Chermside Medical Complex [2025] QBCCMCmr 347
Perpetual Corporate Trust Limited ACN 000 341 533 (applicant)
The Body Corporate for Chermside Medical Complex (respondent)
Body Corporate and Community Management Act 1997 (Qld) (Act), sections 227and 229(3)(a)
Body Corporate and Community Management (Commercial Module) Regulation 2020 (Commercial Module)
MAINTENANCE -where air conditioning cooling tower requires extensive repairs or replacement - where cooling tower is common property - where cooling tower now services only applicants' lots - where body corporate has signalled intention to decommission the cooling tower- where applicants argue body corporate must maintain and if necessary replace cooling tower
DISPOSITION OF COMMON PROPERTY - where body corporate is seeking to decommission the common property air conditioning cooling tower - where applicant argues decommission of air conditioning cooling tower is a disposal of common property
REASONABLENESS - whether it would be reasonable re applicant argues decommission of hot water system breaches the duty to act reasonably
(a) carry out repair works in accordance with the Isothermal Quote 42130R dated 1 April 2025;
(c) (if necessary) call a general meeting to decide how to fund the Repair Costs, including by way of a special levy.
(iii) an air-conditioning and condenser unit that services Lots 7 and 8.
(a) the Body Corporate must carry out the Works in accordance with the Isothermal Quote 42130R dated 1 April 2025 within 3 months of the Final Orders being made;
(c) (if necessary) the Body Corporate call a general meeting to fund the payment of
the Repair Costs, including by way of a special levy;
(d) the Body Corporate be permanently restrained from Decommissioning the Air-
(ii) the replacement Air-Conditioning System is operational; and
(e) such other orders as the Adjudicator deems appropriate.
$11,671.44 including GST (Repair Costs). On the same day the Applicant notified the Body Corporate Manager of the Repairs and requested confirmation that the Body Corporate is responsible for the Estimated Repair Costs.
(a) the Authorities largely concern whether the utility infrastructure services one Lot or more; and
(b) the Condenser Unit services more than one Lot;
(c) it is the Body Corporate's responsibility to replace the Condenser Unit, which was confirmed by SSKB in their email of 24 May 2024.
(a) provides cancer-related care to patients; and
(b) includes maintaining pharmaceutical drugs at correct temperatures (Tenant's Stock).
(a) Lots 7 and 8 will no longer be fit for the Tenant's Business; and
(b) they will lose about $400,000.000 worth of the Tenant's Stock.
(a) carry out the Works; and
(b) pay for the costs of carrying out the Works (Repair Costs).
(a) the Body Corporate will:
(i) commence Decommissioning the Air-Conditioning System; and
(ii) not reinstate the Air-Conditioning System;
(b) the Applicant and/or the Tenants will suffer significant losses.
(a) the Undertaking must be provided by 12:00pm on 28 May 2025; and
(b) should the Undertaking not be provided by that time, HWLE had instructions to proceed with the Adjudication Application for Interim Orders without further notice.
(a) not complete the Works; and/or
(b) decommission the Air-Conditioning System.
(a) the Body Corporate, not the Applicant, must repair and maintain the Air-Conditioning System in a good condition;
(b) the Air-Conditioning System has not been in a good condition for over twelve (12) months; and
(c) rather than carry out the Works, the Body Corporate has threatened to decommission the Air-Conditioning System, despite knowing that doing so will cause significant Loss to the Applicant and/ or their tenants.
1. The Body Corporate passing a resolution to Decommission the Air-Conditioning Service within 3 months of the order date; and/or
2. The Applicant and Respondent entering into an agreement pursuant to section 157 of the Module (which allows recovery of service costs from users).
(a) The system solely benefits the Applicant's Lots, and other lot owners maintain their own systems.
(b) Requiring the Body Corporate to pay the circa $180,000 replacement cost would mean other owners subsidizing air-conditioning for the Lots.
(c) The replacement cost is approximately four times the cost of decommissioning.
(d) Air conditioning is not a utility service the legislation requires bodies corporate to provide.
(e) A majority of lot owners in the Scheme have indicated an intention to vote to decommission the system.
1. The Air-Conditioning System is utility infrastructure under the BCCM Act.
2. The Respondent is responsible for repairing and maintaining the Air-Conditioning System.
(a) that the Body Corporate must carry out the Works in accordance with the Isothermal Quote 42130R dated 1 April 2025 within 3 months of the Final Orders being made;
(b) that the Body Corporate be permanently restrained from Decommissioning the Air- Conditioning System until such time as:
(ii) the replacement Air-Conditioning System is operational.
