The review of the available evidence, including journal articles, surveys, literature reviews and government reports, supports the statement that: There are no direct pathological effects from wind farms and that any potential impacts on humans can be minimised by following existing planning guidelines.
It was thought that the review would be completed within the following six months.
[15] Town planning is not a panacea for all perceived social ills, nor is planning decision-making a forum for addressing all issues of social or community concern. At its heart, planning is about the use, development and protection of land. It has a spatial context that is primarily concerned with the fair, orderly, economic and sustainable use and development of land. Town planning does not involve itself in moral judgements nor, subject to this locational or spatial perspective, in the operation of a competitive market economy in which certain goods and services are lawfully made, sold or consumed. Whilst town planning seeks to secure a pleasant, efficient and safe working, living and recreational environment, it is not the role of town planning to address all issues of public health, nor to regulate the pricing or general availability of a product to manage the health and well being of a society.
[16] It follows, for example, that it is not the role of a planning decision-maker to consider the broader impacts on society of obesity, when making a decision about the development of land for a particular fast food outlet. The Tribunal has held that it is not its role to consider the potential health effects of electromagnetic radiation from a telecommunications facility that otherwise complies with relevant Australian safety standards, and a planning decision-maker should not pioneer its own separate standards. Similarly, therefore, it is not the role of a planning decision-maker to consider the broader impacts of the abuse or misuse of alcohol in a society, or to pioneer its own standards about the accessibility of alcohol generally in the community, when making a decision about the use or development of land for a liquor outlet. These are all relevant societal concerns, but they are not necessarily relevant planning considerations to a particular statutory planning decision at a local level.
On Thursday 22 August 2013 the Commission met with the NSW Health representatives Professor Wayne Smith, Director Environmental Health Branch and Dr Jeremy McAnulty, Director Health Protection in NSW. NSW Health was very clear in its advice, which is consistent with that of the National Health and Medical Research Council - that there is no published scientific evidence to link wind turbines with adverse health affects.
NSW Health also made it clear that noise levels at distances of more than one km from the turbines would not cause health impacts and the 2 km buffer provided in this instance is highly precautionary. The Commission has accepted the advice of NSW Health, noting it is consistent with that of other health authorities, such as the Victorian Department of Health, and is satisfied that the proposal does not represent a health risk to the local community, including those at the correctional centre.
In summary NSW Health noted that some noise and associated health impacts could be expected in close proximity to wind turbines, but that the 2 km buffer distance provided in this instance was considered to be very conservative and precautionary from a health perspective. The Public Statement from the National Health and Medical Research Council is still in place and NSW Health is not aware of any evidence that would call for a change to this advice (that there is no published scientific evidence to positively link wind turbines with adverse health effects).
Some people claim that infrasound may affect health even at an inaudible level. It has been suggested that infrasound can be detected by mechanisms other than hearing, such as touch, vibration and effects on the vestibular system.
However, the available evidence does not support claims that inaudible sounds can have direct physiological effects. Physiological effects on humans have only been detected at levels that are easily audible.
There is no evidence that sound which is at inaudible levels can have a physiological affect on the human body. This is the case for sound at any frequency including infrasound.
... The Tribunal is obliged to apply the relevant regulatory standards as it finds them, not to pioneer standards of its own. The creation of new standards is a matter for other authorities. ...
With respect to health hazards of electro-magnetic radiation from mobile phone tower installations, the Tribunal held that whilst the objectors beliefs were sincerely held, the Tribunal is obliged to apply the relevant regulatory standards as it finds them, not to pioneer standards of its own. The creation of new standards is a matter for other authorities.[4] This principle has been followed in numerous other decisions wherein the Tribunal has found that a telecommunications facility is obliged to meet the relevant standards that apply but it is not a basis to reject an application for reasons relating to potential health impacts if the relevant standards are met.[5]
See also Hutchinson 3G Australia Pty Ltd v City of Casey (2002) VCAT 247 and Marshall and Gangur v Ararat Rural City Council & NBN Co Ltd [2013] VCAT 90.
