNSAFE to open the LV Battery cabinet, the upstream isolations should be used.
Refer to individual BESS SWMS for appropriate actions and safety precautions."
[102] In relation to a non-emergency situation the Presentation states:
"When it's SAFE to open the LV Battery cabinet, the local BESS isolations can be used.
Refer to individual BESS manual for applicable isolation points, circumstances for use and appropriate safety precautions."
[104] Ms Koot noted that the Presentation indicates that:
[106] In response Mr Thornton gave evidence that:
[107] Page 36 of the Presentation is entitled "Identifying LV Ground Batteries" and refers to the installation of a Pixii Power Shaper 2.0 battery. A note next to an image of a meter-box states:
"Note: Bypass terminal block will be installed on initial energization until metering provider returns later to install the meter."
[109] Ms Koot gave evidence that when a device is not installed, tested and commissioned correctly, risks include, but are not limited to hot joints which can:
[117] Mr Thornton gave evidence that to obtain an electrical licence, workers must:
[121] Mr Thornton gave evidence that for the Respondent to consider a worker to be an 'electrically qualified person' it requires one of the following qualifications to be held:
[122] In this regard Mr Thornton gave evidence that:
[123] The Applicant submitted that line workers and cable jointers have their own specific qualifications being:
It appears that the Certificate III in ESI - Cable Jointing has been replaced by or is intended as a reference to UET30821 Certificate III in ESI - Distribution Underground.
[126] Both UET30621 Certificate III in ESI - Distribution Overhead and UET30821 Certificate III in ESI - Distribution Underground include the unit 'UETDRIS008 - Install and maintain electrical apparatus' as a core unit. Mr Thornton gave evidence that 'UETDRIS008 - Install and maintain electrical apparatus':
[127] The prerequisites for 'UETDRIS008 - Install and maintain electrical apparatus' appear to be:
[128] Mr Thornton gave evidence that prior to the development of a nationally recognised qualification outcome in 1998 for powerline workers:
[129] Mr Thornton said that while the content of these traineeships has never been officially mapped to the current Certificate III qualification, it is recognised and widely accepted as an industry norm that these craft certificate workers are deemed equally as competent as a Certificate III qualified worker, provided:
electrical equipment means an apparatus, appliance, cable, conductor, fitting, insulator, material, meter or wire that -
(a) is used to controlling, generating, supplying, transforming or transmitting electricity at a voltage greater than extra low voltage, or
(b) is operated by electricity at a voltage greater than extra low voltage, or
(c) is part open electrical installation located in an area in which the atmosphere presents a risk to health and safety from fire or explosion, or
(d) is, or is part of, and active impressed current cathodic protection system within the meaning of AS 2832:2015, Cathodic protection of metals, Part 1: Pipes and cables'.
[134] Mr Thornton gave evidence that for current apprentices, the most relevant units of competency in the Certificate III qualifications include:
[136] However, Ms Koot gave evidence that there are a number of units of competency in the Certificate III in Electrotechnology Electrician which are not in the qualifications for line workers, DPWs and cable jointers and which are necessary for the installation, testing and commissioning of independent power sources such as community batteries including:
[137] Ms Koot gave evidence that the following units are prerequisites for UEEE0014 - Isolate, test and troubleshoot low voltage electrical circuits (testing and verification) and do not form part of the qualifications held by line workers, cable jointer and DPWs:
[138] Ms Koot also gave evidence that the following units are prerequisites for UEEEL0039 - Design, install and verify electrical installations (capstone) and do not form part of the qualifications held by line workers, cable jointer and DPWs:
[141] Mr Thornton also gave evidence that the Respondent's Certificate III qualified workers:
[143] Mr Johnson gave evidence that the typical tasks of a grade 3 or 4 line worker include:
[145] Mr Johnson gave evidence that the typical tasks of a "middle grade" cable jointer include:
[146] Mr Johnson gave evidence that cable jointers employed in higher grades, such as grades 5 and 6, have the following additional responsibilities:
"Working as part of a small crew, being involved in all facets of underground, overhead and substation construction and maintenance activities as well as emergency restoration work and be involved in after-hours fault & emergency response when required."