1. The Body Corporate passing a resolution to Decommission the Air-Conditioning Service within 3 months of the order date; and/or
2. The Applicant and Respondent entering into an agreement pursuant to section 157 of the Module (which allows recovery of service costs from users).
An adjudicator may make an order that is just and equitable in the circumstances (including a declaratory order) to resolve a dispute, in the context of a community titles scheme, about-
(a) a claimed or anticipated contravention of the Act or the community management statement; or
(b) the exercise of rights or powers, or the performance of duties, under the Act or the community management statement; or
(c) a claimed or anticipated contractual matter about-
(i) the engagement of a person as a body corporate manager or service contractor for a community titles scheme; or
(ii) the authorisation of a person as a letting agent for a community titles scheme.
(a) 17 lots including Lots 7 and 8;
(b) common property, including the roof; and
(c) an air-conditioning unit (Air-Conditioning Unit) and condenser unit on the Roof that services Lots 7 and 8 (Condenser Unit).
(a) Lots 7 and 8 will no longer be fit for the Tenant's Business; and
(b) they will lose about $400,000.000 worth of the Tenant's Stock.
(1) The body corporate must maintain common property in good condition, including, to the extent that common property is structural in nature, in a structurally sound condition.
(4) Also, despite anything in subsections (1) and (2) -
(c) the owner of the lot is responsible for maintaining, in good order and condition, utility infrastructure, including utility infrastructure situated on common property, to the extent that the utility infrastructure -
(i) relates only to supplying utility services to the owner's lot; and
(ii) is 1 of the following types -
[39] If lot 8 did not exist, there would be no need for toilet facilities on the 1st floor of the building (which would then comprise only the internal upstairs areas in lots 4 to 7), nor would there be a need for disabled access to that floor. The elevator is only necessary because of the design of lot 8 and the consequent requirement to have additional toilet facilities.
[40] Alternatively, if only the ground floor of lot 8 existed and the 1st floor did not, the elevator would not be required, which would have allowed space for additional toilet facilities on the ground floor, sufficient to cater for the requirements of the building housing lots 4 to 8.
[41] These facts demonstrate sufficiently to my satisfaction that the elevator does relate only to the supply of utility services to lot 8. That being so, under s 115(3)(b) of the Commercial Module, the owner of lot 8 is responsible for maintaining the elevator.
[79] Given the definitions of "utility infrastructure" and "utility services", the text suggests the need for
(a) an objective identification and understanding of -
(i) the nature and function of the particular utility infrastructure concerned;
(ii) the type of utility services which it supplies;
(iii) the lots or common property to which those services are supplied; and
(b) against that background, a determination of the extent to which the utility infrastructure concerned could be said to relate only to the supply of the services to the particular lot concerned.
[80] In this case, the analysis referred to in the previous paragraph was left to be performed by an examination of plans which identified the physical layout of the relevant areas of Building B; a lay person's understanding of how building users might be expected to use the lift given the physical layout; some expert evidence of the impact of the Building Code of Australia; and, finally, evidence of how the lift was used in fact. There was not, as there might have been, any expert architectural or other design opinion shedding light on the analysis.
[81] In my view, the evident function of the lift was to provide one of two alternative means of access between the common property foyers on the lower and upper levels of Building B between lot 7 and lot 8, the second means being the common property stairs. As an alternative, the lift would be relevant and available to any person wishing to access or depart from the upper level of lot 8. But, critically, it would also be a relevant and available alternative to any person who wished to access or depart from the common property toilet facilities on the upper level or the roof itself. It would be impossible to reach a conclusion that there was a sole or exclusive relationship between the lift and the supply of utility services to lot 8. One could easily reach the conclusion that one function of the lift was to enhance access to lot 8. One might even be persuaded that that was the dominant function. But one could not conclude it was the only function because it would also be true to say that the lift enhanced access in relation to common property (namely by easing the path to and from the common property toilet facilities and the roof) such that it could be regarded as relating to the supply of access to common property.
[82] It was suggested by the appeal tribunal that no regard should be had to evidence of how and for what purposes the lift is used in fact. Whilst it would be correct to seek to exclude subjective statements of the intention some person had in installing a particular type of infrastructure, I think it would be wrong to conclude that evidence of actual usage would in all circumstances be irrelevant to the requisite analysis. In the present circumstances the conclusion I have expressed in the previous paragraph would be reached even if one disregarded the evidence of actual usage. However that evidence of actual usage tended to shed light on (so as to confirm) an objective understanding of how building users might be expected to use the lift.
