Original judgment source is linked above.
(a) First, because the magistrate erred in finding that a change made by Technip to the safety case was a significant change that required the National Offshore Petroleum Safety and Environmental Management Authority's (NOPSEMA) approval to be valid and effective and that approval was not sought.
(b) Second, on the basis of the evidence adduced at trial, the appellant could not establish beyond reasonable doubt that Technip was reckless.
safety management system, for a facility, means a system for managing occupational health and safety at the facility.
(a) a detailed description of the facility and the activities to be undertaken at the facility;[7]
(b) a detailed description of the 'formal safety assessment' for the facility being an assessment that:[8]
(i) identifies all hazards having the potential to cause a major accident event; and
(ii) is a detailed and systematic assessment of the risk associated with each of those hazards, including the likelihood and consequences of each potential major accident event; and
(iii) identifies the technical and other control measures that are necessary to reduce that risk to a level that is as low as reasonably practicable.[9]
(c) a detailed description of the safety management system that, among other matters, provides for the reduction to a level that is 'as low as reasonably practicable' of risks to health and safety of persons at or near the facility including, but not limited to risks arising during evacuation, escape and rescue in case of emergency.[10]
(a) Because the divers were living in a saturation environment the measures for their protection included a Self-Propelled Hyperbaric Lifeboat (SPHL) located on the deck of the Wellservicer. A SPHL is a lifeboat designed to keep divers in a saturation environment in the event that they are required to evacuate. Assuming proper functioning, the SPHL is capable of providing 'autonomous life support for a minimum period of 72 hours without outside assistance'.[25] The magistrate described the SPHL as a 'sophisticated vessel with back up capacities in the event of an equipment failure'.
(b) Additionally the Safety Case for the Wellservicer required that during a saturation diving operation there should be a hyperbaric support vessel (HSV),[26] and that this vessel be equipped with a Life Support Package (LSP) (described by the magistrate as a 'container like structure'). As will be seen, the purpose of the LSP was to provide life support to divers in the event of operational failure of the SPHL and to provide life support in the event that the SPHL was recovered onto the deck of the HSV.
In accordance with the [Quality Health and Safety] policy, Technip aims to provide a safe workplace and reduce the health impacts of its operations through effective control of risks. The purpose of the risk management process is to ensure that all foreseeable hazards are identified and adequately controlled and the associated risks reduced to ALARP.
Once a hazard is identified, the risk shall be assessed using the Technip HSE Criticality Matrix (Appendix G - Risk Matrix). The HSE Criticality Matrix consists of a Severity Table, Probability Table and 5x5 Risk Ranking Table. The assessed levels of severity and probability are cross-referenced on the Risk Ranking Table to assess the level of Risk - Low, Medium or High.
With respect to hazard control and mitigation, the principle of hierarchy of controls is applied. That is, the preferred, most effective option in descending order to least preferred, less effective. Hazard controls shall consider, in preferred order:
- Time to muster divers into SPHL launch and recovery SPHL to HSV** > Diving emergency - hyperbaric evacuation
The Hyperbaric Evacuation Plan also sets out details of the Life Support Package, Hyperbaric Support Vessel, and Hyperbaric Reception Facility.
In the event of an emergency that requires hyperbaric evacuation, the base case is that once the divers are safely secured in the SPHL, the SPHL, shall be launched.
The SPHL shall be joined by the Hyperbaric Support Vessel (HSV) that will be in the vicinity at all times of diving operations. Should the weather be favourable and it is deemed that a recovery lift shall not pose an unacceptable risk to the personnel in the SPHL, the SPHL shall be recovered to the HSV. Recovery shall only be conducted with the HSV Master's approval/discretion in consultation with the SPHL coxswain.
Should recovery to the HSV be considered an unacceptable risk to the personnel in the SPHL, the SPHL shall be taken under tow or escorted and manoeuvred under its own power to either a safe haven or direct to port.
Once safely alongside the port facility, the SPHL shall be lifted out of the water and taken to the Hyperbaric Reception Facility (HRF). The SPHL shall be mated to the HRF and diver safely decompressed. For further details of hyperbaric evacuation referred to the project specific Hyperbaric Evacuation Plan.
Change, whether small or large is inevitable, and may impact upon the safe operation of the work scope. Management of change (MOC) is carried out in accordance with TPO's Offshore/Site Management of Change and Off-Site Management of Change. These procedures provide the process to ensure that all changes are properly engineered, checked and risk assessed. Any new hazards are properly controlled and mitigated in accordance with risk reduction principles. The MOC process requires the authorisation of senior project in offshore management.
The objective of the MOC process is to ensure that additional risks are not introduced by changes which could increase the risk of harm to personnel onboard.
