[2019] ACAT 20
ACT Civil and Administrative Tribunal
2019-02-07
Senior Member J
Original judgment source is linked above.
CHESSELL & ANOR v REYNOLDS (Civil Dispute) [2019] ACAT 20
Catchwords: CIVIL DISPUTE - breach of contract - non-compliant product - general poor work - compensation - jurisdictional limit
Legislation cited: ACT Civil and Administrative Tribunal Act 2008 ss 18, 48
Australian Consumer Law
Subordinate
Legislation cited: Building (General) Regulation 2008 r 31
Cases cited: Robinson v Harman [1848] EngR 135; 154 E.R. 363 (1 January 1848)
List of
Texts/Papers cited: Australian Building Codes Board, Building Code of Australia (Australian Building Codes Board, 2016).
Standards Australia, Windows and external glazed doors in buildings (AS 2047-2014) (Standards Australia, 2014).
All Windows and Doors supplied by Ardglass Windows conform to all relevant Australian and European Standards. They are Double Glazed units with toughened Glass and internal beading for additional security. All windows are fitted with keyed alike window locks and all doors with minimum 3 point locking system.
The reports attached [for British standards] unfortunately have little relevance to AS2047 performance type testing that is required in Australia. There is no way to claim equivalence to our standards with the information in these reports.
I can find no evidence of pressure testing to Serviceability limits or Ultimate Strength. Without having the BS standards at hand ... there is no way of knowing how long the pressure was held while water testing at each level and at what flow rate the water was running. The air infiltration results are not comparable to our requirement...[6]
The Australian Window Association also notes that compliance with Australian Standard 2047 is a minimum mandatory requirement within the Australian building codes.[7]
(e) The report by Peak Consulting, and the oral evidence of Mr Pudja, the expert author of that report, concludes that the windows are not compliant with the relevant Australian Standards as there is no certification labels of this product by the Australian Standards for glazing. It is noted in the report that the author has examined Australian Standard 2047 and the product information provided by the windows' manufacturer.
the certification required for Australian [S]tandards compliance for windows in terms of the framing and the glazing, it's not just the framing and the glazing, but it's the rubber seals that are used whether or not they have adequate UV resistance. Our - the reason we have different Building Code requirements to say Europe is we have a harsher sun here and rubber that is not UV resistant tends to perish quicker here in Australia than it does in Europe, and so seals around windows and things - this is why - then apart from that glazing itself we have certain requirements for the glazing whether it's laminated or safety glass and how it will shatter, how it will perform if it's impacted, and this is why the Australian standards have their own requirements. So with a manufacturer that doesn't offer certification in Australia it's basically saying, "We've built this product, but it's not in compliance with your requirements", and fundamentally it shouldn't be then installed in an Australian building.[8]
MR REYNOLDS: So I didn't remove any flashings, and to install head flashings and sill flashings to a window that was never there, would that require a builder or would it require certification if bricks needed to be removed or whatever that process of installing the flashing would require?
Mr PUDJA: Installation of head and sill flashing in a retrospective matter usually it's not - it's not the sort of flashing you would put if it was a new window because to do that - because normal flashings in new construction that come - that are fitted to windows they're usually, you know, like a DBC type material that you can build into the brickwork and so forth. When you're doing it retrospectively you - what is expected is that you measure the opening and is - you manufacture a form [of] sub seal usually made of stainless steel or something like that to - to fit underneath the existing window frame which provides an upturn of the end and on the sides which is called dam ending to stop any water coming in through the sides or to bypass the frame in any way, you can do that at the head and the seal, and - and, yeah, depending on whether it's just a window or whether it's a sliding - [if] it's a sliding door than the threshold you done it it's - it's done in a similar way, and so that - that is what you would do. So if - if the flashing weren't present when the windows were removed well that's unusual and again that wouldn't have been approved that would have been an oversight and so a licensed builder installing - or anyone with any building knowledge installing windows afterwards would have taken that on board and said, "Okay, well I need to provide something even if it's not there".[14]
you wouldn't do a job without it, if you know what I mean, and that's why it's fundamentally flawed, that the installation is fundamentally flawed because they just haven't observed to those basic things [that] are taught to every person who does window to installation. You're just taught that in carpentry in 101 how to fit a window and it's just - if you don't do it it's just - well it's just not good enough.[16]
Because the general nature of the defects both external and internal revolve around the defective installation and non-compliance with Australian standards and relevant building codes, along with the poor quality of workmanship associated with various parts of the installation, rectification of these defective works would require removal and reinstallation of all the windows and doors.[17]
What is the appropriate remedy for the breach of contract?
noting that the amounts in paragraphs (b) and (c) above are costs awarded to the applicants under section 48(2) of the ACT Civil and Administrative Tribunal Act 2008.
this total being reduced to $25,000, being the jurisdictional limit that can be claimed in relation to a civil dispute application,[19] plus:
(b) the Tribunal filing fee of $150; plus
(c) the cost of the Peak Consulting report being $660;
noting that the amounts in paragraphs (b) and (c) above are costs awarded to the applicants under section 48(2) of the ACT Civil and Administrative Tribunal Act 2008.
[2] Building Regulation regulation 31(b)
[3] Building Regulation regulation 31(c)
[4] Report of C&M Brennan Management Services Pty Ltd trading as CMB Management 9 April 2018 [1.3]
[5] Report of C&M Brennan Management Services Pty Ltd trading as CMB Management 9 April 2018 [3.8]
[6] Email from Executive Director and CEO Australian Window Association to respondent and ACT Fair Trading (Access Canberra) 13 December 2017
[7] Email from Executive Director and CEO Australian Window Association to respondent and ACT Fair Trading (Access Canberra) 12 December 2017
[8] Transcript of proceedings 2 November 2018 pages 36-37
[9] Transcript of proceedings 2 November 2018 page 39, line 20
[10] Peak Consulting, Special Purpose Inspection Window Installation Opinion/Report (Peak Consulting report) 5 June 2017 page 7
[11] Peak Consulting report 5 June 2017 page 7
[12] Peak Consulting report 5 June 2017 page 8
[13] Peak Consulting report 5 June 2017 page 8
[14] Transcript of proceedings 2 November 2018 pages 44-45
[15] Transcript of proceedings 2 November 2018 page 87
[16] Transcript of proceedings 2 November 2018 pages 87-88
[17] Peak Consulting, Special Purpose Inspection Window Installation Opinion/Report 5 June 2017 page 6, [7.2]
[18] Robinson v Harman [1848] EngR 135; 154 E.R. 363 (1 January 1848)
[19] ACT Civil and Administrative Tribunal Act 2008 s 18
CHESSELL & ANOR
REYNOLDS