- The paper submitted by the Waubra Foundation entitled Acoustic Noise Associated with the MOD-1 Wind Turbine: Its Source, Impact and Control by M D Kelley and others states (at para 1.2.1):
It is important, first, to place the MOD-1 noise situation in the proper perspective. The nature of the complaint generally did not change materially from the earliest to the latest reports received, and the total number of families known to be affected did not increase above the dozen identified within the first few months, even though more than 1000 families lived within a 3-km radius of the turbine installation.
- The same paper poses the question at para 9.4 "Why were some families annoyed more often than others and why did the situation confine itself to such a small fraction of the overall population living within 3km of the machine? ... The small population fraction bothered by the turbine happened to live in locations where a combination of terrain and refractive focusing reached maximums, or caustics, a good portion of the time."
- The paper presented by Paul Schoner and others at the 5th International Conference on Wind Turbine Noise held in Denver in August 2013, also submitted by the Waubra Foundation, states:
For at least four decades there have been reports in the scientific literature of people being made ill by low-frequency sound and infrasound (Dawson 1982; Tesarz 1997).
Currently, the same problems are appearing in the vicinity of wind farms, and as in 1982 and earlier, nobody understands how these problems come to be; nobody understands why only a fraction of the population is affected; nobody understands how the sound can be below the threshold of hearing and be affecting people.
- The admittedly broad brush analysis of Ms Shafer's survey set out above suggests that only a small proportion of the surrounding population is affected.
870 Kobyboyn Road, Whiteheads Creek and 900 Greenslopes Road, Trawool
(a) the location of the transmission line to follow the alignment shown as Option A in Figure 16 on page 82 of Brett Lane & Associates Pty Ltd report "Cherry Tree Wind Farm; Flora, Fauna, Habitat Hectare and Net Gain Analysis" dated June 2012;
(b) the location, setbacks to property boundaries, layout and dimensions of all on-site buildings and works including all turbines, access tracks, underground and overground cables, any temporary concrete batching plant, the substation, the switchyard, any designated car parking areas, and ancillary works such as construction compounds, fire fighting infrastructure and water tanks, as well as off-site road works;
(i) details of the model and capacity of the turbines to be installed;
(ii) elevations and dimensions of the turbines, including overall maximum height of turbines to the tip of the rotor blade when vertical, and base diameter at ground level, including tower and concrete base;
(iv) global positioning system coordinates using WGS84 datum for each turbine;
- each dwelling (if any) within 2 km of the turbine;
(i) locations, elevations and dimensions of the buildings and works including car parking areas;
(ii) materials and finishes of the buildings and works;
(e) the location, size, type and intensity of any lighting (including aviation safety lighting), any directional screening or baffling of lighting;
(f) any directional or business identification signage and any required safety signage; and
(g) any staging of the permitted development, including the identification and timetabling of any required pre-construction works.
(h) the Tree Protection Zones of all scattered remnant trees and large and very large old trees to be retained within 100 metres of the construction area, in accordance with conditions 55 to 59 of this Permit;
(i) any revisions to the location of the turbines or their models (where they differ from the specifications considered in the application reports and expert witness statements filed for the Applicant in VCAT Proceeding No P2910/2012) arising as a consequence of the environmental noise and electromagnetic interference assessments required under this permit.
(a) a dwelling existing as at 29 January 2013 that is within 2km of the turbine (measured from closest point of the turbine to closest point of the existing dwelling), unless evidence has been provided to the satisfaction of the Responsible Authority that the owner of the dwelling has consented in writing to the location of the turbine; or
(b) the removal of any additional remnant native vegetation.
For the purpose of this condition the micro-siting of turbines includes any consequential changes to access tracks and electricity reticulation lines.
Any application for the consent of the Responsible Authority to micro-siting a turbine under Condition 5 must be accompanied by supporting material addressing the matters referred to in this condition, to the satisfaction of the Responsible Authority and the Department of Environment and Primary Industries.
(a) the wind energy facility must comprise no more than 16 turbines;
(b) hub height must not exceed 100 metres in height;
(c) the overall maximum height of the turbines (to the tip of the rotor blade when vertical) must not exceed 159 metres above natural ground level;
(d) turbines must be mounted on a tubular tower with a height of no greater than 100 metres;
(e) each turbine is to have not more than three rotor blades;
(f) the transformer associated with each wind generator must be located beside each tower and pad mounted, or enclosed within the tower structure;
(g) the colours and finishes of all buildings and works (including turbines) must be of a non-reflective colour and finish to the satisfaction of the responsible authority;
(h) electricity reticulation lines associated with the wind energy facility must be placed underground to connect to the wind farm substation unless otherwise agreed in writing by the Responsible Authority.
