COSTS - An application made pursuant to cl 16(2) of Schedule 3 to the Building Act 1993 (the Act) by the adjoining owner for her costs of the proceeding to be paid by the Respondent or in the alternative by the Interested Party.
RESPONDENT Brent Williams (relevant building surveyor)
INTERESTED PARTY Deanne Bogusz (subject landowner)
RELEVANT MUNICIPALITY Port Phillip City Council
ADJOINING PROPERTY 110 Gladstone Street, Southbank
APPEALS BOARD An application for costs of and incidental to the proceeding pursuant to cl 16(3) of Sch 3 to the Act.
BEFORE Members Maynard (Chairperson), Irwin and Mulholland.
CITATION Butterfield v Williams [2025] VBAB 40
Having considered all the submissions and information placed before it, the Building Appeals Board (the BAB) determines that:
_______________________ ________________________
For the Respondent Ms R Hull, senior technical assistant
engineering detail for lateral support of adjoining structures during demolition and protection of footings during excavation works, civil drainage detail and a dilapidation survey of 110 Gladstone Street
In addition, she requested any plans, drawings or specifications that were not included with the protection works notice.
The proposed works outlined in the engineering plans 0466A REV B Dated 12/06/2024 and architectural plans CD 002 B Dated August 2023 will not undermine the integrity of the party wall. It must be noted that two beams will be supported onto the existing party wall which will involve removing a few bricks only on 112 Gladstone Street, Southbank side of the party wall. The beams will connect to the party wall as per the below details, which can also be found in the engineering plans.
Regarding the pad footings in the rear which run along the boundary line they pose a very minor risk of causing any damage to 110 Gladstone Street, Southbank as they are not in close proximity to the existing dwelling or it's footing structure. As per standard practice the builder must take all pre-cautions in maintaining the stability of the structure during construction and if plans are followed and carried out correctly the risk of damage to 110 Gladstone Street, Southbank is very low. It must be noted that all construction poses some form of risk but in this case the risk is deemed as very low.
The determination may include any order as to costs that the Building Appeals Board, on the application of a party to the proceeding, considers is just.
Unless the Building Appeals Board otherwise determines, a party to a proceeding before the Board must bear his, her or its own costs.
...It is clear from clause 17 that the Board does have power to make an order for costs. It establishes a general rule, namely, that there should be no order as to costs. But, it is clear that the Board may, in appropriate circumstances, refuse to follow the general rule and make an order for costs. One looks in vain to find any criterion to guide the Board when application is made to override the general rule and order costs.
However, in my opinion, the presence of the general rule requires that circumstances must be established to override the general rule, and that means something more than being a successful party.[2]
...The discretion must be exercised judicially, which means that the Tribunal must act fairly, impartially and by reference to relevant considerations and not arbitrarily, capriciously or by reference to irrelevant considerations and not in a manner that frustrates the legislative intent.
The Tribunal is a creature of statute and, on the question of costs, it commences from a different starting point. Usually parties must bear their own costs, which no doubt reflects the general object of the Act. That object ... is to promote access to justice generally and to minimise the overall level of costs in tribunal proceedings as far as practicable.[4]
a) The RBS failed to fulfil his responsibilities under the Act and exercise his independent judgment when he assessed that proposed protection work was adequate and made the Form 9 Determination. > > b) The Applicant was vindicated by the Board's determination and should not be out of pocket for asserting her legal rights. > > c) The Applicant was required to employ an engineer to show that the Form 9 Determination was deficient. > > d) The issues raised by the Applicant in relation to the protection work were not resolved prior to the Appeal which required the Applicant to complete the appeal process. > > e) If documents relied on by the RBS had been provided earlier, the Applicant could have had the documents reviewed by an engineer and could have potentially avoided the need for the Appeal to be heard. > > f) The Applicant seeks legal costs of $22,431.85, engineering fees of $1,285.53, application fee $376.24 and title and other search fees $196.93; the combined total being $24,290.55. The Applicant has supplied copies of invoices in support of her claim.
SUBMISSIONS OF THE RELEVANT BUILDING SURVEYOR (RBS) (in summary)
a) The fact that the Applicant was successful does not of itself justify an order for costs. > > b) He relied on a structural engineer's advice in issuing his form 9 determination. > > c) He was not required to list the documents he relied on in forming his determination as that is not a requirement of the prescribed form in Schedule 4 to the Regulations. > > d) That the Owner was seeking an expeditious hearing, had no effect on the protection work notice process.
a) The Owner detailed some of the frustration she had communicating with the Applicant and progressing her time-sensitive building work.
b) The Owner does not consider she can be held responsible for the actions of the RBS in carrying out his professional duties.
There is no scale of costs applicable to proceedings before the Board. Determining the appropriate quantum of costs is at the discretion of the Board, which will consider what is just in the circumstances. In rare cases, full indemnity costs might be ordered. However, there would need to be some egregious or contumelious conduct to warrant such an order...[6]
�Butterfield
Williams [2025] VBAB 40;