[150] The position description describes the key accountabilities for the EFM role as follows:
[154] The parties are not aligned about the complexity level of the wiring work involved in community battery installation.
[164] There are various state laws that regulate who may carry out certain electrical work. Section 12 of the Home Building Act 1989 (NSW) (HB Act) provides:
'An individual must not do any residential building work, or specialist work, except:
(a) as, or as a member of a partnership or an officer of a corporation that is, the holder of a contractor licence authorising its holder to contract to do that work, or
(b) as the holder of an owner-builder permit authorising its holder to do that work, or
(c) as an employee of the holder of such a contractor licence or permit.'
[165] Item 1 of Schedule 1 to the HB Act provides that 'specialist work' includes electrical wiring work.
[166] Item 1 of Schedule 1 to the HB Act assigns 'electrical wiring work' the same meaning as it has in the Gas and Electricity (Consumer Safety) Act 2017 (NSW) (GE Act). Section 4 of the GE Act defines 'electrical wiring work' as:
'... the physical work of installing, repairing, altering, removing or adding to an electrical installation or the supervising of that work.
[167] Section 4 of the GE Act defines 'electrical installation' as:
' ... Any fixed appliances, wires, fittings, meters, apparatus or other electrical equipment used for (or for purposes incidental to) the conveyance, measuring, control and use of electricity in a particular place, but does not include the following:
(a) subject to any regulation made under subsection 4: any electrical equipment (other than a meter) used, or intended for use, in the generation, transmission or distribution of electricity that is:
(i) owned or used by an electricity supply authority, or
(ii) located at a place that is owned or occupied by such an authority,
(a1) a meter used, or intended for use, in the generation, transmission or distribution of electricity that is:
(i) owned or used by an electricity supply authority, or
(ii) located at a place that is owned or occupied by such an authority.
(b) any electrical article connected to, an extending of situation beyond, any electrical outlet socket,
(d) any electrical equipment operating at not more than 50 volts alternating current or 120 volts ripple= free direct current,
(e) any other electrical equipment, or class of electrical equipment, prescribed by the regulations.
(1) An individual must not do any electrical wiring work (whether or not it is also residential building work), except:
(a) as a qualified supervisor in respect of that work, or
(b) as the holder of a tradesperson Certificate authorising its holder to do that work under supervision, but only if the work is done under the supervision and in according to the directions, if any, of such a qualified supervisor.
Maximum penalty - 1,000 penalty units in the case or a corporation and 200 penalty units in any other case.
(2) Despite subsection (1), an individual may do electrical wiring work even though the individual is not such a qualified supervisor or holder, but only if such a qualified supervisor:
(a) is present at all times where the work is being done by the individual, and
(b) is available to be consulted by, and to give directions relating to how the work is to be done to, the individual.
(3) A qualified supervisor who is supervising any electrical wiring work being done by an individual as referred to in subsection (1)(b) must:
(a) give directions that are adequate to enable the work to be done correctly by the individual performing it, and
(b) personally ensure that the work is correctly done.
Maximum penalty - 1,000 penalty units in the case or a corporation and 200 penalty units in any other case.
(4) A qualified supervisor who is supervising any electrical wiring work to be done by an individual as referred to in subsection (2) must:
(a) give directions that are adequate to enable the work to be done correctly by the individual performing it (which, unless the qualified supervisor considers it unnecessary, must include directions requiring the individual to advise in detail on progress with the work), and
(b) be present when the work is being done and be available to be consulted by, and to give directions relating to how the work is to be done to, the individual, and
(c) personally ensure that the work is done correctly.
Maximum penalty - 1,000 penalty units in the case or a corporation and 200 penalty units in any other case.
(5) This section applies to an individual acting in the course of his or her employment by the Crown.
(6) In this section, "qualified supervisor" in respect of electrical wiring work means the holder of an endorsed contractor licence, or a supervisor certificate, authorising its holder to do that work.
[169] Despite this, clauses 26 (1) and (2) of the Home Building Regulation 2014 (NSW) provide:
(1) An individual who does specialist work is exempt from the requirements of section 12 (Unlicensed work) of the Act if the individual is the holder of an appropriate supervisor certificate and the work is done in connection with:
(a) premises that the holder owns or a dwelling in which he or she resides, or
(b) premises owned or occupied by the holder's employer.
