Domestic building work - Building Act 1993 - s.137B and s.137C - implied warranties in contract of sale by owner-builder as to the quality of the work - footings failure caused by drying action of tree roots - consequential damage to internal finishes - trees not present when slab constructed - very small trees planted outside boundary by council before construction completed - nature of warranties implied by the Act - building work not defective at time of construction - builder not responsible for trees - jurisdiction - s.53 Domestic Building Contracts Act - claim for breach of warranty a domestic building dispute within meaning of Act
Bestawaros v Sorace (Building and Property) [2016] VCAT 1005 (17 June 2016)
(a) the Builders warranted that all domestic building work carried out in relation to the construction, by them or on their behalf, of the House was carried out in a proper and workmanlike manner;
(b) the Builders warranted that all materials used in the domestic building work were good and suitable for the purpose for which they were used and that, unless otherwise stated in the contract, those materials were new; and
(c) the Builders warranted that the domestic building work was carried out in accordance with all laws and legal requirements including, without limiting the generality of the warranty, the Building Act and the regulations.
(a) obtaining and providing to them a report concerning the House from a prescribed building practitioner;
(b) providing them with a certificate of insurance; and
(c) setting out in the contract the warranties implied by s.37B of the Building Act.
Non-compliance with section 137B of the Building Act
plus costs solely relating to the west paving $ 875
Proportion relating to the gradient issue $4,397.50
Proportion relating to the settlement issue $4,397.50
plus costs solely relating to the south paving $ 8,160
"Thereafter, there are secondary effects in that when that side of the building drops so does the support for the trusses. They then drop down as well placing load onto the walls between the large corridor and bedrooms to the ensuite and bedroom 3. The effect is that the ground floor wall underneath is not exactly underneath the upper level wall, therefore the extra load pushes the floor joists down. Worse is that these floor joists cantilever out over and thereafter the tips of them are lifting by this action.
The second effect which is even bigger is that the plain pure mechanical situation of the wall adjacent to the corridor is probably not moving a great deal, whereas the wall on the outside (i.e. west) drops 20 mm. The pivot point internally does not move and the tip of the cantilever goes up approximately 7 mm."
Remove carpet in master bedroom, adjust floor joists and refit $2,613
"The wall, floor and roof cracks survey in this report are as a result of footing rotation and settlement. This footing movement has been caused by a combination of the following issues:
a the effect of nearby trees on the foundation supporting the footings
b the grading of paving located against the building."
The support of steel support posts in the fabric of the House
Cost attributable to settlement of west wall $44,690.57
Internal repairs related to settlement of west wall $44,690.57
Pavement replacement related to underpinning $ 4,397.50
Add profit and supervision at 30% $11,288.25 $48,915.75
Half Cost of Replacement of paving on West side $ 4,397.50
Proportion of losses due to settlement of west wall $14,774.84
Bestawaros