The Technip MOC process applies to all marine and project activities.
The purpose of the Formal Safety Assessment (FSA) is to demonstrate that, particularly in relation to potential Major Accident Events (MAEs), all reasonably practicable controls have been identified in order to ensure that risk is reduced to ALARP. The implementation and on-going management of these controls is covered by the Safety Management System...
The FSA has been performed in accordance with the OPGGSA, the OPGGSSR and the SMS requirements (refer to Part C). The FSA includes the activities listed in Table 40 below.
4.16 MAE 15: SPHL operation failure
4.16.1 Event Description
Once the saturation divers have evacuated into the SPHL and the hyperbaric lifeboat has been launched, there is a potential for a failure of the SPHL during its operation. This event has the potential for injuries or fatalities to divers. The potential causes for SPHL failure could be mechanical, chamber system including Life Support Package (LSP) failure, adverse weather or operator error.
4.16.2 Prevention and Mitigation Controls
The risk of injuries or fatalities to divers due to SPHL operation failure has been minimised by both engineering and procedural controls.
The vessel dive system, including the SPHL is subject to Dive System FMECA, annual Dive System audits by a third-party, in accordance with vessel assurance processes. In addition, the SPHL must be launched to meet Class requirements at a minimum of 3 monthly intervals, and also to demonstrate functionality and increase crew familiarisation.
In addition, the LSP package is designed to IMCA D024 Rev 2. A stricken SPHL would 'hook up' to the package and be provided continued, conditioned water for use with the hyperbaric conditioning units (HCU), gas by way of main supply, BIBS supply and oxygen make up supply. Electricity is also supplied by the LSP.
While the LSP provides these resources, it is not independent as it requires electrical power and HP stored gases. Support hoses, regulators and a purpose made 75 m umbilical are all provided as part of the LSP.
Once the divers are safely locked into the SPHL, they are required to wear PPE and seat belts inside the lifeboat. This is to prevent injuries from unforeseen lifeboat movement, heave during launch, transit and recovery.
A key mitigation for SPHL failure is the project specific hyperbaric evacuation procedure. The procedure, subject to HAZID processes, describes the planning, preparation, steps and trials associated with moving the SPHL safely from the Wellservicer to HRF, located in a nearby port location.
The base case for hyperbaric evacuation is that, should the weather conditions be acceptable and with, in consultation with the SPHL coxswain, the HSV Master's approval/discretion, the SPHL may be lifted onto a purpose-built cradle on the back deck of the HSV. Once the SPHL is safely out of the water and secured into the cradle on the vessel, the LSP is to be connected and systems confirmed, the HSV will transit to the HRF that will be located in a port. Diver's well-being and the SPHL system can be continuously monitored during the transit by the LSTs. Once the SPHL is confirmed locked on the HRS, the divers are transferred into the HRF chambers where decompression will commence.
As part of offshore readiness trials, the SPHL will be mated to the HRF prior to any diving operations commence. Refer to Part C SMS for further details of hyperbaric evacuation.
Other key prevention and mitigation measures include:
The MAE Bowtie Diagram (Appendix 1 - MAE Bowtie diagrams) presents the potential causes and consequences of the event with all of the identified prevention and mitigation barriers/controls (Appendix H - Hazard Register). The bowtie diagram shows that sufficient barriers are in place.
A SPHL failure with divers in saturation has the potential to delay evacuation of the SPHL to the HRF and for injuries and fatalities to saturation divers. An assessment of the escape, evacuation and rescue facilities is included in the EER Assessment (Part D, Section 5). An assessment of the survivability of Safety Critical Elements (SCE) is included in the ESSA (Part D, Section 6). The risks associated with this event are quantified in the QRA (Part D, Section 7).
Given acceptable weather conditions, and with, in consultation with the SPHL coxswain, the HSV Master's approval/discretion, the SPHL shall be lifted onto a purpose-built cradle on the back deck of the HSV.
Once the SPHL is out of the water, safely secured on the vessel, the LSP is to be connected and systems confirmed, the HSV will transit to the HRS that will be located in a nearby port.
If conditions are deemed as presenting an unacceptable risk, the HSV is to provide support to SPHL during transit to safe haven/port and HRF.
There is little historical data on SPHL operational failure incidents with divers in saturation. Technip QHSE database synergi has no records of such incidents and similarly IMCA records do not provide data of SPHL operational failures with divers on board SPHL.