(2) An individual who does electrical wiring work is exempt from the requirements of sections 12 (Unlicensed work) and 14 (Unqualified electrical wiring work) of the Act if:
(a) the individual is employed by an electrical supply authority principally for the performance of work other than electrical wiring work, and
(b) the electrical wiring work concerned is done in the ordinary course of the employees duties.
[170] In addition to the safety concerns it put forward in submitting that it is unsafe for non-licensed workers to install and commission community batteries, the Applicant's position appears to be that there is a legal requirement for those doing this work to hold a licence.
[172] In this regard the Respondent relied on the evidence of Mr Messer that:
[176] Mr Johnson expressed an understanding that:
[177] Mr Messer and Mr Shanahan gave evidence that although a meter is installed within the community batteries, the assets:
[180] The parties are in dispute about whether AS3000 applies to the work involved in installing and commissioning community batteries.
[184] Ms Koot also indicated that compliance with AS3000 was required, resulting in a need for licensed persons to undertake the work and gave evidence that:
[185] Ms Koot also expressed the view that testing is required to be done in accordance with AS3000 and noted that the Respondent's installation manual for the Rolls Royce (MTU) battery:
"Connect incoming phase conductors, neutral and earthing conductors. Ensure that the cable termination between the Electrical switchboard and the MTU QS6 is terminated as per AS3000 and the NSW Service Rules;"[228]
Do licensing laws require that the work be undertaken by a licensed electrician?
[188] Before considering the safety considerations relevant to the Licence and Commissioning Questions, I have firstly sought to identify whether there is any licensing law that specifically requires the workers to install and commission community batteries.
[189] The definition of 'electrical installation' in s.4 of the GE Act excludes both electrical equipment and a meter used, or intended for use, in the generation, transmission or distribution of electricity that is owned or used by an electricity supply authority or located at a place that is owned or occupied by such an authority. The community battery and associated meter is clearly used, or intended for use, in the generation, transmission or distribution of electricity and I accept the Respondent's evidence that it owns these assets. This means:
"This Standard may be applied through legislative requirements, made in each state and territory of Australia and in New Zealand, concerned with the safety of electrical installations. The Standard may also be applied in conjunction with any additional requirements, exemptions or restrictions in such legislation.
The principal application of this Standard is to electrical installations in all types of premises and land used by electricity consumers. However, the Standard may also be referenced or applied through legislative or other requirements relating to the effect of electrical installations in matters such as the following:
NOTE: For example, any relevant work health and safety legislation and associated codes.
NOTE: For example, national building codes [such as the National Construction Code (NCC), New Zealand Building Code (NZBC)] and the associated referenced Standards. See Appendix E for information on NCC and NZBC.
(c) Electricity generation, transmission and distribution systems.
(d) Safe connection to electricity distribution systems.
NOTE: For example, service rules and conditions provided by local electricity distributors.
[191] Compliance with AS3000 will clearly be required where it is applied via legislation but AS3000 is not itself a law.
[192] Section 34(a) of the GE Act provides that a person must not carry out electrical installation work otherwise than in accordance with the standard or requirements prescribed for the purposes of that section. Clause 34(1) of the Gas and Electricity (Consumer Safety) Regulation 2018 (NSW)(GE Regulations) provides that for the purposes of s.34(a) of the GE Act, electrical installation work is required to be carried out in accordance with the standards and requirements specified in that clause. Clause 34(3) of the GE Regulations requires electrical installation work to be carried out in accordance with the Australian/New Zealand Wiring Rules (i.e. AS3000 as defined in clause 3 of the GE Regulations).
[193] However, as I have earlier noted, the work falls within the exclusions from the definition of 'electrical installation' within in s.4 of the GE Act. It follows that it is not work requiring a licence under the HB Act. I have been unable to identify any other law that specifically requires a licence for the work.
[194] As such, I accept that there is no specific regulatory requirement that the Respondent's workers must be licensed to install community batteries in the circumstances of this matter.
