[2009] VCAT 1553
Victorian Civil and Administrative Tribunal
2009-08-06
Original judgment source is linked above.
Which list of inclusions comprises the contract inclusions - whether initials forged - Briginshaw principle applied.
Charant Developments Pty Ltd v Nguyen & Anor (Domestic Building) [2009] VCAT 1553
We are currently in dispute with our client since they have brought into play another list of specifications signed only by them. They are denying that the specifications we have signed by both them and us as builder is the one in play, which has now come to a head at the selection of their door handles. We need to resolve which list of inclusions/specs is the one on foot and hence binding of the two parties. [sic]
The questions to be put to the expert were drafted by the parties' legal representatives.
Which list of inclusions comprises the contract inclusions?
'in the form of a cover page, a copy of numbered pages 4 to 14 of the standard HIA Victorian New Homes Contract, together with a four page document entitled "Architectural Complete Inclusions" being a List of Inclusions forming part of the Building Contract'.
It was Charles who dealt with us, even when signing the contract on the 1st of May 2006 [7], you were not there either, only Charles was there, there were two piles of paper on the table. One pile consisted of photocopy of page 4-14 of the standard HIA contract, the other pile was the list of inclusion prepared by Charles for us to sign. The first pile was already pre-signed and pre-init by you guys, Charles asked me to init every pages, I and Thao signed and init the first pile and init pages of the second pile. Charles brought the 2 piles upstairs then came down and gave us a photocopy of the 2 piles of paper stapled together. This was the contract that I accepted from him. (sic)
The SPECIFICATIONS include 4 pages that were prepared and supplied by Charant Developments P/L [emphasis added].
The suggestion by counsel for the builder, that it was not until August 2008 that Mr Nguyen realised the detriment of agreeing that he had initialled page 4, is compelling. The copy of the contract which Mr Nguyen has exhibited to his first affidavit does not include his initial on page 4. However, this is a photocopy and noting that the initials 'QT' appear below the initials 'CM' on every other page of the contract, it is not inconceivable that the initials 'QT' 'dropped off' when page 4 was copied. I am unable to determine what exactly happened: and if 'QT' did 'drop off' when page 4 was copied, whether it was when the contract was copied by Mr Merola or at some later time, or whether it was inadvertent or deliberate. In any event, no mention is made until August 2008 of there being any dispute about the initials on page 4.
Therefore medium is at the lower end of the scale. His evidence was that he had found medium support partly because of the limited material he had been asked to examine. He had been provided with 15 samples of Mr Nguyen's initials. He said he would have preferred a sample size of 20 or 40 specimen initials, although sometimes, he finds, 4 or 5 specimens are sufficient for a definitive opinion.
But reasonable satisfaction is not a state of mind that is attained or established independently of the nature and consequence of the fact or facts to be proved. The seriousness of an allegation made, the inherent unlikelihood of an occurrence of a given description, or the gravity of the consequences flowing from a particular finding are considerations which must affect the answer to the question whether the issue has been proved to the reasonable satisfaction of the tribunal. In such matters "reasonable satisfaction" should not be produced by inexact proofs, indefinite testimony, or indirect inferences. (emphasis added)
[T]he strength of the evidence necessary to establish a fact or facts on the balance of probabilities may vary according to the nature of what it is sought to prove.
'to copy onto a computer disc directly from his computer an updated list of inclusions so that I could take the computer disc home and add amendments that I had discussed with Charles that day'.[3].
He was unable to explain why no properties were recorded next to 'accessed'. Further, he was unable to explain why the 'modified' time was early afternoon, rather than in the evening when he said he had copied the document onto his USB key. This adds to the confusion about times - the document properties for 'QN2' as shown on 'QN3' reveal the document was modified on 27 April 2007 10:41:15AM, an hour and a half after it was apparently sent by the builder, yet the document properties for 'QN4' which Mr Nguyen says he copied from the builder's computer in the evening of the same day, so at least 6 or 7 hours later record - it was modified at 27 April 2007 1:51:52 PM - approximately 3 hours later.
Inexplicably the covering email is not exhibited nor has it been tendered in evidence. For someone who is as careful and particular as Mr Nguyen it is difficult to believe that he would have retained a copy of the emails from the builder, but not a copy of this very important email.
As the internal time clock of a computer can be changed manually, the date and time stamps on the files provided on a CDROM can not be relied upon. The original computer and the USB thumb drive containing the original file and the email should be used to verify any date and time stamps.
The builder did not take advantage of Mr Nguyen's offer to make his work computer, on which he said the relevant emails and documents were stored, available for testing.
As stated previously, it would be necessary to forensically examine the original computer and thumb drive to identify how many documents have been created, and from those, which document is represented in the email. In additional, the MD5 value would be used to identify the relevant and original file attached in this matter.
I do not consider his evidence assists me in determining the preliminary question.
Which list of inclusions comprises the contract inclusions?
...when the time came to order door handles I recalled that the male Respondent's document had a detailed list of door fixtures and fittings. I thought this might assist me when ordering door fixtures and fittings.
On 13 May 2008, I took the male Respondent's document to Architrend, a supplier and learnt that the specification of door handle in the list of inclusions prepared by the male Respondent would cost $400.00 each and required a great deal of additional labour. The allowance in the Building Contracts (sic) was for a door handles from the Architrend Lever range at a cost of $80'[4]
The owners' list of inclusions includes a detailed specification for door handles in each room.
[1] Witness Statement of Charles Merola sworn 12 December 2008 para 5(u)
[2] Briginshaw v Briginshaw [1938] HCA 34; (1938) 60 CLR 336
[4] Witness Statement of Charles Merola sworn 12 December 2008 para 5
Charant Developments Pty Ltd
Nguyen & Anor
(1959) 101 CLR 29
(1938) 60 CLR 336