austlii:qld/QBCCMCmr/2025/204
General information, not legal advice.
QBCCMCmr
2025-06-12
Original judgment source is linked above.
Body Corporate and Community Management Act 1997 (Qld) (Act), sections 227(1)(b) and 229(3)(a)
IMPROVEMENT TO COMMON PROPERTY - whether lot owners are required to undertake works or other steps relating to improvements to common property; REASONABLENESS - whether committee acted reasonably in making decisions to preclude lot owners from proceeding with maintenance works to improvements.
a) remove the expanded polystyrene type of combustible cladding (EPS Cladding also known as Type I Cladding) that is installed as the uppermost component of the roof-like structures (Pergolas) installed on the balconies of Lots 33 and 34, and > > b) install new gutters for the Pergolas, properly affixed to the common property wall.
a) common property elevators, subject to reasonable conditions relating to times of use, protection from and indemnification for damage (which conditions are to be consistent with those imposed previously by the body corporate on other owners), and > > b) other areas of common property as described and for the periods indicated in the Safer Building Group (SBG) document titled "site lay-out and exclusion zone" (included as attachment 7b to the application).
The owners of Lots 33 and 34 have accepted the cost of the replacement of the Type 1 cladding is their responsibility from the outset. They have also offered to pay the cost of the replacement gutter to expedite the commencement of the work. They have been trying to commence the rectification works for the replacement of the Type 1 cladding for almost 2 years, but the Body Corporate Committee continuously blocks this request. Every time the Body Corporate Committee's current requests are completed, the Committee alter their position as to the requirements needing to be satisfied with new requests. On numerous occasions, the owners of Lots 33 and 34 have requested meetings to discuss the matter, but they do not receive a reply from the Committee or even acknowledgement of the meeting request. The Committee has failed to act reasonably in dealing with this matter.
(i) are not satisfied that the proposed scope of works satisfies the conditions of the 2023 Re-Approval of the Pergolas > > (ii) are of the view that the development approval (DA) issued by the council was based on an application that was not properly made because the body corporate has not consented to the improvements > > (iii) are not satisfied that the applicants' nominated builder SBG and its subcontractors hold the appropriate QBCC licenses > > (iv) are concerned the works only propose to remove the EPS Cladding but do not include removal of the ACP Cladding and the Glazings on level 9 > > (v) require the applicants to deal with the ACP Cladding either by removing it or, if it is to be retained then the applicants must have the retention certified as a performance solution so that the building can be removed from the AB Register > > (vi) require the applicants' building certifier to undertake to provide a Form 29 upon completion of the works and confirm that, if the ACP Cladding is to remain, that option is a performance solution endorsed by the Queensland fire services > > (vii) are not satisfied that the structural issues with the Pergolas can be properly inspected, rectified, and certified without complete removal of all cladding, and > > (viii) require hydraulic calculations for and detailed drawings of the proposed guttering and downpipe works so owners know what is proposed and to alleviate concerns about the impact on common property storm water systems
Order 2 - Access to Common Property to facilitate Rectification Works
(i) a furniture fire on level 9 could ignite the ACP Cladding and may spread to the EPS Cladding above and then to level 10 above, which defeats one aspect of the fire safety strategy - capacity for fire growth - for the building (p52-56 at 4), and > > (ii) even though the ACP Cladding is not expected to propagate fire beyond the source, it may ignite the EPS Cladding above. A fire involving both types of cladding is likely to contribute to vertical fire spread to the lot on level 10, which also defeats the "compartmentation" aspect of the building's fire safety strategy. (p56-57 at 6)
[85] ... the 2023 Re-Approval had the effect of re-authorising the Improvements with the added condition the respondents were also required to remove the Cladding (aka the "Awning") that was posing a fire risk. (emphasis added)
[93] ... an expert provided the parties with 3 options to rectify the [fire safety] issues with the Cladding, and a detailed scope of works for each. The [owners of Lots 33 and 34] advised the committee they preferred Option C, to remove and replace the Cladding with an alternative material.
[99] ... I do not agree with the body corporate that ... the Rectification Works [to the Pergolas] required a new authorisation under section 187 of the Standard Module or otherwise.
