austlii:qld/QBCCMCmr/2025/116
General information, not legal advice.
QBCCMCmr
2025-04-03
Original judgment source is linked above.
Camden [2025] QBCCMCmr 116
Body Corporate and Community Management Act 1997 (Qld) (Act), sections 227(1)(a) and 229(3)(a)
PROPERTY DAMAGE - where water leaked into the applicant's lot - whether caused by the respondents' failure to maintain - whether respondents are responsible for repairing the leak and reimbursing the applicant for damaged property.
The statutory duty imposed ... is one which obliges it to remedy any defect as soon as any of the building parts covered by the duty fall into disrepair or were not operating properly. Failure to do so, once aware, gave rise to a breach of its duty.
The outcome is there are two leaks between the existing 40mm pipe work and the puddle flange fitted by the water proofer. One leak is the join between the puddle flange and pipe work and the other, just slightly lower on the glued reducer between the 40 and 50mm pipe work. I believe that the pipe work going up into the floor penetration should be removed and a new section fitted with water tight joints and then tested.
(1) You located two leaks between the existing 40mm utility shower drain pipe work and the new puddle flange fitted by the builder's water proofer and/or plumber as part of the shower renovations.
(2) The first leak was a major leak from around the connection of the new puddle flange into the 50mm drain pipe. This was the cause of the large volume of water that escaped during your test. This was only able to occur because there was no waterproof seal or connection between the puddle flange outlet and the utility 50mm drain pipe. This is because of faulty workmanship by the builder's subcontractors.
(3) This leak was only apparent because there was a blockage or partial blockage in the drain pipe and the U-bend it connected to. When water backed up to the point that it was above the top of the 50mm drain pipe it then overflowed through the unsealed connection with the puddle flange and spilled down the outside of the pipework into the garage where some of it was caught in a number of buckets.
(4) If the puddle flange had been connected properly water would have pooled in the ensuite shower and it would not have flooded into the garage below. In that respect it was the faulty puddle flange connection that caused the major leak and damaged the items in the garage below. This makes it the responsibility of the owner, the builder and his subcontractors to fix.
(5) When you cleared the blockage, you were not able to retrieve any of the material that caused it. This indicates that it was not the normal mixture of hair, grease, fat, oils etc. that one normally expects.
(6) You were unwilling to say with 100% certainty in your report exactly what the blockage material was. However would you agree that, given your many years of experience, the fact that the blockage material was not able to be retrieved by your tool but could be broken up, the fact that the shower had just been renovated with new waterproofing and tiling, and the appearance of the collected material when the leak test was done, that by far the most likely cause of the blockage would be either concrete rubble from the demolition of the original tiling and / or tiler's screed which had fallen into the pipework during tiling?
(7) The PVC drainage pipework in the garage of unit 11 only services the ensuite of Unit 2. There is no way the blockage material could have got into the system except via one of the waste pipes in the ensuite. That is from the floor waste, shower waste or wash basin waste pipes.
(8) Given that there were no leaks from the shower prior to the renovations commencing it seems to be the case that both the faulty flange installation and the blockage were both caused by the renovation.
(9) After the blockage was cleared a small leak of about one drop every seven seconds was noticed from the step-down join from the 50mm pipe connecting to the puddle flange and the 40mm pipe which runs to the U-bend. Considering there was no leak in this location before the renovation work commenced, I believe it must have occurred during the renovations.
I completed the internal waterproofing to the wet area in unit 2's ensuite, the work included removal of the old shower waste and insertion of a new compliant puddle flange into existing pipework (Plastec brand). The puddle flange installed was a push-fit installation that is inserted directly into the PVC pipework, it doesn't require to be glued into pipework to create a watertight join, the rubber grommet creates the watertight seal.
a) Concrete dust and rubble were allowed to fall into the ensuite waste utility drainpipe during the removal of the original shower drain, the demolition of the old ensuite's tiling floor and the shower's tile base.
b) Tiler's screed of a concrete and sand mix was allowed to fall into the ensuite waste utility drainpipe during the tiling of the ensuite's new shower bed.
(5) When you cleared the blockage, you were not able to retrieve any of the material that caused it. This indicates that it was not the normal mixture of hair, grease, fat, oils etc. that one normally expects.
(6) You were unwilling to say with 100% certainty in your report exactly what the blockage material was. However would you agree that, given your many years of experience, the fact that the blockage material was not able to be retrieved by your tool but could be broken up, the fact that the shower had just been renovated with new waterproofing and tiling, and the appearance of the collected material when the leak test was done, that by far the most likely cause of the blockage would be either concrete rubble from the demolition of the original tiling and / or tiler's screed which had fallen into the pipework during tiling?
[1] Section 227 and 228 of the Act
[3] Also now known as a building format plan of subdivision
[4] Sections 48C and 49C(4) of the Land Title Act 1994
[5] Section 180(1) of the Standard Module
[6] Section 20 of the Act
[7] Section 180(3) of the Standard Module
[8] Section 211(3) of the Standard Module
[9] Section 211(5) of the Standard Module
[10] Section 187(1) of the Standard Module
[11] Section 187(4) of the Standard Module
[12] Searles DCJ in Klinger & Anor v. Body Corporate for Costa D'Ora Apartments [2007] QDC 300 at 67
[13] Brereton J in Seiwa Pty Ltd v The Owner's Strata Plan 35042 [2006] NSWSC 1157, at para 4 and 5, cited in Magog (No.15) Pty Ltd v The Body Corporate for The Moroccan [2010] QDC 70 at 83 and 84
[14] Brereton J in Seiwa Pty Ltd v The Owner's Strata Plan 35042 [2006] NSWSC 1157, as cited in Magog (No.15) Pty Ltd v The Body Corporate for The Moroccan [2010] QDC 70
[15] See for example, Paperbark Buderim [2023] QBCCMCmr 106 at 81-88