JUDGMENT on sentence
Background
Consent orders made on 4 March 2021
Chronology
Applicant's Evidence
Respondent's Evidence
Council's submissions
Pergola at ground level has been removed in accordance with drawing no. A04 Order 1(a) 2 August 2021
The rear first floor balcony enclosure has been removed in accordance with drawing no. A09 Order 1(a) 2 August 2021
The roof above the first-floor has been demolished in accordance with drawing no. A08 Order 1(a) 2 August 2021
Internal works - except that the rear wall on the first floor had been constructed with lightweight cladding material and no window had been constructed in bedroom 3. Order 1(a) and Order 1(b) 2 August 2021
(See also Works that have been completed not in accordance with the Consent Orders point 1)
Concrete kerb on the rear boundary has been constructed Order 1(d) and the agreed detailed stormwater plans required by Order 2 Annexure E, Condition 3 2 August 2021
Works/actions that have not been completed.
The kitchenette along the western wall of lower-ground floor has not been demolished as required by drawing no. A04 Order 1(a) 2 August 2021
The internal opening between the rumpus room and the stairwell had not been constructed as shown on drawing A04 Order 1(a) 2 August 2021
The brick balustrade around the enclosed balcony area had not been removed and the proposed sheet metal roofing had not been removed and the proposed sheet metal roofing has not been built as required by drawing No. A08 Order 1(a) and 1(b) 2 August 2021
The 1500L rainwater tank required to be installed for the granny flat at the rear of the property has not been installed Order 1(d) and the agreed detailed stormwater plans required by Order 2 Annexure E, Condition 3 2 August 2021
There is no evidence of rainwater harvesting or first flush devices for the main dwelling or the granny flat have been installed Order 1(d) and the agreed detailed stormwater plans required by Order 2 Annexure E, Condition 3 2 August 2021
Landscape area in the rear yard of front dwelling is not in accordance with landscape area in plan B2. Plant screening shrubs are not supplied in the deep soil area on the western side of property Order 1(c) 1 September 2021
Deep soil area in rear yard of secondary dwelling is reduced due to the construction of concrete structure not in accordance with stormwater plans Order 1(c) 1 September 2021
Rainwater tanks located parallel to the front boundary are not in accordance with the Orders. As a result of the rainwater tanks there is insufficient space for the tree in the front setback to develop in adequate shape Order 1(c) 1 September 2021
Screening shrubs along western side setback of the rear yard cannot be planted as soil is unavailable Order 1(c) 1 September 2021
Planting required in the rear yard of the secondary dwelling has not been planted as required Order 1(c) 1 September 2021
Mr Zein has not provided Work as Executed Drawings prepared by a registered surveyor to Council Order 2 Annexure E, Condition 4 2 August 2021
Inspection and Certification by a practising Drainage Engineer detailing corrective/outstanding works have not been provided Order 2 Annexure E, Condition 4 2 August 2021
An application for a positive covenant covering the stormwater pump out system has not been registered Order 2 Annexure E, Condition 5 2 August 2021
Works that have been completed not in accordance with the Consent Orders
Internal works - except that the rear wall on the first floor had been constructed with lightweight cladding material and no window had been constructed in bedroom 3. Order 1(a) and Order 1(b) 2 August 2021
(See also Works that have been completed not in accordance with the Consent Orders point 1)
Rainwater tanks with 4000L capacity have been installed for the main dwelling. The tanks are not located in accordance with the stormwater plans. Rainwater tank was to be installed along the eastern side boundary but are instead along the front (northern) boundary Order 1(d) and the agreed detailed stormwater plans required by Order 2 Annexure E, Condition 3 2 August 2021
The abovementioned tanks were to be designed to discharge into a junction pit with sealed lid located within the front setback. Instead, the constructed pit is an open grate with a pump out to the street kerb and gutter Order 1(d) and the agreed detailed stormwater plans required by Order 2 Annexure E, Condition 3 2 August 2021
A 1.0m wide concrete Dish Drain has been constructed as an overland flow path instead of the required 1.0m wide and 400mm deep Swale drain depicted in the Stormwater Plans Order 1(d) and the agreed detailed stormwater plans required by Order 2 Annexure E, Condition 3 2 August 2021
Swale planting as depicted in Stormwater plans has not been done. Instead there is a concrete structure that drains the water to the west of the property Order 1(d) and the agreed detailed stormwater plans required by Order 2 Annexure E, Condition 3 2 August 2021
Street trees have not been planted as specified in Landscape Plan. Trees have been planted in 45 litres pot size instead of 100 litres Order 1(c) 1 September 2021
Concrete slab under two 2000 litre rainwater tanks, reducing the landscape area present in the front setback - this is not in accordance with the orders Order 1(c) 1 September 2021
Respondent's submissions
Consideration
Seriousness of the contempt
Consequences of contempt
Awareness of contempt
Plea of guilty
Contrition and remorse
Personal antecedents
Good character
Deterrence
Even-handedness
Capacity to pay a fine
Conclusion on penalty
Costs
Orders
DISCLAIMER - Every effort has been made to comply with suppression orders or statutory provisions prohibiting publication that may apply to this judgment or decision. The onus remains on any person using material in the judgment or decision to ensure that the intended use of that material does not breach any such order or provision. Further enquiries may be directed to the Registry of the Court or Tribunal in which it was generated. Decision last updated: 17 April 2023
Bayside Council
Zein
(2013) 195 LGERA 14
(1999) 198 CLR 435
(1992) 26 NSWLR 309
(1986) 161 CLR 98
[1999] HCA 19