The Wellservicer is Dive Systems [sic] is subject to annual 3rd Party audits to IMCA Guidelines, vessel assurance processes and extensive planned maintenance and inspections which include the SPHL. In addition, the LSP is designed to IMCA D 024. The SPHL is subject to (max) 3 monthly launch, testing and recovery trials. Should a hyperbaric evacuation incident occur it is assumed that the SPHL has successfully launched and the HSV is on station to provide immediate assistance. In addition, the fully functional LSP is on-board the HSV with sufficient time to render assistance to SPHL and any operational failure or problem. Given the engineering and procedural controls in place and checks, the assumption is that an incident when the SPHL operation failure results in a diver fatality is a very low likelihood.
Bowtie diagrams have been developed for the Wellservicer MAEs and are presented in appendix I - MAE Bowtie diagrams. The bowtie diagrams provide a visual demonstration of the way in which risks are managed, allowing understanding at all levels and giving personnel the opportunity to review the controls in place and identify any gaps and potential improvements.
The bowtie diagrams present typical cause scenarios on the pre-event side (left side) while credible consequences are presented on the post‑event side (right side). The pre-event and post-event control measures (prevention and mitigation barriers) are included as shown in the bowtie diagram schematic in figure 26.
(b) Remote Diving Doctor Emergency Medical Support;
(d) Hyperbaric Emergency Plan and Project Emergency Procedure & [illegible]; and
One of the main objectives of the [Regulations] is to ensure that the risks to Health and Safety of people at offshore facilities are reduced to a level that is ALARP.
The adopted control measures for any particular identified MAE must be shown to collectively eliminate, or reduce the risk to Health and Safety to a level that is ALARP. According to the Regulations, evidence of reduction of safety risks to ALARP is achieved by the steps shown in Table 71.
The format of table 71 was three columns. In the left column the text of the relevant regulation was reproduced. In the centre column the requirement of the regulation was stated and in the right column the place in the Safety Case where the requirement of the regulations was addressed was identified. Opposite the requirement of reg 2.5(3)(e), (the regulation which required a detailed description of the safety management system that provides evidence the system provides for the reduction to a level that is as low as reasonably practicable of risks to health and safety of persons at or near the facility including, but not limited to risks arising during evacuation, escape and rescue in case of emergency), the reference in the assessment column read 'This is covered in the EER Assessment (Part D, Section 5.5)'.
During the diving operations phase involving the Wellservicer the North Sea Atlantic will act as the Hyperbaric Rescue Vessel (HRV) and shall stay within the field during DSV operations at the WP. If due to operational or mechanical breakdown reasons, where the North Sea Atlantic cannot act as the HRV, then an infield tug will take receipt of the LSP and will act as the HRV at that time. Please refer to the Hyperbaric Evacuation Plan [16] for full details.
The purpose of this document is to detail the procedure to be followed by TPO in the event of a vessel emergency on board the Wellservicer which requires launch, transit and reception of the SPHL at the Hyperbaric Reception Facility. The process described within this plan aims to reduce risk to all personnel involved in the activities described to ALARP and to meet or exceed the requirements of IMCA D 052 Rev 2 and other codes/standards as described in the document. Any such response action can be divided into four main phases:
... The LSP will be transported, installed and commissioned on the HCV North Sea Atlantic or other suitable vessel nominated and approved by CVX as the attendant HRV for the Wellservicer.
The North Sea Atlantic (NSA) will act as the primary Hyperbaric Support Vessel (HRV) for the Wellservicer during diving operations on the project when she is also in field. The NSA will remain in the project field during diving operations when she is the nominated HRV. If due to operational reasons the NSA cannot act as the HRV (such as returning to port for interim mobilisation) then an infield tug will be identified and act in this capacity including carrying the LSP.
The Life Support Package (LSP) will be positioned and sea fastened on the HRV back deck. The LSP will be installed in a position close to power outlets to enable the system to be run. The area around the LSP shall be maintained and kept clear of congestion at all times.
The LSP will be connected to the NSA services and function tested when first loaded onto the NSA. The LSP will be operated by the LSS from the SPHL. If it needs to be used to supply servicers [sic] to the SPHL.
The HRV will remain within 4 hours transit time of the DSV when divers are in saturation where practical.
Emergencies on-board the HRV will be dealt with in accordance with HRV subcontractor procedures. However, if an emergency arises where the HRV must return to port, then the Wellservicer Master must be informed, upon which the divers will be recovered and arrangements to maintain the agreed transit limit will be established. Alternatively if possible the LSP and gas will be transferred to an alternative vessel which will then act as the HRV.
6.2 Phase 2 - SPHL Transit, Support & Recovery
Once the SPHL is clear of the Wellservicer the hyperbaric emergency enters the second phrase - support of the SPHL and its occupants and its transit to the HRF for decompression. The launch of any SPHL would be considered a major incident and would immediately trigger the call out of the onshore Emergency Response Team (ERT) in accordance with Technip company procedures.
