[2016] VCAT 724
General information, not legal advice.
Victorian Civil and Administrative Tribunal
2016-05-09
Original judgment source is linked above.
To allow educational, recreational, religious, community and a limited range of other non-residential uses to serve the local community needs in appropriate locations.
The decision guidelines within the zone provisions also expressly address this land use question:
Non-residential use and development[3]
This policy builds on the MSS objective in clause 21.08 (sic) to limit the intrusion of non-residential uses into residential precincts.
Canopy trees are the main element of the urban character of Maroondah. Canopy trees in particular soften the impact of buildings in the environment and provide a distinct leafy character to Maroondah.
The continuous nature of the canopy vegetation throughout the ridgelines of Maroondah provides a strong character element and is much valued by the community. The canopy vegetation is a defining element of the ridgelines of Maroondah.
Contiguous canopy vegetation contributes to the maintenance of biodiversity through the provision of wildlife movement corridors, habitat and shelter areas.
Neighbourhood area 1 Mullum Mullum Creek[5]
The preferred future character will be achieved by:
However, Mr Song also acknowledge that the essential characteristics of the proposed childcare centre, that is a centrally located building, car parking to the front and outdoor play spaces to the sides and rear, is an inevitable consequence of the functional, planning and other regulatory requirements of the use.
The use of the land for the purpose of a childcare centre, the construction of an associated building, the construction or carrying out of associated works and the display of advertising signs in accordance with the endorsed plans:
Before any buildings and works or use start (whichever is the sooner), plans to the satisfaction of the Responsible Authority must be submitted to and approved by the Responsible Authority. When approved, the plans will be endorsed and will then form part of the permit. The plans must be drawn to scale with dimensions and three copies must be provided. The plans must be generally in accordance with the plans dated August 2015 but modified to show:
(a) Front boundary treatment to be labelled on the site plan.
(b) The deletion of the two, rear tandem car spaces adjacent to the proposed service area to the south west of the chilcare centre and the deletion of the two northernmost , rear tandem car spaces adjacent the proposed play area north east of the childcare centre to create new areas for landscaping including canopy trees;
(c) The clear specification of finished site levels, particularly at the boundaries of the land;
(d) Acoustic measures recommended by the Acoustic Report prepared by Acoustic Logic dated 31 March 2016 as revised in accordance with this condition to include:
(i) The extension of the acoustic fence proposed along the north east boundary to include the property at 4/17 Mullum Mullum Road, and ;
(ii) A review of recommendations in relation to the acoustic treatment of the south west boundary of the land having regard to the clarification of finished site levels required by condition 1(c);
(e) the construction detail and the content of the proposed signs;
(f) Location of kerbs or some other type of barrier that adequately protects landscape areas from car park spaces and access lanes.
(g) The reconstruction of existing crossovers in accordance with condition 15 (the north-eastern crossing must be detached from the drainage pit).
(h) Driveway amended to align with crossovers.
The use and development as shown on the endorsed plans must not be altered without the written consent of the Responsible Authority.
The location, size and content of the signs and supporting structure, shown on the endorsed plans, must not be altered without the prior written consent of the Responsible Authority.
(a) be constructed and maintained to the satisfaction of the Responsible Authority;
(b) not be illuminated except without the further consent of the Responsible Authority.
The use and/or the occupation of the development must not detrimentally affect the amenity of the area through the:
(a) Transportation of materials, goods or commodities to or from the land;
(b) Appearance of any building, works or materials;
(c) Emission of noise, artificial light, vibration, smell, fumes, smoke, vapour, steam, soot, ash, dust, waste water, waste products, grit or oil;
(d) Presence of vermin; or
(e) In any other way.
No public address system may be used which results in noise being audible outside the site.
All security alarms or similar devices installed on the land must be of a silent type in accordance with any current standard published by the Standards Australia International Limited and be connected to a security service.
Unless with the prior written consent of the Responsible Authority, no more than 100 children may be in care at any one time.
Unless with the prior written consent of the Responsible Authority, the centre may only operate between the following hours:
The plant and equipment on the roof of the building must be screened in a manner to complement the appearance of the building to the satisfaction of the Responsible Authority.
All external lights must be designed, baffled and located so as to prevent nuisance or light spill to adjoining land to the satisfaction of the Responsible Authority.
Before any building or works start, construction plans for all parking areas and access lanes must be submitted to and approved by the Responsible Authority. The construction plans must be consistent with the endorsed site layout, development plans and landscaping plans.
Before the use starts or the development is occupied (whichever occur first), the area(s) set aside for the parking of vehicles and access lanes as shown on the approved plan must be:
(a) Surfaced with an durable all-weather seal;
(b) Drained to the nominated legal point of discharge;
all to the satisfaction of the Responsible Authority.
Before the development is occupied, the owner must at its cost remove the existing vehicle crossing and construct two (2) new industrial concrete vehicular crossings at right angles to the road to suit the proposed driveway to the satisfaction of the Responsible Authority. The vehicle crossings must be a minimum 1.0 m offset from any existing tree or utility service assets.
Before any building or works start, drainage plans including calculations prepared by a suitably qualified person to the satisfaction of the Responsible Authority must be submitted to and approved by the Responsible Authority. The Drainage Plans must:
(a) Show all drainage works associated with the development including any drainage works required beyond the boundaries of the land;
(b) Show the nominated legal point of discharge;
(c) Convey stormwater runoff by means of underground drains to the nominated legal point of discharge.