[195] However, this does not provide a complete answer to the Licence and Commissioning Questions which require me to consider:
[199] While the Respondent may currently only use two types of batteries, its development of manuals for other types of batteries suggests that it has used or contemplates use of other batteries. The exception to this is the Xolta BAT-79 battery which it has indicted will no longer be installed and will be removed from service.
[200] During the hearing Mr Messer made clear that line workers and cable jointers would not be required to commission and test community batteries and I return to this issue below. These unlicensed workers make up the majority of the Respondent's field crew. A question arises as to whether they are able to undertake the aspects of community battery installation other than commissioning and testing.
[201] I accept that employees in these roles will generally hold one of the following qualifications:
[202] I accept Mr Thornton's evidence that the unit of competency 'UETDRIS008 - Install and maintain electrical apparatus', forms part of these Certificate III qualifications and:
[204] I also accept Mr Thornton's evidence that:
[206] I am unable to find that only licensed electricians are able to install community batteries safely. As such, I decline to make the order restraining the Respondent from requiring any employee who is not a licensed electrician to install batteries.
[208] While some EFMs may hold a licence, others do not. EFMs either hold the:
[209] A question arises as to whether the EFMs who have completed the UEE33020 Certificate III in Electrical Fitting qualification rather than the UEE30820 Certificate III in Electrotechnology Electrician can safely undertake commissioning and testing work. Both qualifications require completion of the following core units of competency:
[211] In addition to the 20 core units of competency identified above, the UEE30820 Certificate III in Electrotechnology Electrician qualification requires completion of the following core units of competency:
[212] The Applicant has identified the following as core competencies that workers would need to be able to do testing and commissioning safely:
[214] Ms Koot gave evidence that the following units are prerequisites for UEEEL0039 - Design, install and verify electrical installations and do not form part of the qualifications held by line workers, cable jointer and DPWs:
[215] Of the above prerequisite units for UEEEL0039 - Design, install and verify electrical installations, the following units of competency do not form part of the core units for the UEE33020 Certificate III in Electrical Fitting qualification:
[216] The National Training Register provides the following description of the unit:
"This unit involves the skills and knowledge required to design, install, inspect and test to verify an electrical installation is safe and complies with regulatory requirements.
It includes working safely; designing, installing, commissioning and fault finding of electrical installations; visual inspections and mandatory testing; following workplace procedures; and completing mandatory reporting requirements.
The skills and knowledge described in this unit require a licence or permit to practice in the workplace where work is carried out on electrical installations which are designed to operate at voltages greater than 50 volt (V) alternating current (a.c.) or 120 V direct current (d.c.).
Competency development activities in this unit are subject to regulations directly related to licensing. Where a licence or permit to practice is not held, a relevant contract of training, such as an Australian Apprenticeship, may be required.
Additional and/or other conditions may apply in some jurisdictions subject to regulations related to electrical work. Practice in the workplace and during training is also subject to work health and safety (WHS)/occupational health and safety (OHS) regulations.
Those holding an 'Unrestricted Electrician's Licence' or equivalent issued in an Australian state or territory meet the requirements of this unit and its prerequisite requirements.
A 'licensed electrician' who requires this unit to demonstrate currency for regulatory purposes may be required to undertake this unit to demonstrate their currency with verification of compliance requirements. In this case they are deemed to have met the prerequisites for this unit provided that they hold a current 'electricians licence' or its equivalent issued in an Australian state or territory; and, have recently been in employment as a licensed electrician sufficient to evidence current knowledge of applicable standards and regulations".[252]
"Connect incoming phase conductors, neutral and earthing conductors. Ensure that the cable termination between the Electrical switchboard and the MTU QS6 is terminated as per AS3000 and the NSW Service Rules."[254]
[218] I am persuaded that incorrect cable termination may give rise to safety risks of the nature identified by the Applicant such as a hot joint. The requirement for compliance with AS3000 in the Respondent's own battery installation manual would likely mitigate such risk and if a worker is required to terminate cables in accordance with AS3000, they will need to have knowledge of AS3000.
