[2018] ACAT 117
ACT Civil and Administrative Tribunal
2018-11-20
Original judgment source is linked above.
BURTON & ANOR v ROJAS CONSTRUCTIONS PTY LTD (Civil Dispute) [2018] ACAT 117
Catchwords: CIVIL DISPUTE - compensation for defects and omissions in building work - whether the work was carried out in a proper and skilful way - whether defects were notified within the prescribed period
Legislation cited: ACT Civil and Administrative Tribunal Act 2008 s 48
Australian Consumer Law
Legislation: Australian Standards AS NZ S 3000:2000, AS1562.1, AS1562.2, AS 1562.1:1992
The Maintenance Liability Period is an opportunity for the home Owner to state, in writing, any minor Defects and/or minor omissions in the building Works. The Maintenance Liability Period starts after the date of Practical Completion and finishes within the time stated in item A14 of Appendix A (with a default of 90 calendar days). It is recommended that, if possible, the Owner provide the Builder with a single list of minor Defects and/or minor omissions (if any) towards the end of the Maintenance Liability Period.
Absence of a water pump associated with water tanks
In deciding whether building work has been carried out in a proper and skilful way, the following considerations must be taken into account:
22. Regulation 38 provides for the length of a builder's warranty as being a period of six years from the date of practical completion for structural elements and for a period of two years for non-structural elements.
(a) for residential building work in relation to a structural element of a building - 6 years after the completion day for the work; or
(b) for residential building work in relation to a non-structural element of a building - 2 years after the completion day for the work.
non-structural element, of a building, means a component of the building that is not a structural element.
structural element_, of a building, means - _
This Act does not limit the liability a builder would have to anyone apart from this Act.
Water pipes render manhole (in the hallway) inaccessible
Internal doors not painted top and bottom causing swelling
Roof trusses in the al fresco area not built in a proper and skilful way
Missing pump - rainwater tank not connected to the toilets or cold water taps in the laundry
MIN 4000 LT RAINWATER TANK 50% OR 100M2 OF ROOF AREA, WHICHEVER IS THE LESSER, IS CONNECTED TO AT LEAST THE TOILET, L'DRY COLD WATER AND ALL EXTERNAL TAPS, AS PER ACT TERRITORY PLAN.
(1) The parties to an application must bear their own costs unless this Act or another territory law otherwise provides or the tribunal otherwise orders.
(a) if the tribunal decides an application in favour of the applicant, the tribunal may order the other party to pay the applicant--
(ii) any other fee incurred by the applicant that the tribunal considers necessary for the application; or
This clause clarifies that when the Tribunal decides an application in favour of the applicant, it can award incidental costs of an application against the other party. Incidental costs may include application filing fees, business name search fees, subpoena filing fees and hearing fees.
Quantum awarded by the Tribunal to the Clients (including GST)
Absence of a water pump associated with water tanks
[2] The Builder's volume of documents - Tab 1
[3] Transcript of proceedings 10 September 2018 page 6 line 5
BURTON & ANOR