If they are in a position to do so, the Master and OCM will assist with this phase of the evacuation, however as the incident that results in the SPHL being launched may well incapacitate the Wellservicer, it is anticipated that the HRV, with support of the onshore ERT, will play a major role in facilitating the transit, support and recovery of the SPHL to the HRF.
This phase of the evacuation contains the most variables and therefore is the phase that will require the most attention during the execution. The following options in preference shall be considered:
If HRV equipped with suitable crane;
These options are detailed in the flow chart shown in figure 6-2 below.
(Flow chart not reproduced)
At all times the LSP will be held on the HRV such that if the SPHL requires gas, cooling or heating this can be supplied. Note that the Wellservicers SPHL has 72 hours endurance so the LSP is a back up and should not have to be used as a base case while the SPHL is in the water. As the distance from the field to Dampier is 98nm, at 5kts the journey time would be approximately 20 hours, or 28% of total endurance which is well within the requirements of IMCA D052. The LSP should only be connected in sheltered waters (if the SPHL is in the water) however if the SPHL is taken out of the water the LSP has to be connected such that cooling can be supplied.
Note - SPHL is fitted with a 75 m dynema tow line complete with spliced hard eye which is passed to the HRV if towing is required.
The SPHL shall have its own on-board navigation equipment. In the event of a breakdown of the engine of the SPHL, the HRV will attach a towline and tow the SPHL to the HRF port in Dampier.
The HRV will advise any other vessels which transit within 5nm, that a SPHL is being escorted to Dampier, and that all other vessels are required to maintain minimum 2nm clearance. The HRV will maintain radio contact with Dampier Port Authority (VHF 11) advising progress and ETA of the SPHL. The HRV will maintain contact with the TPO ERT, advising ETA of the SPHL in Dampier. The TPO ERT will advise the HRF Manager in Dampier and COMPANY ERT.
In view of our discussion yesterday, I advise you that should the Hyperbaric Support Vessel 'The North Sea Atlantic' leave the close proximity of the DSV during diving operations, this would be considered a non-compliance of the Wellservicer Safety Case ...
Consequently, Technip Oceania Pty Ltd would not be compliant with OPGGS(S) 2009 Reg 2.45 (g).
Should Technip Oceania Pty Ltd wish to amend the Wellservicer safety case to provide for other emergency hyperbaric arrangements, a formal revision of the Wellservicer safety case would be required.
It was noted in the discussion that the proposed replacement HSV tug 'Shelf Supporter' does not provide the capabilities or safety critical equipment as described in the Wellservicer safety case.
...
Thanks for the below, it is noted. As discussed in yesterday's meeting, Technip have raised a Management of Change (attached to this email) to capture keeping the LSP on the NSA as an improvement in the ALARP condition described in the Rev 0 DPP and Hyperbaric Evacuation Plan while operating on the Wheatstone project.
Please note that the NSA is planned to conduct 1 x interim mobilisation while the Wellservicer is engaged in spool installation and diving operations. The duration of this mobilisation equals to less than 2% of the total duration of the offshore campaign.
The likelihood of an SPHL emergency during NSA mobilisation is remote and the level of risk to personnel (divers) is considered acceptable and ALARP as described in the attached MOC... Transferring and commissioning the LSP offshore from the North Sea Atlantic to the Mermaid Supporter during this interim mobilisation is considered to be introducing a new risk and unnecessary risk - potential damage to LSP.
(a) the Safety Case required that the HSV - with the LSP on board - to be no less than two hours away from the Wellservicer while saturation diving was taking place;
(b) between 22 and 25 November 2015 saturation diving took place and the North Sea Atlantic with the LSP on board was more than two hours away from the Wellservicer;
(c) the Site Change Request Form did not effect a valid change to Safety Case, as the change proposed constituted a significant change to the safety management system, in that it entirely removed the control put in place to mitigate the risk identified in MAE 15 and the change had not been submitted to or accepted by NOPSEMA;
(d) thus the Barrow Island Rendezvous Plan described in the Site Change Request Form did not become part of the Safety Case in substitution for the requirement that the HSV be no less than two hours away from the Wellservicer; and
(e) the only rational inference was that Mr Seguela was aware that, by approving the Site Change Request Form knowing diving operations were going to be performed at the Wellservicer, there was a substantial risk that Technip would not be complying with the Safety Case during those diving operations because the effect of the change was to take the LSP away from the Wheatstone field - thus, Mr Seguela (and Technip) was reckless as to whether those operations were being conducted in a manner contrary to the approved Safety Case and it was unjustifiable for him to take the risk of undertaking the diving operations in contravention of the Safety Case.[56]
(a) the appellant had not established beyond reasonable doubt what constituted the safety management system;
(b) because the appellant had not established what constituted the safety management system it had not established beyond reasonable doubt - nor could it do so - that the Site Change Request Form significantly changed the safety management system;
(c) the Site Change Request Form effected a valid change to the safety management system and the Safety Case under the Management of Change process within the Safety Case with the result that the diving operations undertaken between 22 and 25 November 2015 were not undertaken in a manner contrary to the Safety Case;
(d) the appellant had failed to establish beyond reasonable doubt that Mr Seguela either knew that work was performed contrary to the Safety Case or that he was aware of a substantial risk that work would be undertaken contrary to the Safety Case, and that it was unjustifiable to take that risk.
