[2025] VCAT 1061
General information, not legal advice.
Victorian Civil and Administrative Tribunal
2025-12-02
Original judgment source is linked above.
Construct a building and construct and carry out works
(a) The changes shown on plans prepared by R Architecture dated 22 September 2025 (Drawing Numbers TP03 Rev I and TP04 Rev G).
(b) A corner splay provided in the north-eastern corner of the site that is at least 50 per cent clear of visual obstructions, extending at least 2 metres along the front boundary from the corner of the site, and 2.5 metres along eastern side boundary, to provide a clear view of pedestrians on the footpath in front of the site for vehicles exiting the driveway of No. 43 Bardsley Street. The area clear of visual obstructions may include landscaped areas, provided the landscaping in this area is less than 900mm in height.
(c) At least two openable sashes in the clerestories of playrooms 2 and 3, controlled by remote operation.
(d) Skylights to the central hallway at a rate of 1 skylight per 4 metre spacing.
(e) Roof plan indicating the location of clerestories and photovoltaic arrays noting their generation capacity.
(f) Provision of low SHGC double glazed windows for the kitchen and west-facing glazing.
(g) Provision of high performance windows with a low solar heat gain coefficient value for all glazing on the east elevation.
(h) Provide a WSUD Layout Plan in the main drawing set which:
- Indicates all catchments and associated treatment devices per the modelling, including an annotation with their description.
- Notes that in-ground raingardens are to be located away from building footings and setback from side/rear boundaries for a width equivalent to their depth.
(i) A schedule of construction materials, external finishes and colours.
(j) Alterations to the SDA generally in accordance with the report received by Council on 29 November 2024 but showing:
- Beyond using HVAC systems with best practice EER/COP, provide measures to mitigate energy use for any ducted HVAC systems (e.g. full economy-cycles, carbon dioxide monitoring, heat recovery, etc.).
- Include a full copy of the published BESS report within the Sustainable Design Assessment (SDA) after revision to include claiming Transport credits 1.4 and 1.6.
a) Be paid prior to the issue of a building permit for the land or prior to Statement of Compliance (SOC) for the subdivision of the land associated with the development permit, whichever comes first; OR
b) When a staged subdivision is sought, be paid prior to the issue of a Statement of Compliance based on the net increase within each stage.
(a) Transport of materials, goods or commodities to or from the land
(b) Appearance of any building, works or materials
(c) Emission of noise, artificial light, vibration, smell, fumes, smoke, vapour, steam, soot, ash, dust, waste water, waste products, grit or oil
(d) Presence of vermin.
(a) Only clean rainwater shall be discharged to the stormwater drainage system;
(b) Stormwater drainage system protection measures shall be installed as required to ensure that no solid waste, sediment, sand, soil, clay or stones from the premises, enters the stormwater drainage system;
(c) Vehicle borne materials shall not accumulate on the roads, naturestrips and footpaths abutting the site;
(d) All machinery and equipment must be cleaned (if required) on site and not on adjacent footpaths or roads;
(e) All litter (including items such as cement bags, food packaging and plastic stripping) must be disposed of responsibly;
(f) All site operations shall comply with the Environment Protection Noise Regulations 2021.
(a) Constructed in concrete or asphalt;
(b) Properly formed to such levels that they can be used in accordance with the plans;
(c) Drained;
(d) Illuminated;
(e) Line marked to indicate each car space and all access lanes and
(f) Clearly marked to show the direction of traffic along access lanes and driveways
Any existing road infrastructure or non-road infrastructure located within or adjacent to the new crossover must be altered, relocated or reconstructed to the satisfaction of the Responsible Authority and/or the relevant utility provider or infrastructure manager at the expense of the owner/developer.
(a) The development is not started within two (2) years of the issued date of this permit.
(b) The development is not completed within four (4) years of the issued date of this permit.
(c) The use does not start within two (2) years of completion of the development.
In accordance with Section 69 of the Planning and Environment Act 1987 (Vic), an application may be submitted to the Responsible Authority for an extension of the periods referred to in this condition.
[1] The submissions and evidence of the parties, any supporting exhibits given at the hearing and the statements of grounds filed have all been considered in the determination of the proceeding. In accordance with the practice of the Tribunal, not all of this material will be cited or referred to in these reasons.
[2] As identified in the Brimbank Activity Centre Strategy 2018 referenced in Clause 11,03-1L-01.
[3] https://www.abs.gov.au/census/find-census-data/quickstats/2016/SSC22385 retrieved 21 November 2025.
[4] [2005] VCAT 1133 (8 June 2005)
[5] As outlined in Community Services and Infrastructure Plan 2018-2038 (Brimbank City Council. 2018) page 27.
Chen
Brimbank CC [2025] VCAT 1061
National Child Care Centres Pty Ltd v Maroondah CC [2005] VCAT 1133 (8 June 2005)