austlii:qld/QBCCMCmr/2025/429
General information, not legal advice.
QBCCMCmr
2025-12-01
Original judgment source is linked above.
Liwen Xu as representative of NLM Pty Ltd (as Trustee) (applicant)
Body Corporate and Community Management Act 1997 (Qld) (Act), sections 227(1)(b) and 229(3)(a)
Body Corporate and Community Management (Accommodation Module) Regulation 2020 (Accommodation Module)
INTERIM ORDER - whether an interim order stopping the body corporate from acting on potentially invalid motions is warranted.
THAT the Body Corporate engage John Lyng Strata Services as per quotation JSTQ05535 at the cost of $34,836.95 (excluding GST) to rectify the roofs of Lots 1, 19, 37, 65, 86, 89, 95, and 97 which were affected during Cyclone Alfred in March 2025.
THAT the Body Corporate engage AMJ as per quotation QT016705 at the cost of $29,240.00 (excluding GST) to rectify the roofs of Lot 60 which was affected during Cyclone Alfred in March 2025.
THAT the Body Corporate the Body Corporate engage Auswide as per quotation #306 at the cost of $23,901.90 (excluding GST) to rectify the roofs of Lot 60 which was affected during Cyclone Alfred in March 2025.
1. Order 1: A declaration that the Extraordinary General Meeting (EGM) scheduled for 2 December 2025 is void due to procedural irregularities and breaches of the Body Corporate and Community Management Act 1997 (the Act) and the Standard Module Regulation 2020 (the Regulation). > > 2. Order 2: If Order 1 CANNOT be made prior to 2 December 2025 and the EGM proceeds, if Motion 2, Motion 3.1 and 3.2 get passed during the EGM hold on 2 December 2025, a order to declare that Motion 2, Motion 3.1, and/or Motion 3.2 passed at the EGM are invalid. > > 3. Order 3: An order requiring the Body Corporate to disclose to all owners: > > o Full Fee-For-Service (FFS) charge details with descriptions of the fee issued by SSKB from 1 August 2025 to present; and > > o Transaction ledgers for all FFS-related payments; and > > o Confirmation that all owners retain lawful rights to access Body Corporate records under Act s205 and Regulation s221, without committee-imposed restrictions.
If Motion 2, Motion 3.1, or Motion 3.2 is passed at the EGM on 2 December 2025, an interim order is sought requiring the Body Corporate to suspend all works, actions, procurements, or commitments arising from these motions until final orders are made.
3.1.1. First final order sought - voiding of meeting as a whole
3.1.2. Second final order sought - validity of Motion 2
3.1.3. Second final order sought - validity of Motions 3.1 & 3.2
[3] SDW2 Pty. Ltd. V JLF Corporation Pty Ltd [2017] QSC 1 at [21].
[4] Beecham Group Ltd v Bristol Laboratories Pty Ltd (1968) 118 CLR 618 at [622-623].
[5] Australian Broadcasting Corp v O'Neill [2006] HCA 46; (2006) 227 CLR 57, at [65], [19].
[6] See, for a BFP subdivision, Accommodation Module ss 188 and definition of damage which includes storm at s 185.
[7] Accommodation Module s 162. Although, this is not the only factor that will determine whether the committee has the power to consider the proposal.
[8] Accommodation Module, Sch 1 Dictionary, definition of 'relevant limit for major spending'.
[9] Email dated 18 November 2025, page 56 of the application.
[10] If above the relevant limit for committee spending, it requires approval at a general meeting.
[11] Accommodation Module, ss 79, 163(7).
[15] In a BFP subdivision, the boundary is defined by structural elements and is located at the centre of a floor, wall or ceiling separating a lot from other lots or common property. See Land Title Act 1994, ss 48C, 49C. For discussion on where the boundary lies in different types of roofing structures see Sanmore Court [2025] QBCCMCmr 48 at [30-33].
[17] Accommodation Module, s 170(2)(b)(ii).
[20] Australian Broadcasting Corporation v O'Neill [2006] HCA 46; (2006) 227 CLR 57 at [65] citing Beecham Group Ltd v Bristol Laboratories Pty Ltd (1968) 118 CLR 618 at [5].
(2006) 227 CLR 57
(1968) 118 CLR 618