(a) In the event of operational failure of the SPHL during an evacuation from the Wellservicer recourse to the LSP was vital - his Honour observed:[57]
In the scenario where the SPHL has failed and is in the water the life-saving gas and other necessities to maintain the diver's saturation can be supplied directly to the SPHL by means of an umbilical pipe from the deck of a HSV to the SPHL. Alternatively the SPHL can be lifted by crane onto the deck of the HSV where it can be attached to the LSP.
(b) There 'need not be a nominated HSV in a Safety Case' but a vessel will not be a hyperbaric support vessel if it does not have an LSP on board.
(b) the passage in the Quantitative Risk Assessment which recorded that should a hyperbaric evacuation incident occur it was assumed that 'the HSV is on station to provide immediate assistance';
(c) paragraph 4.16.2 of the Safety Case as revised by the Response Note; and,
(d) the 'SMS section 12.5.1' which introduced into the Safety Case the provision dealing with 'Diving Emergency - Hyperbaric Evacuation'.
I am therefore satisfied beyond a reasonable doubt that up until about 19 November 2015 NOPSEMA was reassured by the operators response that (HSV) 'will be in the vicinity at all times of diving operations'. I find this was at the time and remained an intrinsic part of the safety case. It is entirely inconsistent with an MAE that the HSV, in this case the NSA, would be up to 98 nautical miles away, clearly outside the Wheatstone Field zone.
What had been made clear from the responses of the operator was that the purpose-built cradle was no longer part of a base case but I find it could not be any clearer from the evidence that, in effect, it was 'non‑negotiable' that the HSV - and in that regard I'm referring to the only vessel with the LSP on board - must be in the vicinity of where the divers were working.
I find beyond reasonable doubt that the safety case had eventually been settled and that this occurred on 6 October 2015. Ultimately I find that therefore, and as a result of the information provided to NOPSEMA and accepted, the meaning of the safety case did not alter in regard to the requirements under that safety case for the HSV to be in the vicinity of the work from the Wellservicer and ready to provide immediate assistance in the event of a MAE. If it wasn't in the vicinity it would, I find, have no likelihood at all of providing that turnaround from SPHL to HSV.
The change made on 19 November 2015 was a significant departure from the safety case. Now there was every chance that in the event of an MAE the HSV would be well out of range of the SPHL leaving the SPHL with no access to the LSP. Instead the SPHL could find itself being towed into the lee of Barrow Island there to be at the mercy of the weather and time while waiting for the HSV to arrive with the LSP.
I have not overlooked the 72 hours capacity of the SPHL to maintain an appropriate saturation environment on board but I have found the plan set forth in the SCR to be a poor substitution for the immediacy that was previously settled and supported by the operator. On any view, I find, the immediate presence of an LSP at the site of an MAE was more than preferable but was essential to protect the divers from the exigencies likely to arise in such an event.
I am satisfied beyond reasonable doubt that the plan laid out in the SCRF was a significant change to the safety management system and therefore it was the operator's obligation to submit the change/revision to NOPSEMA.
I have had difficulty in regard to how one might approach the circumstances in this matter (the approval of a plan by a number of signatories including Mr Seguela that I have found was contrary to the Safety Case and contrary to r 2.30) from the perspective of then defining how that behaviour might be found, beyond reasonable doubt, to be reckless.
The element of awareness in the fault element of recklessness cannot be made out by the prosecution unless it is an awareness of a substantial risk. I find that there is insufficient evidence to support a conclusion that the implementation of the Barrow Island rendezvous plan created a substantial risk. I am conscious that my conclusions on that basis might be seen to be in conflict with my other findings in this matter but those findings are confined to the specific regulatory requirements and whether those regulatory requirements have been adhered to. Consideration of recklessness is altogether a separate and distinct element given the charge is not categorised by the Code as strict liability.