(a) details of the properties on which off-site landscaping mitigation works will be undertaken, and the specific locations of the landscaping works on those properties
(b) details of plant species proposed to be used in the landscaping, including height and spread at maturity
(c) a timetable for implementation of the landscaping works (with each stage of the landscaping works to be completed not more than 12 months after the completion of the wind energy facility to which the landscaping works relate)
(d) a maintenance and monitoring program to ensure the ongoing health of the landscaping.
(a) The operator must ensure that at any wind speed, wind energy facility sound levels at noise sensitive locations in existence as at 29 January 2013 (as defined in the Standard) do not exceed a noise limit of 40dB LA90 (10 min) when measured in accordance with the Standard, provided that where the circumstances specified in Condition 12(b) apply, the noise limit of 40dB LA90 (10 min) will be modified as specified in Condition 12(b).
(b) At the specified assessment positions referred to in Condition 13(b), the noise limit of 40dB LA90 (10 min) referred to in Condition 12(a) will be modified in the following way when the following circumstances exist:
(i) where the background sound level is greater than 35 dB L A90 (10 min), the noise limit will be the background sound level L A90 (10 min) plus 5 dB; and
(ii) where special audible characteristics, including tonality, impulsive sound or amplitude modulation occur, the noise limit will be modified by applying a penalty of up to + 6 dB LA90 in accordance with section 5.4 of the Standard.
(a) Acoustic compliance reports shall be prepared by a suitably qualified and experienced independent acoustic engineer to demonstrate compliance with the noise limits specified in the Standard and submitted to the Responsible Authority.
(b) Noise assessment positions must be located according to the Standard, and shown on a map.
(c) An initial acoustic compliance report must be prepared and submitted to the Responsible Authority following completion of the first turbine, and at six monthly intervals thereafter until full operation (following construction and commissioning.
(d) A final compliance report must be submitted to the Responsible Authority after a 12 month period following full operation of the wind energy facility.
(e) Compliance reports should be publicly available.
(f) Following facility commissioning, all complaints shall be managed following procedures set out in the noise complaints management plan.
(a) Post installation sound levels shall, where practical, be measured at the same locations where the background sound levels were determined (GPS coordinates and a map showing these locations is to be provided).
(b) If a breach in compliance is detected, or an acoustic investigation is required under the noise complaints plan endorsed under condition 15, an independent assessment report must be prepared at the cost of the permit holder and by a suitably qualified and experienced independent acoustic engineer to:
(i) identify the weather or operational conditions associated with the complaint / breach;
(ii) analyse the uncertainty and confidence levels in the monitoring, and the steps taken to reduce uncertainty;
(iii) target assessment to identify the cause and remediation actions; and
(iv) submit a remediation plan to the satisfaction of the Responsible Authority outlining, the investigation process, complainant communications, actions and timelines to resolve the complaint/breach.
(c) Following the initial post-construction reporting process, additional independent assessment may be requested by the Responsible Authority at any time, where complaints are received and are considered to reasonably warrant investigation.
(d) If investigations indicate special audible characteristics are potentially occurring, procedures outlined in Appendix B of the Standard should be applied.
(a) Measures to communicate to the public the mechanism for making a query or complaint; including:
(i) a toll free telephone number and email contact for complaints and queries made to the operator; and
(ii) a telephone number and email address (where available) for complaints and queries made to council.
(b) Measures for the tabular recording of complaint information in a register of complaints for each complaint received, including:
(ii) any applicable property reference number if connected to a background testing location;
(iv) a receipt number for each complaint which is to be communicated to the complainant; and
(v) the time, prevailing conditions and description of the complainant's concerns including the potential incidence of special audible characteristics and the processes of investigation to resolve the complaint.
The register is to be maintained by the operators for the duration of the operation of the wind energy facility and must be made available to the council on request.
(c) A measure setting out the circumstances in which a complaint made to either the operator or council triggers a requirement for an acoustic investigation under condition 14(b).