(d) Prevent overland flows from having a detrimental effect on the environment or adjoining properties;
(e) Limit the permissible Site Discharge (PSD) to the equivalent of a 35% impervious site coverage, or the pre-developed discharge rate, if it is less than 35% impervious site coverage, to the satisfaction of the Responsible Authority; and
(f) Provide appropriate stormwater detention storage for a 10 Year ARI storm event to limit the maximum discharge rate to the PSD;
Before the development is occupied, the drainage and associated works shown on the Drainage Plans must be constructed in accordance with those plans to the satisfaction of the Responsible Authority. Within 14 Days of the completion of the works, certification by a suitably qualified engineer must be submitted to the Responsible Authority certifying that works have been completed in accordance with the Drainage Plans.
During the construction of the development, methods to control sediment laden runoff as described under 'Best Practice Environmental Management Guidelines for Urban Stormwater' or similar must be implemented and used to minimise sediment laden runoff and stormwater pollution from leaving the land to the satisfaction of the Responsible Authority
Before the development starts, three copies of a Construction Management Plan (CMP) to the satisfaction of the Responsible Authority must be submitted to and approved by the Responsible Authority. When approved the CMP will form part of the permit and must be implemented and complied with at all times to the satisfaction of the Responsible Authority. The CMP must include, but not be limited to, the following:
(a) Details of hours of demolition and construction including deliveries;
(b) Details of the construction program;
(c) Traffic Management details;
(d) Methods to contain dust, dirt and mud within land, and the method and frequency of clean up procedures;
(e) Details of facilities on the land for vehicle washing;
(f) Protection measures for features of the land to be retained including vegetation, retaining walls, buildings, other structures and pathways;
(g) Details of delivery and unloading points and expected frequency;
(h) Details of a liaison officer for contact by residents and the Responsible Authority in the event queries or problems are experienced;
(i) Details of the movement of construction vehicles to and from the land to avoid traffic hazards in and around the land;
(j) Details of parking facilities for construction workers;
(k) Measures to minimise the impact of construction vehicles arriving at and departing from the land;
(l) An outline of requests to occupy public footpaths or roads, and anticipated disruptions to local services;
(m) The processes to be adopted for the separation, re-use and recycling of demolition materials;
(n) The measures for prevention of the unintended movement of building waste and hazardous materials and other pollutants on or off the land, whether by air, water or other means;
(o) The measures to minimise the amount of waste construction materials; the provision for the recycling of demolition and waste materials; and the return of waste materials to the supplier (where the supplier has a program of reuse or recycling);
(p) The measures to minimise noise and other amenity impacts from mechanical equipment and demolition/construction activities, especially outside of daytime hours;
(q) The provision of adequate environmental awareness training for all contractors and sub-contractors on the land; and
(r) Measures to protect the stormwater drainage system so that no solid waste, sediment, sand, soil, clay or stones from the land enters the stormwater drainage system.
Before the development starts, a landscape plan to the satisfaction of the Responsible Authority must be submitted to and approved by the Responsible Authority. When approved, the landscape plan will be endorsed and will then form part of the permit. The plan must be drawn to scale with dimensions and three copies must be provided. The plan must be generally in accordance with the plan by Michael Smith and Associates (Landscape development Plan - Rev A) but modified to show:
(a) A landscape proposal, including canopy trees, for the new garden spaces created by the deletion of four car spaces in accordance with condition 1
(b) A survey (including botanical names) of all existing vegetation to be retained and/or removed;
(c) Buildings and trees (including botanical names) on neighbouring properties within three metres of the boundary;
(d) Details of surface finishes of pathways and driveways;
(e) A planting schedule of all proposed trees, shrubs and ground covers, including botanical names, common names, pot sizes, sizes at maturity, and quantities of each plant;
(f) Landscaping and planting within all open areas of the site;
(g) an in-ground irrigation system to all landscaped areas;
All species selected must be to the satisfaction of the Responsible Authority.
Before the use starts, the landscaping works shown on the endorsed plans must be carried out and completed to the satisfaction of the Responsible Authority.
The landscaping shown on the endorsed plans must be maintained to the satisfaction of the Responsible Authority, including that any dead, diseased or damaged plants are to be replaced.
Before the development (including demolition and any site works) starts, a tree protection fence must be erected around the Tree Protection Zone (or as close as practicable to this zone) of each street tree and any neighbouring tree within 5.0m on an abutting site. The fence must be constructed of star pickets and chain mesh or similar to the satisfaction of the Responsible Authority. The tree protection fence must remain in place until construction is completed. During the construction of the development, the ground surface of the Tree Protection Zone must be covered by a 100 mm deep layer of mulch and watered regularly to the satisfaction of the Responsible Authority.
Unless with the prior written consent of the Responsible Authority, the following must not occur within the Tree Protection Zone:
(a) Vehicular or pedestrian access;
(b) Trenching or soil excavation;
(c) Storage or dumping of materials, tools, equipment or waste.
This permit will expire if one of the following circumstances applies:
(a) The development is not started within two years of the date of this permit;
(b) The development is not completed within four years of the date of this permit; or
(c) The use does not commence within five years of the date of this permit.
The Responsible Authority may extend the periods referred to if a request is made in writing before the permit expires or within six months afterwards if the use or development has not yet started, or within 12 months afterwards if the development has lawfully started before the permit expires
[1] Mullum Mullum Road would be classified as a Connector Road - Level 2 under the provisions of clause 56 of the Planning Scheme.
[6] In the actual medium neutral citation for this case there is a misspelling of the word Bayside, it is misspelt Baside.
[7] Both schools occupy very large sites, because of the topography neither school is accessed from Mullum Mullum Road, rather, the primary school is accessed from Panfield Avenue and the high school is accessed from Byron Street. Both the streets are more minor local streets.
[8] P Petzierides v Hobsons Bay CC [2012] VCAT 686
Charbrow Pty Ltd