Not only was there insufficient evidence regarding substantial risk there was evidence of several back-ups on the SPHL to ensure cooling heating and access to gases, towing would be available from the Mermaid Supporter tug and time frames within which, while not consistent with the Safety Case, were likely to be adequate.
...
In terms of the degree of risk I find that the unanimous signing off on the SCRF gives some weight as to the foreseeable degree of risk. Nine of those signatories were divers and 3 others were involved in the diving on the project. The back-ups of the SPHL have also been referred to and the time frames and the availability of the Mermaid Supporter, at least, and the Wellservicer should towing be required. From the perspective of the evidence before me I would rate the degree of risk as low.
...
In so far as the practicability of eliminating risk; it was not impracticable to place a second LSP in the field so that the Safety Case could have been adhered to but a failure to do so would only support recklessness if the degree of risk was something higher than the low risk I have found.
The element of 'unjustifiable risk' is therefore not made out.
(1) A person is reckless with respect to a circumstance if:
(a) he or she is aware of a substantial risk that the circumstance exists or will exist; and
(b) having regard to the circumstances known to him or her, it is unjustifiable to take the risk.
The fault element of recklessness was to be applied to the circumstance that constituted the third physical element of the charged offence, namely that Technip was reckless that work was being performed in a manner contrary to the Safety Case approved by NOPSEMA. The Learned Magistrate erred by directing himself that recklessness required consideration of whether the implementation of the Management of Change Plan by Technip increased the risk to workers substantially and was therefore reckless.
The safety management system issue An overview of the parties' submissions
(a) There was an 'extremely low likelihood' of a MAE 15 occurring. It would only occur if all preventative controls, 'design and manufacture', and 'maintenance and testing' controls had failed and the primary power source and two back up power sources had failed.
(b) The Barrow Island Rendezvous Plan would only be relied on when the North Sea Atlantic was away from the Wheatstone field for the purposes of interim mobilisation which was estimated to be less than 2% of the duration of the diving programme.
(c) The assessment made by Technip as to whether the change was a significant change was made in the context of a risk assessment that involved a 'balancing exercise' that took into account the risks of damaging the LSP if transferred by crane at sea from North Sea Atlantic to the Mermaid Supporter.
(a) The Emergency System Performance Standards set out in Table 33 of the Safety Case - referred to in the primary decision at [64].
(b) The 'Diving Emergency - hyperbaric evacuation' section introduced into Part C of the Safety Case and the relevant provisions of the Hyperbaric Evacuation Plan - referred to in the primary decision at [60].
(c) The mitigation controls identified as a response to an MAE 15, in particular paragraph 4.16 of Part D of the Safety Case ‑ referred to in the primary decision at [56] and [58].
(d) The provisions of the Escape, Evacuation and Assessment section of Part D of the Safety Case, in particular par 5.3.6, which related to MAE 15 - referred to in the primary decision at [34].
(e) The Quantitive Risk Assessment, par 7.4.15 - referred to in the primary decision at [51].
(1) identify hazards having the potential to cause major accident events;
(2) provide a detailed assessment of the risks associated with the hazards; and
(3) identify the control measures necessary to reduce that risk to a level as low as reasonably practicable.
(a) Table 33 as amended - 'Time to muster divers into SPHL launch and recovery SPHL to HSV** < 2 hours' (** weather dependent ...);
(b) Diving Emergency - hyperbaric evacuation - '... The SPHL shall be joined by the Hyperbaric Support Vessel (HSV) that will be in the vicinity at all times of diving operations' (emphasis added);
(c) '4.16.2 Prevention and Mitigation Controls' - '... In addition, the LSP package is designed to IMCA D024 Rev 2. A stricken SPHL would 'hook up' to the package . ..';
(d) Quantitative Risk Assessment - '... Should a hyperbaric evacuation incident occur it is assumed that the SPHL has successfully launched and the HSV is on station to provide immediate assistance' (emphasis added); and,
(e) MAE 15 Bow-tie diagram - The inclusion of 'dedicated LSP on hyperbaric support vessel' as a mitigation control. In context, this must be understood as a reference to a dedicated LSP on a hyperbaric support vessel in the vicinity of the Wellservicer. Moreover, of the five mitigation controls identified in the Bow-tie diagram, this was the most important as, in the event of an operational failure of the SPHL, the immediate availability of the LSP was essential - none of the other mitigation controls were capable of preventing decompression of the divers.
(a) the controls referred to in Technip's submissions and in Mr Seguela's evidence were 'prevention controls' and not mitigation controls. In particular they were controls designed to prevent situations where the LSP would need to be utilised. In other words, they were not directed to the reduction of the risk to the safety of the divers if MAE 15 should occur - they were directed to the prevention of the occurrence of MAE 15. Having the LSP in the immediate vicinity of the diving operations did not reduce the risk of the SPHL failing completely - it was not a prevention control. Rather, requiring the LSP to be in the immediate vicinity of the diving operations was the measure put in place to mitigate or attenuate the risk to the lives of the divers in the event that the very low risk of a complete failure of the SPHL materialised.