[223] The difficultly with the proposed order is that 'eligibility' for a licence is assessed by Service NSW and further disputes may follow regarding who is 'eligible' and who is not. As such, I have decided to make orders in clearer terms, being that commissioning and testing only be carried out by workers other than licensed electricians if those workers:
[224] Given the serious risks involved in commissioning and testing of community batteries, I am also persuaded that some level of supervised work experience should be required to undertake this work in addition to the above qualifications. The difficulty with aligning this to the requirements for a licence is that the work experience requirements for a licence relate to 'electrical wiring work' from which the work the subject of this dispute is exempt. Working on the network of an electricity supply authority also has a particular focus compared to work that may be carried out by other electricians who undertake range of activities on residential, industrial and commercial sites. In this regard aligning the experience requirements for testing and commissioning community batteries to general licensing requirements seems arbitrary.
[226] Addressing the Consultation Question requires consideration of:
20.1 The consultation provisions in the Agreement
[228] Clause 5 of the Agreement deals with consultation and clause 5.1 relevantly provides:
5.1.1 During the term of this agreement, proposed changes that will Materially Impact employees will be communicated to and subject to, consultation with impacted employees and their representatives.
[229] The term 'Materially Impact' is defined in clause 2.4.3 of the Agreement as follows:
'2.4.3 Materially Impact means, but is not limited to, changes that may result in:
a) The termination of the employment of employees; or
b) Major change to the composition, operation or size of the employer's workforce or to the skills required of employees; or
c) The elimination or diminution of job opportunities (including opportunities for promotion or tenure); or
d) Changes to the regular roster ordinary hours of work of employees; or
e) The alteration of hours of work; or
f) The need to retrain employees; or
g) The need to relocate employees to another workplace; or
h) The restructuring of jobs.
6.2.1 Any change will only occur following the consultation process outlined in Clause 5. In assessing the impact of the change, the assessment criteria below will be considered as part of the consultation process.
6.2.2 The assessment criteria will include, but is not limited to:
[231] The Agreement sets out a consultation process at Appendix D which explains:
'The following sets out what the process is for consultation depending on the impact of the proposed change. In the event that a different process may be required Endeavour Energy will consult with the impacted employees and their representatives about the proposed change to the consultation process.'
[232] Appendix D then goes on to set out differing processes for:
[233] When these provisions are read together in context, clause 5.1.1 sets out when the Respondent is required to consult, that is when a proposed change will 'Materially Impact' employees as defined in the Agreement. If the change will 'Materially Impact' employees, Appendix D sets out how the Respondent is required to consult, which will depend upon who is impacted and whether the change is 'Local level Change', 'Mid-level Change' or 'Large Change'. Regardless of as to whether the change is 'Local level Change', 'Mid-level Change' or 'Large Change', Appendix D requires the Respondent to detail the effect the change is likely to have on employees, considering the assessment criteria in clause 6.2.2.
20.2 Does the change proposed by the Respondent enliven consultation obligations?
[238] While the definition of 'Materially Impact' in clause 2.4.3 of the Agreement is not exhaustive, it provides a good starting point for consideration of the change and provides an indication as to the types of impacts that the parties have agreed 'Materially Impact" employees.
[239] There is no evidence that the community battery installation project will result in:
[240] Questions remain as to whether the change will result in:
[241] While I have decided to make orders concerning the qualification and experience requirements for undertaking commissioning and testing of community batteries, the consultation dispute relates to the Respondent's proposed changes. In this regard, I do not consider that the community battery installation project results in a change that will result in a major change to the skills required of employees. While awareness training specific to the community batteries has been provided, I do not consider that training of this nature constitutes 'retraining' of the nature contemplated by clause 2.4.3. To the extent that the Respondent needs to comply with the Commission's orders regarding commissioning and testing of community batteries, most EFMs will already have experience working with the Respondent and have one of the following qualifications:
[242] The Respondent can choose to either limit the EFMs to those who have UEE30820 Certificate III in Electrotechnology Electrician qualification or require that an EFM with the UEE33020 Certificate III in Electrical Fitting qualification undertake an additional module. I do not consider that this will result in a major change to the skills required of employees. I do not otherwise consider that the community battery installation project results in a change that will 'Materially Impact' employees as defined in the Agreement. I therefore decline to order that the Respondent produce further information.