(d) A requirement that the operational and climate information is recorded and retained by the operator to the extent necessary for a noise complaint evaluation to establish compliance with the New Zealand Standard 6808:2010, Acoustics - Wind Farm Noise under condition 14.
(e) A requirement that the information recorded under condition 15(d) is provided to the council at its request when such information is reasonably required for enforcement of the conditions of this permit (the provision of this information can be subject to undertakings as to confidentiality provided that the undertaking is not an obstacle to the enforcement of permit conditions).
(f) A report including a reference map of complaint locations, and outlining complaints, investigation and remediation actions is to be provided to the Responsible Authority on an annual basis and must be to the satisfaction of the Responsible Authority.
The plan must be implemented for the duration of the operation of the wind energy facility to the satisfaction of council.
Blade shadow flicker complaint evaluation and response plan
(b) procedures for assessing any alleged breach of Condition 16.
Blade Glint, Electromagnetic Interference and Television and Radio Reception and Interference
The pre-construction survey must include testing at selected locations to enable the average television and radio reception strength in the area within 5 kms of the site to be determined. The specific locations of testing will be determined by an independent television and radio monitoring specialist, to the satisfaction of the Responsible Authority
(b) aviation obstacle lighting in accordance with Condition 26; and
(c) lighting necessary in the case of an emergency or for operational call-outs at reasonable times,
Each of these lighting arrangements must be to the satisfaction of the Responsible Authority.
(a) for each lit turbine, the lighting must consist of a pair of lights mounted above the nacelle so that at least one light is visible from an aircraft approaching from any direction;
(b) each light must be a red, medium intensity, flashing light, or as required by CASA;
(c) each light must be shielded so as to restrict the vertical spread of light to not more than 3.0 degrees and light spread below the horizontal to not more than 1.0 degree;
(e) the duration of the light flash must be the minimum period recommended by CASA and the duration of the period between the flashes must be the maximum period recommended by CASA; and
(f) the lights are to switch on and off during ambient lighting conditions as recommended by CASA.
(b) the Department of Defence (RAAF Aeronautical Information Service);
(d) the Aerial Agriculture Association of Australia; and
(e) any organisation responsible for providing air ambulance services in the area.
The traffic management plan, without limiting the generality of the plan, must include:
(a) prior to commencement of works, an existing conditions survey of public roads and associated infrastructure that may be used in connection with the wind energy facility (for access, delivery of material, pre-construction or construction purposes), including details of the suitability of the proponent's use, design, condition and construction standard of the relevant public roads and bridges;
(b) identification and assessment of the road and non-road infrastructure at risk from damage, deterioration or dilapidation arising from the construction and operation of the wind energy facility, including but not limited to Homewood Road and Kobyboyn Road;
(c) the designation of all vehicle access points to the site from surrounding roads. Vehicle access points must be designed and located to ensure safe sight distances, turning movements, and avoid potential through traffic conflicts;
(d) the designation and suitability assessment of appropriate pre-construction, construction and transport vehicle routes to and from the site;
(e) engineering plans and reporting demonstrating whether, and if so, how truck movements to and from the site, including turning movements, can be safely accommodated within the road reserve. Mitigation measures are to be developed by the proponent and to the satisfaction of VicRoads, the Department of Environment and Primary Industries and the Mitchell Shire Council for all hazards including, but not limited to; oversize and overmass haulage, traffic management, removal of roadside vegetation, reduction in speed limits, alteration to any road furniture or intersection, emergency management, dust suppressant measures and risk management;
(f) recommendations regarding the need for road, bridge and intersection upgrades to accommodate any additional traffic, oversize or overmass loads, or site access requirements (whether temporary or ongoing). Where upgrades are required, the traffic management plan must include:
(i) detailed engineering plans showing the required works; and
(ii) the timing of when the works are to be undertaken;
(g) a program of regular inspections to be carried out during the construction of the wind energy facility to identify road safety hazards or maintenance works necessary as a result of construction traffic;
