Catchwords: ADMINISTRATIVE REVIEW - Appeal from refusal to issue Certificate of Occupancy - whether prescribed requirements met - whether bushfire access precautions provided
Legislation cited: Building Act 2004 ss 34, 42, 66, 69, 151
Planning and Development Act 2007 s 133
Other Material
cited: Australian Standard 1170.1.2002 Structural design actions Part 1 - Permanent, imposed and other actions, table 3.3
Australian Standard 3959:2018 Construction of buildings in bushfire-prone areas, cl 5.5.1, 5.5.2, 5.5.4, s 6
Australian Standard 4654.1-2012 Waterproofing membranes for external above-ground use, Part 1: Materials
Australian Standards 4654.2-2012 Waterproofing membranes for external above-ground use, Part 2: Design and installation
National Construction Code 2016 Volume Two: Building Code of Australia Class 1 and Class 10 Buildings cl 3.1.2.0, 3.1.2.1, 3.1.2.2, 3.1.2.3, 3.1.2.4, 3.7.4.0, 3.8.1.3, 3.9.2.3
National Construction Code 2022 Volume Two: Building Code of Australia Class 1 and Class 10 Buildings pt H2D8
Planning and Development Regulation 2008 s 1.100A
Territory Plan 2008, 3.3 Single Dwelling Housing Development Code 2016 Rules R10, R11 and R12, 10.1 Suburb Precinct Maps and Codes, 13.1 Dictionary
Cases cited: Bolaram v Australian Capital Territory & Ors [2020] ACAT 108
Bolaram v Australian Capital Territory & Ors [2021] ACAT 64
prescribed requirements_, in relation to building work, means - _
_(a) if the building work involves handling asbestos or disturbing friable asbestos - the requirements of - _
(i) this Act; and
(ii) the Work Health and Safety Act 2011; or
(b) for any other building work - the requirements of this Act.[4]
(1) Building work must not be carried out except in accordance with the following requirements:
(a) the materials used in the building work must comply with the standards under the building code for the materials in buildings of the kind being built or altered;
(b) the way the materials are used in the building work must comply with their acceptable use under the building code for buildings of the kind being built or altered;
(c) the building work must be carried out in a proper and skilful way;
Note The considerations to be taken into account to decide when work is carried out in a proper and skilful way may be prescribed under the regulations (see s (2)).
_(d) for building work that requires building approval under division 3.3, the building work - _
(i) must be carried out in accordance with approved plans; or
(ii) if plans have not been approved for the building work - must not be carried out;
Neither the original building approval nor the amended building approval was validly issued in accordance with, respectively, section 28 and section 32 of the Building Act.[5]
_(1) The construction occupations registrar must issue a certificate of occupancy for building work that involves the erection or alteration of a building if, on application by the owner of the parcel of land where the building work was carried out, the registrar is satisfied that - _
(a) the building work has been completed in accordance with the prescribed requirements for the building work; and
(b) the building as erected or as altered is fit for occupation and use as a building of the class stated in the approved plans for that building work.
Note 1 If the building work only involved erecting part of a building, see s (3).
Note 2 Power to make a decision includes power to reverse or change the decision (see Legislation Act, s 180).
(2) If building work involving the erection or alteration of a building as completed is not strictly in accordance with the prescribed requirements for the building work but is substantially in accordance with the requirements, the construction occupations registrar may, on application made by the owner of the parcel of land where the building work has been carried out, issue a certificate that the building as erected or as altered is fit for occupation and use as a building of the class stated in the approved plans for that building work.
(2A) The owner of a parcel of land where building work was carried out may apply for a certificate under subsection (2B).
Note If a form is approved under s 151 for the application, the form must be used.
_(2B) The construction occupations registrar may issue a certificate in relation to a building that the building as erected or altered is fit for occupation and use as a building of the class stated in the certificate if - _
(a) the registrar is not satisfied on reasonable grounds that building work involving the erection or alteration of the building has been completed in accordance, or substantially in accordance, with the prescribed requirements for the building work; and
(b) the applicant has completed any certification process prescribed by regulation in relation to the building or building work; and
(c) the building, or building work, is not excluded by regulation from this subsection.
_(2C) A certificate mentioned in subsection (2B) in relation to a building must include a statement to the effect that - _
(a) the construction occupations registrar is not satisfied on reasonable grounds that building work involving the erection or alteration of the building has been completed in accordance, or substantially in accordance, with the prescribed requirements for the building work; and
(b) the giving of the certificate does not affect the liability of anyone to comply with the provisions of a territory law (including this Act) in relation to the building; and
Note See s 68 (Effect of certificates under div 5.1).
(c) part 6 (Residential buildings - statutory warranties, standard conditions, insurance and fidelity certificates) may not apply to the building work.