[243] Had I found that the change was a change that 'Materially Impacts' employees, regardless as to whether such a change was a 'Local level Change', 'Mid-level Change' or 'Large Change', the consultation process in Appendix D of the Agreement would have required the Respondent to provide information about the change and the expected impact of the change (other than confidential or commercially sensitive information) to the employees. The Applicant had sought information about:
EcoJoule (EcoStore) Low Voltage Pole Battery Manual
This manual documents the design, installation, operation, maintenance, commissioning and emergency response requirements for the low voltage EcoJoule (EcoSTORE) pole battery system
Rolls Royce (MTU) Low Voltage Ground Battery Manual
This manual documents the design, installation, operation, maintenance, commissioning and emergency response requirements for the low voltage Rolls Royce (MTU) ground battery system
This manual documents the design, installation, operation, maintenance, commissioning and emergency response requirements for the low voltage Xolta (BAT-79) ground battery system
Pixii (PowerShaper) Low Voltage Gorup Battery Manual
This manual documents the design, installation, operation, maintenance, commissioning and emergency response requirements for the low voltage Pixii (PowerShaper) ground battery system
SDI 120 Am 4 - Testing and commissioning for distribution system
This standard has been amended to include pre-commissioning inspections and tests for low voltage ground batteries, pole batteries and STATCOMs
This safe work method statement describes the work practises required for the installation and management of low voltage ground batteries
This safe work method statement describes the work practises required for the installation and management of low voltage pole batteries
Storage and Transportation of Low Voltage Network and Community Batteries Manual
This manual documents the requirements for storage and transport of a network and community batteries
This manual document the design, installation, operation, maintenance commissioning and emergency response requirements for the low voltage EcoJoule (EcoVAR) pole STATCOM system
This safe work method statement describes the work practises required for the installation and management of low voltage STATCOMs
[246] Mr Messer said at this stage there were also a number of documents specific to the community batteries initiative that had been distributed but were under review and feedback processes with relevant workers, including:
[248] As referred to above, I have decided to make limited orders and recommendations.
[249] In particular I order that commissioning and testing of community batteries only be carried out by workers other than licensed electricians if those workers:
[250] Further, I recommend that unlicensed workers commissioning and testing community batteries be required to have at least the first three occasions of those commissioning and testing activities supervised by a person who holds the UEE30820 Certificate III in Electrotechnology Electrician qualification (being the qualification generally required for a licence) or qualification deemed to be equivalent by ASQA, and who has 12 months relevant experience, whether this be:
[251] While the orders I have made are in more limited terms than those sought by the Applicant, I accept that the Applicant has a legitimate interest in the safety of the workers it represents and during these proceedings has identified certain hazards associated with the installation of community batteries. The Applicant has indicated that despite the materials that workers have access to and participation in the awareness sessions, employees have expressed some discomfort about the installation task. Noting the Respondent's consultation duty under work health and safety laws, it is recommended that the Respondent continue to consult with workers about the health and safety concerns raised by the Applicant during these proceedings and ways to eliminate or minimise identified risks the workers remain concerned about.
[3] Johnson Statement at [1] and [3].
[8] Applicant's Application, response to q. 2.1.
[10] Applicant's Submissions at [21].
[11] Johnson Statement at [24] - [25].
[13] Applicant's Submissions at [26].
[14] Respondent's Submissions at [12].
[16] Respondent's Submissions at [12].
[17] Respondent's Submissions at [14].
[18] Respondent's Submissions at [14].
[19] Respondent's Submissions at [17].
[20] Respondent's Submissions at [9].
[21] Respondent's Submissions at [10].
[22] Respondent's Submissions at [11].
[26] Respondent's Submissions at [7].
[28] Applicant's submissions at [7]; Johnson Statement at [5].
[46] Messer Statement at [13]; Thornton Statement at [12].
[53] Shanahan Statement, Attachment KS-1.
[59] Messer Statement, Attachment JM-2.
[66] Respondent's Submissions at [15].
[78] Thornton Statement, Attachment MT-1.
