Dwg No LHA-WD-12
· Angophora costata (AC), Eucalyptus haemastoma (THE) and Eucalyptus citriodora (EC) and Eucalyptus maculata (EM) plantings located between approximately 2 to 3.5 metres from buildings [balconies] on northern side of building 16. The middle Angophora is within 0.5 of a metre from a brick wall.
· Magnolia grandiflora (MG) plantings are located mass-planted in small courtyards and under balconies located on the north side of building 16. These are large trees.
Dwg. No. LHA-WD-11
· Acmena smithii (medium to large trees) are double planted within small courtyard areas located to the north of building 15A.
Dwg No LHA-WD-7
· The street trees to the north of building 14B (GSH-Gleditsia "Shademaster") are planted over or very near the plenum around this building.
· The Elaeocarpus reticulatus (ER) and Acmena smithii (AS) to be planted above the cut to the east of building 14B will not achieve their potential as their cultural requirements (protected location, moist heavier soils and semi-shaded when young) will not be met.
· There is doubt of the establishment into excavated sandstone, particularly on steeper sections, of the balance of the Elaeocarpus reticulatus (ER) and Acmena smithii (AS) to be planted to the east and south of building 14B.
4. This landscaping plan is to be submitted by a suitably qualified landscaping or horticultural consultant who shall include the following information: -
ii. Details of all proposed surface treatments and method of mulching and weed control;
iii. Full details of finishes proposed in respect of all retaining walls and other hard surfaces within the landscape area, it being noted that a high quality low maintenance finish of attractive appearance is required (e.g. stone or brickwork).
iv. Details of any fittings or structures proposed to be installed within the landscaped area, including fences, screen walls, children's playground equipment, seating, lighting, letterboxes, etc. it being noted that such should be designed as an integral part of the landscape scheme;
v. Details of sub-soil preparation, drainage and soil depths in all areas where landscaping is to be established over the concrete roof slab or subterranean parking basements (in this regard, a minimum soil depth of 300mm is required in such circumstances where grass only is proposed).
vi. Details of the location of the proposed service lines, including the extent of the proposed trenching and associated works.
5. A design for a pedestrian link path through the site to the Epping Road underpass, together with a timetable for construction of that path, shall be submitted to Council for their approval. Such design to make provision, if necessary, for the location of the detention basins B&C, while they are in place. The link must be designed as both a meandering ramp for easy access, and as steps and path. Lighting is to be provided along the pathway and included in the design. The design and timetable shall be submitted to Council within 28 days of the date of this consent and timetable
6. A design for an energy dissipator and scour protection for the discharge of stormwater from the stage 3 site into Council's reserve from Pit A1-4 is to be submitted and written approval obtained from Council. Such design is to include channel lining for 50 metres from the headwall A1-5.