(h) a program to ensure safe access to affected residential properties;
(i) the designation of operating hours and speed limits for trucks on routes accessing the site which:
(i) avoid school bus routes and school bus times where relevant; and
(j) stock crossing points to be identified and measures to be taken to manage impacts and avoid disruption addressed;
(k) measures to be taken to manage traffic impacts associated with the construction and ongoing operation of the wind energy facility on the traffic volumes and flows on surrounding roads;
(l) a program to rehabilitate existing road and associated infrastructure, including the infrastructure identified in condition 29(b), to a safe and usable condition to a standard no less than what is required to support the proposed use or the condition identified by the surveys required under Condition 29(a), whichever is the greater:
(ii) at the conclusion of the construction of the wind energy facility;
(iii) after the first two years during the operation of the wind energy facility;
(iv) every five years during the operation of the wind energy facility (if required by the road authority);
(vi) at the conclusion of the decommissioning of the wind energy facility;
(m) demonstration that all necessary permits have been obtained for the removal of vegetation within the road reserve for the purpose of providing access to the site for material;
(n) an environmental management plan to address vehicle hygiene, dust management and other environmental matters;
(o) a program to immediately rehabilitate existing public roads during construction of the wind energy facility in the event that damage is caused to public roads and to ensure that any public road surface is of a safe and usable quality;
(p) a statement that the permit holder is responsible for any damage caused to construction vehicle or other vehicles associated with the development of the wind energy facility in the event that the safe and usable quality of any public road is degraded or compromised as a result of the development, and that Mitchel Shire Council, the Department of Environment and Primary Industries and/or VicRoads will not accept liability for any such damage.
General requirement for an environmental management plan
(a) must be generally in accordance with the environmental management plan submitted with the application amended to have regard to the development plans endorsed under condition 1 of this Permit;
(b) must be prepared in consultation with the agencies specified in Conditions 36 to 45 or any other agency as directed by the Responsible Authority;
(d) must be in accordance with all applicable EPA requirements; and
(e) must meet the requirements of Conditions 36 to 45 below.
(a) the identification of fuels, other hazardous materials and all other potential contaminants stored or used on site during the construction phase of the wind energy facility, and appropriate storage, construction and operational methods to control any identified contamination risks;
(b) procedures for managing potential spills and leaks and pollution incidents, including incorporation of appropriate pollution control measures outlined in EPA Publication 480 Environmental Guidelines for Major Construction Sites;
(c) procedures to suppress dust emissions from construction-related activities. Appropriate measures may include water spraying of roads and stockpiles, stabilising surfaces, temporary screening and wind fences, modifying construction activities during periods of heightened winds and revegetating exposed areas as soon as practicable;
(d) procedures for managing noise emissions from construction-related activities;
(e) criteria for the siting of any temporary concrete batching plant associated with the development of the wind energy facility and the procedure for its removal and reinstatement of the site once its use finishes. The establishment and operation of any temporary concrete batching plant must be designed and operated in accordance with EPA Publication 628 Environmental Guidelines for the Concrete Batching Industry;
(f) appropriate sanitary facilities to be provided for construction and maintenance staff, which must be designed and operated in accordance with EPA Publication 891.2 Code of Practice - Onsite wastewater management (December 2008);
(g) the identification of waste re-use, recycling and disposal procedures;
(h) a timetable, where practicable, for the construction of turbine bases, access tracks and power cabling during warmer months, to minimise impacts on ephemeral wetlands, local fauna and sediment mobilisation;
(i) procedures to ensure that construction vehicles and equipment use designated tracks and works areas to avoid impacts on native vegetation;
(j) procedures for covering trenches and holes at night, and filling trenches as soon as practical after excavation, to protect native fauna; and
(k) the removal of works, buildings and staging areas on completion of the construction phase of the project.