(b) The Quantitative Risk Assessment of a MAE 15 recognised the risk was extremely low but nevertheless it is implicit in the Safety Case that Technip considered that the presence of the Hyperbaric Support Vessel with the LSP on board in the vicinity of the Wellservicer at all times was necessary to reduce the risk to as low a level as reasonably practicable. This is understandable given that the Safety Case identified the failure of the SPHL as an event having the potential to cause multiple fatalities to divers.
The recklessness issue An overview of the parties' submissions
(a) MAE 15 was part of the Safety Case and the control required to mitigate the risk was for the hyperbaric support vessel with the LSP to be in the vicinity of the SPHL. Technip knew the only real control to save the divers if MAE 15 occurred was to connect the SPHL to the LSP from a hyperbaric support vessel capable of providing immediate assistance. This was the control the Safety Case specified, and Technip knew this control represented the form in which the Safety Case had been approved by NOPSEMA. In short, the change abandoned the control required to mitigate the risk of MAE 15.
(b) The change purported to have been effected by the Site Request Change Form was based on an assumption that MAE 15 would not occur and the assumption was contrary to the Safety Case.
(c) Technip, through Mr Seguela, must have known the proposed change to the Safety Case, removing all control for an MAE 15, was a significant one requiring a revision to be submitted to NOPSEMA.
(d) Technip knew, and intended, diving was to take place during in a period where the North Sea Atlantic, and its LSP, were not in the vicinity of divers.
(1) Technip actually knew work was performed contrary to the Safety Case; or alternatively
(2) Technip was at least aware of a substantial risk work was being performed in a manner contrary to the approved Safety Case, and that it was unjustifiable for Technip to take the risk;
(3) Mr Seguela's denials of awareness of such a risk should be rejected.
(a) The SPHL had backup systems designed to keep it functioning. There was a backup generator, the Whisper generator, and if that failed there were batteries. The purpose of the batteries was not to propel the SPHL but to provide the essential services to the divers.[75]
(b) The risk of MAE 15 occurring was statistically assessed as being very low.[76]
(c) The 'critical' box on the Site Change Request Form was supposed to be ticked in circumstances where there was a potential for contravening laws or regulations in a management of change procedure. The 'critical' box was not ticked on the Site Change Request Form.[77]
(d) Mr Seguela thought Technip was working within its safety management system, making sure the risk of the change was assessed, and the changes made were actually reducing risk.[78]
(e) Having signed off on the Site Change Request Form Mr Seguela did not believe the respondent was 'doing anything wrong', and did not believe it was breaching the Safety Case.[79]
(f) Mr Seguela did not think if Technip allowed the divers to continue saturation diving while the North Sea Atlantic while the LSP was in Dampier there was any risk that it would be doing work in a manner that was contrary to the Safety Case.[80]
(g) Mr Seguela would not have signed the Site Change Request Form if he had thought there was a risk that the respondent would then be in breach of the Safety Case.[81]
(a) He has significant experience in offshore operations, and was very familiar with the risks of saturation diving activities. He explained that divers in saturation cannot evacuate in a standard lifeboat, as they must be maintained at pressure, and there is a risk they will die if they are not decompressed properly.[82]
(b) The MAEs in the Safety Case had been identified by Technip in its risk assessment process.[83]
(c) He agreed an event with a low probability of occurring could be an MAE because of its serious consequences, which is the reason why controls were to be put in place to reduce the risk to as low as reasonably practicable.[84]
(d) Whilst there was a low risk of a complete failure of the SPHL, it could happen.[85]
(e) The only effective remedy (to prevent loss of life) in the event of operational failure of the SPHL was to connect it to the LSP on board the hyperbaric support vessel.[86]
(g) He agreed the proposal in the Site Change Request Form assumed that the SPHL would be able to provide life support to divers (whilst on route to Barrow Island), and that the risk of its not being able to do so was not addressed in the proposal.[89]
(h) He knew diving had to comply with the Safety Case.[90]
(i) He said the reason the Hyperbaric Evacuation Plan had provided for the LSP to be transferred to the Mermaid Supporter if the North Sea Atlantic had to leave the field, was 'Because that was a commitment from the Safety Case. And we were trying to - we are complying with the Safety Case'.[91]
(a) The magistrate found the Site Change Request Form significantly changed the safety management system. Indeed, his Honour expressed his view that this was so in trenchant terms, referring to the change as a 'poor substitute' and being 'miles outside what was contemplated by the Safety Case'. The magistrate was presented with a situation in which Mr Seguela's subjective belief was substantially inconsistent with the objective fact as his Honour had found it to be. It would have been open to the magistrate to have formed the view that the inconsistency undermined the weight to be attached to Mr Seguela's evidence of his subjective belief and, on that basis, to have accepted the appellant's submission as to Mr Seguela's state of mind.