[83] In my respectful view, the contrary conclusion reached by the appeal tribunal was reached because the learned member misconstrued s 115(3) of the Commercial Module as authorizing the application of a "but for" test. The learned member enquired whether "but for" the existence of lot 8, the lift would have been necessary. He answered the question in the negative and concluded that but for lot 8, the lift would not have been necessary and, accordingly, the infrastructure related only to the supply of services to lot 8. However, for reasons I have identified, the analysis called for by the proper construction of s 115(3) was not one to which the application of a "but for" test was apposite. The application of a "but for" test would, wrongly, operate to treat as irrelevant relationships between infrastructure and the supply of utility services to other lots or common property if those relationships existed, but could not be regarded as so significant that they explained the existence of lot 8. Section 115(3) does not contemplate that course.
[84] The conclusion reached by the adjudicator was correct and the decision of the appeal tribunal (QCAT) to reverse it should be set aside.
... a sole or exclusive relationship between the utility infrastructure [the lift] and its supply of utility services to the lot concerned such that, if the utility infrastructure also relates to the supply of relevant services to common property or to lots other than the lot concerned, then it could not be said to "relate only" to supplying utility services to the lot concerned."
[72] However I am not sure the circumstances in Owltown are entirely apposite to the present case, and it is possible that Owltown could be distinguished.[3] In Owltown the utility infrastructure (lift) could be used to access common property where common property toilet facilities on the upper level. At paragraph [81] the Court of Appeal stated:
But, critically, it would also be a relevant and available alternative to any person who wished to access or depart from the common property toilet facilities on the upper level or the roof itself. It would be impossible to reach a conclusion that there was a sole or exclusive relationship between the lift and the supply of utility services to lot 8.
It does not follow that all owners should bear the costs associated with providing air conditioning services to those particular lots that connect to the cooling tower. Section 167 provides for the supply of utility and other services, including air conditioning, by the body corporate. Air conditioning services are not something that the legislation requires that bodies corporate must provide to owners. Section 157(1) provides only that this service may be provided by a body corporate. Unlike for example, maintenance of or electricity supply to common property, it is a service that benefits particular lots rather than the scheme as a whole. The Applicant and Respondent entering into an agreement pursuant to section 157 of the Module (which allows recovery of service costs from users).
[32] Both parties agree that the air conditioning cooling tower is utility infrastructure that provides a utility service and that, by virtue of section 20 of the Act, it is common property which the body corporate is obliged to maintain, by virtue of section 157(1) of the Accommodation Module, unless it decides to decommission and/or remove it. [my emphasis]
(a) The system solely benefits the Applicant's Lots, and other lot owners maintain their own systems.
(b) Requiring the Body Corporate to pay the circa $180,000 replacement cost would impose a substantial financial burden on the owners but would only benefit the applicants. This would mean other owners would be subsidizing air-conditioning for lots 7 & 8.
(c) The replacement cost is approximately four times the cost of decommissioning.
(d) Air conditioning is not a utility service the legislation requires bodies corporate to provide.
(e) A majority of lot owners in the Scheme have indicated an intention to vote to decommission the system.
(a) maintenance services including, for example, cleaning, repairing, painting, pest prevention or extermination and mowing;
(b) communication services including, for example, the installation and supply of telephone, intercom, computer data and television;
(c) domestic services including, for example, electricity, gas, water, garbage removal, air conditioning and heating.
(a) carry out repair works to the Works in accordance with the Isothermal Quote 42130R dated 1 April 2025;
(c) (if necessary) call a general meeting to decide how to fund the Repair Costs, including by way of a special levy.
[1] BCCM Act, Schedule 6, definition of Utility Infrastructure.
[2] BCCM Act, Schedule 6, definition of Utility Service. See also Commercial Module, s127(4)(a)(ii)(E).
[3] Section 32C of the Acts Interpretation Act provides that in an Act -
(a) words in the singular include the plural; and (b) words in the plural include the singular.
(a)
[4] Bayview Shores [2007] QBCCMCmr 548
[5] See generally Ainsworth v Albrecht [2016] HCA 40; Body Corporate for Beaches Surfers Paradise v Backshall [2016] QCATA 177