(3) If part of a building has been erected in accordance with the prescribed requirements so far as they relate to the part of the building, the construction occupations registrar may, on an application made by the owner of a parcel of land where the building is being erected, issue a certificate that the part of the building is fit for occupation and use as a part of a building of the class stated in the approved plans in relation to the building work.
(a) matters that must be considered by the construction occupations registrar in deciding whether a building is fit for occupation and use; and
(b) requirements that must be satisfied before a certificate of occupancy may be issued
The 12 items identified by the inspector and relied on by the respondent in his decision.
Item 2 and 3 Step Downs and draining provisions.
Item 12 Upper balcony constructed of particle board flooring.
[1] Bolaram v Australian Capital Territory & Ors [2020] ACAT 108 and Bolaram v Australian Capital Territory & Ors [2021] ACAT 64
[2] Territory Plan 2008, 13.1 Dictionary - 'Gross Floor Area': Gross floor area (GFA) means the sum of the area of all floors of the building measured from the external faces of the external walls, or from the centre lines of walls separating the building from any other building, excluding any floor area reasonably used and necessary solely for fixed mechanical plant, bicycle parking and associated end-of-trip facilities, and/or basement car parking
[3] The appeal decision in-part relied on the lack of front setback and was decided after the exemption was given. As the action was directed to the time that the stop notice was made this did not change the situation on appeal
[4] Building Act 2004 section 66 (emphasis added)
[5] Bolaram v Australian Capital Territory & Ors [2020] ACAT 108 at [63]
[7] Territory Plan 2008, 10.1 Suburb Precinct Maps and Codes - 'Lawson Precinct Map and Codes', OP1 - Lawson residential area, Figure 3
[8] Territory Plan 2008, 3.3 Single Dwelling Housing Development Code rule 10
[9] There are various editions of the NCC which may apply. In National Construction Code 2016, Vol 2: Building Code of Australia Class 1 and 10 Buildings, clause 3.7.4.0 page 289 is relevant, and it was the building code in force at the time of the building work undertaken by Mr Bolaram
[10] Australian Standard 3959:2018 Construction of buildings in bushfire-prone areas, clauses 5.5.1, 5.5.2, and 5.5.4
[11] Exhibit R1 dated 31 January 2023 - 'Email from Amelia Canavan re: Bushfire resistance of windows block 5 section 45, 7 Dawn Crescent, Lawson.'
[12] Ordinarily, the Code that applied when the Approval was given and work first started would apply. Here as we have found that the Certificate cannot be given, it would be important to take into account any changes to the Code since.
[13] It is in the National Construction Code 2016, Vol 2: Building Code of Australia Class 1 and 10 Buildings, in clauses 3.1.2.0-3.1.2.4 at pages 111-115. We accept that the version we were given applies.
[14] National Construction Code 2016, Vol 2: Building Code of Australia Class 1 and 10 Buildings, clause 3.8.1.3
[15] Australian Standard 4654.1-2012 Waterproofing membranes for external above-ground use, Part 1: Materials
[16] Australian Standard 4654.2-2012 Waterproofing membranes for external above-ground use, Part 2: Design and installation
[17] H2D8 of Volume 2 of the NCC 2022 (This is numbering in the 2022 version, but we see that as relevant in considering whether an Approval can now be given)
[18] Transcript of proceedings dated 25 August 2023, page 187 lines 23-29
[19] Tribunal documents dated 30 January 2023 - 'General Inspection Report Block 5 Section 45 Lawson - Inspection for Certificate of Occupancy and Use', page 57
[20] Australian Standard 1170.1:2002 Structural design actions Part 1: Permanent, imposed and other actions, Table 3.3 Minimum Imposed Actions for Barriers, pages 14-15
[21] Per National Construction Code 2016 Vol 2: Building Code of Australia Class 1 and Class 10 Buildings, clause 3.9.2.3
[22] Transcript of proceedings dated 24 August 2023, page 70 line 5-page 71 line 38
[23] Transcript of proceedings dated 24 August 2023, page 128 line 35-page 129 line 8
[24] Transcript of proceedings dated 25 August 2023, page 196 lines 34-39
[25] Transcript of proceedings dated 24 August 2023, page 72 lines 1-10
[26] Exhibit A1 - Combined photographs document and Staircase Engineering details documents dated 28 August 2023
[27] Tribunal documents No 5 dated 30 January 2023 - 'General Inspection Report Block 5 Section 45 Lawson - Inspection for Certificate of Occupancy and Use', pages 60-61
[28] Transcript of proceedings dated 24 August 2023, page 7 line 35-page 10 line 1; Submissions from the applicants - Part 1, not paginated - email correspondence between EPSD DA Coordinator and the applicant dated 11 May-5 June 2023; and Submissions from the applicants - Part 2, pages 397-399 - Email correspondence between applicant and Mr Trent Varlow dated 8-11 November 2023