[103] ... no new authorisation was required for the works [to the Pergolas] because the replacement of the Cladding (with a safer material) and new guttering (to restore the gutters to a functional state) were maintenance works.
Part 2 - Decisions about the Rectification Works
In my view, the committee has not acted reasonably in making this decision. I am satisfied that the committee did not adequately consider the inherent rights of the owners of Lots 33 and 34 to use the common property and the fact the committee has routinely permitted others to use the common property for transporting and storing renovation materials. Nor did it adequately consider that the Scope of Works Plan provided by the applicants' builder on 3 September 2024, and supplemented on 4 October 2024, included a picture showing exclusion and staging areas, a detailed plan of access requirements, a projected time line for various aspects of the works, and expressly offered to be flexible in timing and to co-ordinate with the committee.[17] Finally, I am not satisfied the committee considered the additional expense to the applicants that would be incurred if the committee denied permission to use the lift.
At its budget committee meeting of 1 May 2025, a proposed budget included an item to undertake the design, specification, tendering and delivery of new downpipes including connection into the existing basement infrastructure.
Should this budget and expenditure motion be approved at the AGM the matter of the downpipes can be removed from the dispute.
Part 3 - Decisions relating to the Disputed Works
b) That any infrastructure (including associated electrical work if applicable) be installed by a qualified and registered tradesperson, using proper materials and in accordance with any legislative requirements. (emphasis added)
Did the committee act reasonably in making decisions?
[1] See Carlisle [2024] QBCCMCmr 209. For ease of reference and consistency, I have endeavoured to use the capitalised terms from that First Order. I will also use common abbreviations for the Queensland Building and Construction Commission (QBCC) and the National Construction Code (NCC).
[2] Lot 33 can be described as a sub-penthouse lot, with Lot 35 above, the penthouse lot. I will refer herein to Lot 33 as being on level 9.
[6] The sub-parts of the first order sought defines what is and is not meant by the "Rectification Plan" and the "Rectification Works." As an alternative to the first order sought, the applicants seek an order that the Rectification Works are carried out in accordance with a "Performance Solution" complying with the National Construction Code Governing and Performance Requirements at the body corporate's cost.
[7] I have only seen evidence of informal committee decisions. I do not believe copies of post-First Order minutes of formal resolutions made by the committee about the Rectification Works have been provided.
[8] See First Order at [61] - [69]
[9] See BFSRA Report at 3.1 describing the legislative amendments and obligation to "assess the materials used on the external walls of their buildings in accordance with the QBCC guidelines."
[10] The BFSRA Report, however, concluded that no additional immediate action is required until remedial works and/or a further fire engineering assessment were completed. (p64 at 6.5.1)
[11] There were also questions raised whether the Pergolas were effectively an exclusive use of part of common property requiring body corporate approval for an exclusive use by-law to attach to the lot.
[12] See First Order at [135]. I note that the concluding remarks are commentary to the First Order.
[13] I also commented that the owners of Lots 33 and 34 remained obligated to maintain the Pergolas and comply with the conditions of approval notwithstanding the current lack of an exclusive use by-law. See First Order at [136] - [137]
[17] SBG Scope of Work Plan for Awning Replacement at "Access Requirements"
[18] See Committee response to Adjudicator dated 8 May 2025, at 11
[20] See also https://www.housing.qld.gov.au/initiatives/safer-buildings/managing-combustible-cladding-in-queensland at 3 (Although it is strongly recommended that buildings are rectified, "[t]here is currently no deadline for private buildings owners in Queensland to rectify their buildings.")
[23] See Body Corporate For Beaches Surfers Paradise v Backshall [2016] QCATA 177 (Beaches) at [34]
[24] Id. at [23] citing Acts Interpretation Act 1954 (Qld) s 32 and SZLGP v Minister for Immigration & Citizenship [2008] FCA 1198 at [15] - [16]
[27] Id. at [45] citing Khan v Minister for Immigration and Ethnic Affairs [1987] FCA 457; (1987) 14 ALD 291, 292 (Gummow J)