Sediment, erosion and water quality management plan
The sediment, erosion and water quality management plan must include:
(a) identification of all construction and operational processes that could potentially lead to water contamination;
(b) procedures to ensure that silt from batters, cut-off drains, table drains and road works is retained on the site during and after construction and replaced as soon as possible. To this end:
(i) all land disturbances must be confined to a minimum practical working area;
(ii) soil to be removed must be stockpiled and separate soil horizons must be retained in separate stockpiles and not mixed, and soil must be replaced as soon as possible in sequence; and
(iii) stockpiles must be located away from drainage lines and other environmentally sensitive areas;
(c) All buildings and structures (excepting overhead transmission line structure) shall be a minimum of 30 metres from a waterway and a minimum of 50 metres from the Goulburn River;
(d) With the exception of waterway crossings permitted under the Water Act 1967, the site set−out and implementation of works shall be designed and constructed to maintain a minimum buffer width of undisturbed vegetation of 30 metres along waterways;
(e) the installation of geo-textile silt fences (with sedimentation basins where appropriate) on all drainage lines from the site which are likely to receive run-off from disturbed areas;
(f) procedures to ensure that steep batters are treated in accordance with EPA Publication 275 Construction Techniques for Sediment Pollution Control;
(g) procedures for waste water discharge management;
(h) a process for overland flow management to prevent the concentration and diversion of waters onto steep or erosion prone slopes;
(i) pollution management measures for stored and stockpiled materials including ensuring storage and stockpiling of materials does not occur in environmentally sensitive areas, waste materials, litter, contaminated run-off and any other potential source of pollution to ground or surface waters;
(j) incorporation of appropriate pollution control measures outlined in EPA Publication 480 Environmental Guidelines for Major Construction Sites;
(k) an agreed program and appropriate capacity for annual inspection and regular maintenance of any on-site wastewater management system;
(l) siting of any concrete batching plant and any on-site wastewater disposal treatment fields at least 100 metres from any watercourse;
(m) a program of inspection and remediation of localised erosion within a specified response time;
(n) measures to allow rain falling on construction areas to be managed to enable local infiltration into groundwater to achieve minimal reduction in net recharge volumes to the ground water system; and
The section of access road to be upgraded crosses designated waterways a number of times. If these crossings are to be upgraded a licence for the works shall be required under Section 67 of the Water Act, 1989. A licence shall be required where services cross designated waterways.
(a) procedures for any on-site, permanent post-construction storage of fuels, lubricants, waste oil or other hazardous substances or potential contaminants to be in bunded areas; and
(b) contingency measures to ensure that any chemical or oil spills are contained on-site and cleaned up in accordance with EPA requirements.
(a) criteria for the provision of static water supply tanks solely for fire fighting purposes, including minimum capacities, appropriate connections and signage;
(b) procedures for vegetation management, fuel control and the provision of fire fighting equipment during declared fire danger periods;
(c) minimum standards for access roads and tracks to allow access for fire fighting vehicles, including criteria for access to static water supply tanks for fire fighting vehicles;
(d) a requirement that, within three months after the commencement of the operation of the wind energy facility, the operator of the wind energy facility facilitates a familiarisation visit to the site and explanation of emergency services procedures for:
(i) the CFA (CFA Headquarters, Hume Regional Office (District 22) and Kobyboyn CFA);
(iii) Mitchell Shire Council and Murrindindi Shire Council's Municipal Emergency Management Committees;
(e) subsequent familiarisation sessions for new personnel of the organisations referred to in Condition 39(d) on a regular basis as required;
(f) if requested, training of personnel of the organisations referred to in Condition 39(d) in relation to suppression of wind energy facility fires.
Blasting management plan (only relevant where blasting is proposed)
(a) name and qualification of the person responsible for blasting;
(b) a description of the location of where explosives will be used;
(c) a plan showing the location of every licensed bore on any property with a boundary within 1 km of the location of the blasting;
(d) identification and assessment of any potentially sensitive site within 1 km of the location of the blasting, including the procedure for pre-blast and post-blast qualitative measurement or monitoring of the effects of the blasting on such sites;
(e) the procedure for site clearance and post-blast re-occupation;
(f) the procedure for the storage and handling of explosives;
(g) a requirement that blasting can only occur after at least 48 hours prior written notification of the intention to undertake blasting has been given to the occupants of the properties which are located in whole or in part within 1 km of the location of the proposed blasting; and
(h) a requirement that blasting only be undertaken between the hours of 8am and 4pm.
(a) procedures for the rehabilitation of construction zones with appropriate pasture species or native grasses; and
(b) procedures for the rehabilitation of remnant native vegetation along the Homewood Road reserve with appropriate species.
