[2019] VCAT 774
General information, not legal advice.
Victorian Civil and Administrative Tribunal
2019-05-27
Mr J
Original judgment source is linked above.
A claim that the Respondents pay monies alleged to be owed by the former owners of the Respondents' Unit was abandoned at the hearing.
This was a claim for damages that the Applicant brought against a number of persons involved in the acquisition of the Applicant's Unit for the cost of rectifying defects in it that she said were present at the time of purchase including the Applicant's conveyancer and the vendor. She also sought damages in the same proceeding against Archicentre on the ground that she was not warned by Mr Woledge about the defects in the pre-purchase report he prepared for her. Her claim against these persons was settled for an amount of $30,000.00.
In this proceeding, the Applicant sought orders against the former owner of the Respondents' Unit, a Mr Bautista, in regard to water penetration.
Consequently, anything below ground level is common property.
He said there was limited access to inspect and maintain Rubble Pit 6.
Re-levelling of floors, repairs to blown render, repair to unlevel/twisted door frames, painting et cetera.
Packing and levelling the floors back to existing skirting, straightening centre to allow even flow across the rooms, removing and replacing stumps as required $30,600.00
[solid plaster] and patching all existing cracks $ 7,500.00
Making all windows and doors operational $ 2,150.00
Prepare seal, undercoat and paint all affected services $27,000.00
Clean up and remove rubbish on completion $ 3,000.00
"With the supplied information and the data gathered on site, it is the opinion of this office that the damage to the dwelling at 23 Turnbull Avenue [the Applicant's Unit] has been accelerated by plumbing issues at number 23A [the Respondents' Unit]. Whilst a dwelling of this age is expected to exhibit some degree of damage, the nature, severity and timing of damage coupled with the numerous drainage issues over time indicate the dwelling has experienced plumbing related subsidence.
Due to the additional groundwater from the leaks, the dwelling at number 23 has undergone differential settlement of its footings. This office believes that the western side of the dwelling has been most affected by the changes in moisture conditions in the foundation resulting in permanent subsidence. This has caused cracks to appear in the masonry walls and internal plaster and subsidence of the internal stumps. Door and window frames around the dwelling had become hard to operate."
"I woke to hear water from your place and checked the meter and it's not moving. I suspect it may be our friend from 20 Myrnong Crescent again! Can I come and look at the back to see if we can clinch where it's coming from."
The property at 20 Myrnong Crescent is at the rear of the Site.
"First-class drain cleaning inspected the drains with CCTV and most stormwater drains seem to be in quite good condition without any major problems, except for one downpipe near the kitchen window. This downpipe collects water from [both Units'] roofs. Due to the drain layout we are unable to get an exact location of where the drain goes, but it appears to be blocked and overflowing.
We recommended to owner of [the Respondents' Unit] to replace this drain which we believe is being undertaken as of today 29 May 2017."
Liability under the Owners Corporations Act
(a) properly maintain in a state of good and serviceable repair any part of the lot that affects the outward appearance of the lot or the use or enjoyment of other lots or the common property; and
(b) maintain any service that serves that lot exclusively."
Liability under the Water Act
(b) that flow is not reasonable; and
(c) the water causes -
(i) injury to any other person; or
(iii) any other person to suffer economic loss -
.........................................................................
(5) If the causing of ...the flow ...was given rise to by works constructed or any other act done or omitted to be done on any land at a time before the current occupier became the occupier of the land, the current occupier is liable to pay damages in respect of the injury, damage or loss if the current occupier has failed to take any steps reasonably available to prevent the causing of, or the interference with, the flow (as the case requires) being so given rise to."
"51. The Act does not address the two differences between the statutory and common law positions; and, to this extent I consider the statutory scheme set out in the Act to be ambiguous; and, potentially, leads to injustice, for the reasons set out above. Adopting the principle of statutory interpretation that a statute will only be regarded as limiting a common law right if it does so clearly and unambiguously; Potter v Minahan [1908] HCA 63; (1908) 7 CLR 277, at 304, Director of Public Prosecutions v Zarah Garde-Wilson [2006] VSCA 295 at [22] and [23]. I consider that the words "steps reasonably available" includes a requirement that the current occupier has a sufficient and reasonable time in which to carry out those steps after being given notice, or constructive notice of the unreasonable flow is imputed. Further, that their liability in the event of them not taking reasonable steps to cease the flow after such notice is limited to the time from which such steps should reasonably have been taken."
"53. Therefore, I find that "reasonable steps" in the Act infers that the current occupier takes the necessary steps within a reasonable time........................ I would allow the Respondent a reasonable time to carry out investigations, assess the results and to implement measures to ensure the unreasonable flow is ceased by the disconnection of the hydronic heating. Given the difficult nature of the investigation, the assessment of various methods of rectification and the disconnecting and disposal of the hydronic heating and the installation of a replacement heating system; whilst on the other hand the damage suffered is not acute, catastrophic or endangering to persons or other property, so that urgent action was immediately required, I would allow four months to carry out the necessary steps. Therefore, I consider the Respondent is liable for any damage incurred by the Applicants after the first week in January 2007."
The claim for an order for the performance of work
Barter
Bushett
(1908) 7 CLR 277