[79] Thornton Statement, Attachment MT-1.
[84] Applicant's Further Submissions; Koot Further Witness Statement, Annexure TK10; Respondent's Further Submissions at [1].
[85] Thortnon Further Statement at [11].
[86] Thornton Further Statement at [12].
[91] Thornton Further Statement at [17].
[109] Johnson Reply Statement at [11].
[110] Johnson Reply Statement at [11].
[112] Koot Further Statement at [12].
[113] Thornton Further Statement at [16].
[133] Respondent's submissions at [6].
[144] Thornton Further Statement at [14].
[145] Thornton Further Statement at [17].
[146] Koot Further Statement at [5] - [6].
[147] Koot Further Statement at [7].
[148] Thornton Further Statement at [13].
[149] Thornton Further Statement at [14].
[150] Thornton Further Statement at [14].
[151] Thornton Further Statement at [16].
[152] Thornton Further Statement at [16].
[153] Applicant's Submissions at [7].
[154] Thronton Further Statement at [5].
[156] Thornton Further Statement at [4].
[162] Thornton Statement at [10], Thornton Further Statement at [3].
[165] Thornton Statement at [11]; Thornton Further Statement at [4].
[171] Koot Reply Statement at [14], Annexure TK3.
[172] Koot Reply Statement at [15], Annexure TK4.
[173] Koot Reply Statement at [16], Annexure TK5.
[175] Thornton Further Statement at [15].
[176] Thornton Statement at [28] - [29].
[184] Johnson Statement at [13] - [14], Annexures PJ1, PJ1a, PJ1b, PJ1c, PJ1d, PJ1e, PJ1f, PJ1g, PJ1h, PJ1h, PJ1i, PJ2, PJ2a, PJ2b, PJ2c, PJ2c, PJ2d, PJ2e.
[185] Johnson Reply Statement at [7].
[186] Koort Further Statement, Annexure TK-11.
[187] Applicant's Submissions at [8].
[192] Johnson Statement at [12], Johnson Statement at [7].
[199] Johnson Reply Statement at [6].
[201] Thornton Statement at [13]; Thornton Further Statement at [6]/
[204] Koot Reply Statement at [30], Annexure TK6.
[205] Koot Reply Statement at [32], Annexure TK7.
[206] Koot Reply Statement at [24], Annexure TK8.
[207] Koot Reply Statement at [24], Annexure TK8.
[208] Respondent's Submissions at [3].
[209] Respondent's Submissions at [3].
[216] Johnson Reply Statement at [13].
[217] Messer Statement at [6], [36]; Shanahan Statement at [6].
[222] Respondent's Submissions at [4].
[228] Koot Reply Statement at [8], Annexure TK9, p.23.
[229] Koot Reply Statement at [37], Annexure TK9, p. 23.
[232] Applicant's Submissions at [22].
[236] Johnson Reply Statement at [9].
[239] Respondent's Submissions at [15].
[245] Thornton Further Statement at [17].
[246] Thornton Further Statement at [16].
[251] Koot Reply Statement at [16], Annexure TK5.
[253] Thornton Further Statement at [15].
[254] Koot Reply Statement at [8], Annexure TK9.
[261] Messer Statement at [38]; Messer Statement, Annexure JM-4.
[262] Johnson Reply Statement at [7].
[264] Thornton Statement at [13]; Thornton Further Statement at [6]/
[265] Thornton Further Statement at [14].
[267] Applicant's Submissions at [5].
[268] Applicant's Submissions at [24].
[276] Applicant's Submissions at [9].
[277] Respondent's Submissions at [9].
[278] Respondent's Submissions at [10].
[280] Thornton Further Statement at [16].
[281] Respondent's Submissions at [14].
[290] Messer Statement, Attachment JM1.
[291] Messer Statement, Attachment JM1.
[292] Messer Statement, Attachment JM1.
[294] Respondent's Submissions at [16].
Printed by authority of the Commonwealth Government Printer
Communications, Electrical, Electronic, Energy, Information, Postal, Plumbing and Allied Services Union of Australia
Endeavour Energy Network Management Pty Ltd Trading AS Endeavour Energy [2026] FWC 166