(a) procedures to prevent biosecurity risks, which may include (but are not limited to):
(i) the cleaning of all plant and equipment before transport onto and off the site, and making sure machinery cleaning/washdown facilities are defined (eg. fenced) and located in disturbed areas; and
(ii) the use of material/products on site which are free of invasive plants and animals;
(b) procedures to control noxious weeds within 100 metres of the construction area using precision methods (eg. spot spraying). These methods should be implemented throughout the project for:
(c) protocol for effective identification of biosecurity risks, early intervention to manage biosecurity risks, ongoing monitoring of biosecurity risks, trace-backs, and integrated control measures when entry, establishment or spread of specific risk targets is identified; and
(d) requirements to comply with approved government or industry standards and procedures for the identification, prevention and management of biosecurity risks that apply from time to time, which include (but are not necessarily limited to):
(i) the Department of Primary Industry's Invasive Plant and Animal Management Policy Framework (undated);
(ii) the Department of Primary Industry's Biosecurity Guidelines for Movement of Equipment Contractors Between Farms (Note Number: AG1171 published in January 2005 and updated in July 2009; and
(iii) the Department of Primary Industry's recommended standards and practices for managing viticulture biosecurity and plant biosecurity risks.
Note: These standards are available at www.depi.vic.gov.au.
(a) a register of environmental incidents, non-conformances and complaints, together with corrective actions taken in response to such incidents, non-conformances or complaints;
(b) identification of the person to whom reports of environmental incidents, non-conformances and complaints should be made.
The amended environmental management plan must be submitted to the Responsible Authority for re-endorsement. Once re-endorsed, the amended environmental management plan will take the place of the earlier environmental management plan and will form part of this permit.
(a) a statement of the objectives and overall strategy for managing and mitigating any significant bird and bat strike arising from the wind energy facility operations
(b) a monitoring program of at least two years duration that:
(i) commences on the commissioning of the last turbine of the first stage of the use and development approved by this permit or such other time approved by the Responsible Authority;
(ii) requires surveys to be undertaken during all seasons to ascertain:
(c) procedures for the reporting of any bird and bat strikes to the Responsible Authority and to Department of Environment and Primary Industries within seven days of becoming aware of any strike, identifying where possible whether the strike was at a lit or unlit turbine;
(d) information on the efficiency of searches for carcasses of birds and bats, and, where practicable, information on the rate of removal of carcases by scavengers, so that correction factors can be determined to enable calculations of the total number of mortalities;
(e) procedures for the regular removal of carcasses likely to attract raptors to areas near turbines;
(f) procedures for periodic reporting, within agreed timeframes, of the findings of the monitoring to the Responsible Authority, DEPI and the local community;
(g) recommendations in relation to a mortality rate for specified species which would trigger the requirement for responsive mitigation measures to be undertaken by the operator of the wind energy facility, to the satisfaction of the Responsible Authority and Department of Environment and Primary Industries;
(h) procedures for developing measures, in consultation with the Responsible Authority and Department of Environment and Primary Industries, to offset any impacts detected through the monitoring program, including:
(ii) on-site or off-site habitat enhancement (including management or improvement of habitat or breeding sites);
(iii) markers to be placed on all power lines along the Goulburn River to increase visibility and reduce collision risk.
(a) the extent and details of the further investigation must be to the satisfaction of the Responsible Authority and Department of Environment and Primary Industries;
(b) the investigation must be carried out to the satisfaction of the Responsible Authority and Department of Environment and Primary Industries.
(a) management and mitigation measures to address impacts to fauna utilising remnant native vegetation along Homewood Road, including but not limited to:
(i) the avoidance of any hollow bearing trees where practicable;
(ii) installation of nest boxes to compensate for loss of hollows;
(iii) measures to maintain connectivity along Homewood Road to ensure uninterrupted fauna movement; and
(b) salvage and translocation plans for the Squirrel Glider, Brush-tailed Phascogale and Bibron's Toadlet; and
(c) management and mitigation measures to address other impacts to native fauna.
(a) details of the extent of native vegetation removal to occur including the ecological significance of the vegetation;
(b) a plan showing the native vegetation that is to be removed; and
(c) a revised assessment of the matters recorded in the expert witness statement of Brett Lane & Associates Pty Ltd filed in VCAT Proceeding No P2910/2012 and dated January 2013.