(b) Mr Seguela was giving evidence in December 2018 about his subjective understanding of the safety management system and the effect of the change to it as it was three years earlier in November 2015. In assessing the weight to be attached to Mr Seguela's evidence the magistrate would have been entitled to take into account the limitations of human memory and how subconscious reconstruction can affect recollection.
(c) In assessing the weight to be attached to Mr Seguela's evidence of his state of mind it would have been open to the magistrate to take into account that the majority of the questions asked to elicit Mr Seguela's evidence-in-chief about his state of mind were, as senior counsel for the appellant described them 'Dorothy Dixers', that is, closed questions that permitted 'yes or no' answers. The relevant passage in the evidence-in-chief was as follows:[92]
All right. Now, having signed off on [the Site Change Request Form], did you believe that Technip was doing anything wrong?---No.
Did you believe that Technip was breaching its Safety Case?
What did you think about the Safety Case in relation to the management of change procedure?---I thought the Safety Case was the overarching document and we were working within our safety management system which was detailed in the Safety Case and we were just making a change to the hyperbaric evacuation plan document and we were capturing that change and making sure the risk was assessed - the risk of the change was assessed.
Well, did you think there was any risk that if Technip continued to allow saturation diving occurring from the Wellservicer that - sorry, did you think there was any risk that if Technip allowed the divers to continue saturation diving while the NSA was in Dampier with the LSP, that Technip would be doing work in a manner that was contrary to the Safety Case?---No.
Why?---Because we working within our safety management system, our procedure. We did follow them and we were still working under the umbrella of the Safety Case which included those management - that management system and those tools we had to be able to implement some changes when those changes didn't increase the level of risk. It was the opposite. We were actually reducing the risks.
So by signing off on the form you knew that the diving would continue?---Yes.
And you did not think or were not aware of any risk that if that were to continue that Technip would be acting in some way contrary to its Safety Case?---No.
Would you have signed the exhibit 10, the site change request form, if you had thought that there was a risk that Technip would then be in breach of its Safety Case?---No, I wouldn't have signed if the - if I had thought there was any risk by that.
I certify that the preceding paragraph(s) comprise the reasons for decision of the Supreme Court of Western Australia.
[3] Offshore Petroleum and Greenhouse Gas Storage (Safety) Regulations 2009 (Cth) reg 1.4(1).
[7] Offshore Petroleum and Greenhouse Gas Storage (Safety) Regulations 2009 (Cth) reg 2.5(1).
[8] Offshore Petroleum and Greenhouse Gas Storage (Safety) Regulations 2009 (Cth) reg 2.5(2).
[9] The acronym ALARP is used to refer to the concept of 'as low as reasonably practical'.
[10] Offshore Petroleum and Greenhouse Gas Storage (Safety) Regulations 2009 (Cth) reg 2.5(3).
[13] Offshore Petroleum and Greenhouse Gas Storage (Safety) Regulations 2009 (Cth) reg 2.30(1)(d).
[24] Commonwealth of Australia v Technip Oceania Pty Ltd (Unreported, Magistrates Court of Western Australia, Case No PE 21352/2017, 12 April 2019) (Primary Decision).
[26] Referred to interchangeably as the Hyperbaric Rescue Vessel - the HRV.
[34] 'HRF' was the acronym for 'Hyperbaric Reception Facility'.
[36] The magistrate considered that the reference to 'SMS Section 12.5.1' was 'an obvious tabulation error' but found, in effect, that the section was included in the Safety Case, Primary Decision [61] - a finding not challenged on appeal. I am not persuaded that there was a tabulation error as the subject matter of the section introduced by the revision is an aspect of 'Emergency Preparedness & Response'.
[39] Trial exhibit P3, 201 - 202. The italicised portion indicates the amendment made by the Safety Case Response Note.
[61] Primary Decision [89] - [91], [95], [98] - [99].
[62] Criminal Code 1995 (Cth), s 5.6(2).
[66] Trial exhibits 3, 4, 10 and 11 respectively.
[68] Hope v Bathurst City Council [1980] HCA 16; (1980) 144 CLR 1, 7 (Mason J).
[72] Appellant's outline of written submissions, 31 October 2018, [50].
(1980) 144 CLR 1