[2025] NSWCATCD 39
General information, not legal advice.
NCAT Consumer and Commercial
2025-06-03
Original judgment source is linked above.
(1) Exhibit "A": Letter dated 27 August 2024 of Bright & Duggan, strata agent, consenting to appointment as strata managing agent of SP48055 pursuant to s.237 of the SSMA, tendered by the Applicants; and
(2) Exhibit "1": Annual financial statements of SP48055 for the period 1 November 2023 to 31 October 2024, tendered by the Respondent.
(1) The lift;
(2) The pool;
(3) General maintenance;
(4) Governance dysfunctions;
(5) Accounts;
(6) Levies;
(7) Insurance;
(8) Roof; and
(9) Garbage compactor.
(1) No self-closing gate to the swimming pool area;
(2) The hinges on the swimming pool barrier access gate were incorrectly positioned;
(3) The internal barrier fence was less than 1200mm in height;
(4) The internal structural elements of the pool area appear to be in an unsafe condition due to severe corrosion;
(5) Gaps between the bottom of the swimming pool barrier fence panels and ground level exceed 100mm;
(6) Vertical openings within the swimming pool barrier fence exceed 100mm;
(7) There are climbable items along the outside of the barrier which breached the 900mm non-climbable zone to protect young children; and
(8) The metal bracing and light switch, which are both climbable items, are located within 900mm on the outside of the swimming pool internal barrier fence.
(1) The door in the garden leading to the swimming pool heaters was not secured, it banged in the wind, and was removed during a storm. The door has never been repaired or replaced;
(2) Rubbish is constantly left on the common property from passing members of the public, largely constituting food remnants, garbage and cigarette butts;
(3) The building is dirty and metal doorframes have rusted or corroded in the salt environment of a beach-side suburb;
(4) Painting of the concrete pillars in the external of the building (other than the brickwork), has not been undertaken for a number of years; and
(5) Timer lights for the entrance to the building have not been adjusted for daylight saving for years, leaving the entrance dark until after 8.30pm which creates an unsafe entrance and a potential safety hazard.
(1) The state of disrepair and abandonment of the amenities block notwithstanding numerous attempts to obtain quotes and estimates for repair work;
(2) The lack of any funds, including capital works funds, and a 10 year capital works plan, to attend to the maintenance and repair work that needs to be done;
(3) The governance deficiencies in failing to call AGM's, circulate financial statements or increase levies commensurate with the repair and maintenance requirements of the Respondent;
(4) The failure to attend to a lift replacement or refurbishment either in part or at all over a five year period; and
(5) The constant rotation of strata managing agents, which is itself both a cause and result of the governance dysfunction in the Respondent.
(1) Pursuant to s.237(1)(a) of the Strata Schemes Management Act 2015 (NSW), Bright & Duggan Pty Limited are to be appointed as strata managing agent to exercise all the functions of the owners corporation of Strata Plan No. 48055 at Maroubra NSW 2035, for a period of 12 months from the date of these orders upon the terms and conditions set out in the Strata Management Agency Agreement, a copy of which was tendered at the hearing attached to the letter and is Exhibit 'A' under covering letter dated 27 August 2024; and
(2) A copy of this order is to be served by the Respondent on Mr Phillip Court, Chief Operating Officer, Bright & Duggan Pty Ltd and on the registered proprietors of each lot in Strata Plan No. 48055 within 3 days of today's date.
I hereby certify that this is a true and accurate record of the reasons for decision of the Civil and Administrative Tribunal of New South Wales.
Berger
The Owners �e" Strata Plan 48055 [2025] NSWCATCD 39;