(a) Appropriate offsets to compensate for the loss of native vegetation;
(iii) type of offsets to be provided for each location;
(iv) details of revegetation including the number of trees, shrubs and other plants, species mix and density;
(vi) methods of permanent protection for the offsets;
(vii) details of any existing native vegetation to be retained including the methods of managing and restoring the native vegetation;
(viii) person(s) responsible for implementing and monitoring the Native Vegetation Offset Plan;
(ix) time frames for implementing the offset plans;
(x) details of any earthworks, drainage and other works; and
(c) The Plan must include a method to secure the offsets, which may be by:
(i) a requirement for the owner to enter into a section 173 agreement in respect of specified land;
(ii) a requirement for the owner to enter a binding agreement with a specified person in order to implement aspects of the offset plan;
(iii) a requirement for the owner to provide a bond as security for completion of any part of the offset plan.
(d) When approved, Native Vegetation Offset Plan must be implemented within 12 months of the commencement of works unless otherwise specified in the Plan. Maintenance and replanting of vegetation is to be undertaken if necessary until all the requisite numbers of plants are effectively established and have survived for at least 3 years.
(a) be calculated by 12 x the Diameter at Breast Height (DBH) and be in general accordance with the Australian Standard - Protection of Trees of Development Sites (AS 4970-2009); and
(b) be no less than 2 metres and no greater than 15 metres.
(a) be constructed of star pickets and chain mesh or similar to the satisfaction of the Responsible Authority;
(c) display a sturdy weatherproof sign containing the following wording:
"Tree Protection Zone - Access and Storage Prohibited"
(d) not be removed moved or otherwise altered unless with the prior written agreement of the Responsible Authority;
(a) the directional drilling bore is at least 600 millimetres deep; and
(b) a qualified arborist has confirmed in writing that the radius of the bore will not significantly damage the tree causing it to be lost in the future.
(c) the establishment of TPZs along Homewood Road is not possible due to the linear nature of this area. As such, a sign at either end of Homewood Road will need to be placed indicating that no trucks and / or machinery will be able to stop along the road. This will not apply to the arborists who will need to access the trees along Homewood Road to undertake the lopping.
(a) the performance of works required under Condition 31;
(b) the maintenance of those works for a period of 12 months after the works are completed.
(a) the amount of the security bond must be calculated by reference to the value of the works to which the security bond relates;
(i) must remain in place for a period of at least 12 months after the completion of the relevant works to which the security bond relates;
(ii) may only be applied to any works to which the security bond relates that are not completed in accordance with the requirements of this permit;
(iii) will be released at the completion of the maintenance period referred to in Condition 66(b).
Decommissioning / Section 173 Agreement
The agreement must require the operator of the wind energy facility to do the following where any or all turbines have permanently ceased to generate electricity:
(a) notify the Responsible Authority in writing of the turbine(s) ceasing operation. Such notification must be given no later than two months after the turbine(s) cease operation;
(b) undertake the following to the satisfaction of the Responsible Authority within such timeframe as may be specified by the Responsible Authority:
(i) remove all above ground non-operational equipment;
(ii) remove and clean up any residual contamination;
(iii) rehabilitate all storage areas, construction areas, access tracks and other areas affected by the decommissioning of the turbine(s), if those areas are not otherwise useful to the on-going use or decommissioning of the wind energy facility;
(iv) submit a decommissioning traffic management plan to the Responsible Authority and, when approved by the Responsible Authority, implement that plan;
(v) submit a post-decommissioning revegetation management plan, including a timetable of works, to the Responsible Authority and, when approved by the Responsible Authority, implement that plan.
(a) the development is not started within five years of the date of this permit
(b) the development is not completed within eight years of the date of this permit.
The Responsible Authority may extend the permit if a request is made in writing prior to the expiry of the permit or within three months afterwards.
[4] [1999] VCAT 794 at page 7
[5] For example, see Telstra Ltd v Mornington Peninsula Shire Council [2005] VCAT 863; Hutchison 3G Australia Pty Ltd v Hobsons Bay City Council [2005] VCAT 1470; Optus Mobile Ltd v Whittlesea City Council [2003] VCAT 968; Telstra Corporation Ltd v Casey City Council [2005] VCAT 2348