[2011] VCAT 1099
Victorian Civil and Administrative Tribunal
2011-06-09
Peter J
Original judgment source is linked above.
Brimbank Planning Scheme; Application pursuant to Section 77 the Planning and Environment Act 1987; Special Use Zone 3; Solid Inert Waste Landfill; Existing quarry; Policy; Groundwater; Amenity impacts.
V Tofikidis, B Kovachevich, D Scenini, L Vantarakis, V Aquilina, A & D O'Rafferty, J Dingli, L Aquilina, MSM Goonetilleke, M Canet on behalf of Residents Against Sunshine Kealba Quarry Inc, H Haouchar, J Bosnjak, L Safarewicz, M Kozulin, A Kozulin, M Kozulin, W Haouchar
Barro Group Pty Ltd v Brimbank CC [2011] VCAT 1099
Mr Jeremy Gobbo QC, and Mr Henry Jackson Barrister instructed by Ponte Earle Lawyers. Expert written and oral evidence called from:
Witness statements were also prepared by Mr Russell Symons, Traffic Engineer of Ratio Consultants Pty Ltd and Mr Ken Norris, Flora and Fauna Consultant of Norris and Schoeffel Environmental Consultants but with the agreement of parties were not required to attend the hearing and be cross-examined.
Mr Christopher Wren, SC and Mr Paul Chiappi Barrister instructed by Russell Kennedy. Expert written and oral evidence called from:
Mr Afa Lindeman, Barrister instructed by Mr Mark Payton, Solicitor to the EPA Victoria. Expert written and oral evidence called from:
Ms Emily Porter, Barrister instructed by Merrylees Legal for Residents Against Sunshine Kealba Quarry Inc. and others. She called expert and lay evidence from:
Use and development of the land for a solid inert waste landfill.
Cl. 37.01-1 & -4 (use of land for landfill and buildings and works in SUZ3).
The site is located on the eastern side of Sunshine Avenue north east of the intersection with Main Road East. It is close to the Western Ring Road to the south and the Maribyrnong River to the east. The land subject to this landfill application has an area of approximately 17 hectares and forms part of a disused basalt quarry with a total area of approximately 40 hectares. The balance of the quarry site is developed for a materials handling and recycling facility and a concrete batching plant. Part of the area to be used for landfill (Cells 1A and 2A) has already been filled in accordance with a previous planning permit issued in 1999. Access to the existing facilities and the proposed landfill is via Main Road East and McIntyre Road.
Residential areas are located to the west on the opposite side of Sunshine Avenue and to the north in Orbital Drive beyond a small valley containing an ephemeral waterway. A small industrial area abuts the northern boundary of the site and the Kealba Hotel and medical facilities are located to the west on the corner of Sunshine Avenue and Main Road East. A service station complex is located on the south east corner of Sunshine Avenue and Main Road East near the entrance to the quarry site.
We undertook two inspections - one accompanied of the quarry and surrounds on 22 March 2011 and another of nearby residences on 29 March 2011).
(a) to provide for the fair, orderly, economic and sustainable use, and development of land;
(b) to provide for the protection of natural and man-made resources and the maintenance of ecological processes and genetic diversity;
(c) to secure a pleasant, efficient and safe working, living and recreational environment for all Victorians and visitors to Victoria;
(d) to conserve and enhance those buildings, areas or other places which are of scientific, aesthetic, architectural or historical interest, or otherwise of special cultural value;
(e) to protect public utilities and other assets and enable the orderly provision and co-ordination of public utilities and other facilities for the benefit of the community;
(f) to facilitate development in accordance with the objectives set out in paragraphs (a), (b), (c), (d) and (e);
(g) to balance the present and future interests of all Victorians.
endeavour to integrate the range of policies relevant to the issues to be determined and balance conflicting objectives in favour of net community benefit and sustainable development for the benefit of present and future generations.
Relevance of the previous planning permit and the current works approval
The interrelationship between environmental and planning controls/guidelines and whether we can consider 'need'
must take account of and give effect to any relevant State environment protection policy declared in any Order made by the Governor in Council under section 16 of the Environment Protection Act 1970;
.... those scheduled landfills that are not currently operating should not come into operation until the closure or imminent closure of existing operating landfills in their relevant subregion has created a demonstrable need for new landfill space. (Part 3 - section 1.2.1)
In contrast to the other three regions, the former western region has shown steady increases in disposal rates. These increases can be attributed to greater landfill availability of air space (landfill capacity) and the numbers of landfills providing greater competition than other regions, with the result that waste has been transported into that region for disposal (Part 3 - section 2.1),
The transport of wastes out of metropolitan Melbourne to Maddingley Brown Coal further reduces the need to schedule any sites in the north and west of Melbourne (Part 3 - section 2.2).
The geology, hydrogeology and patterns of development in metropolitan Melbourne are such that there is a relative abundance of sites that could be suitable for development of landfills. Furthermore, the extraction rate from metropolitan Melbourne quarries is creating space about six times faster than it is being filled (Part 3 - section 3.3).
Even a conservative scenario, which assumes that there will be no reduction in waste to landfill over the Schedule period to 2017 - 18, does not indicate the need for any additional landfill sites (Part 3 - section 4.1).
Consistent with the Waste Management Policy (Siting, Design and Management of Landfills), works approvals and licenses allowing the development of new landfills (or new cells of existing landfills) should not be granted until the closure or imminent closure of existing operating landfills in their relevant subregion has created a demonstrable need for new landfill space...(Part 3 -Section 4.1)
"In so concluding I am not of course to be taken to be holding that the RWMP was a mandatory document. The SPPF, the BPEM and the RWMP were policy documents. As such, they bore directly on but were not necessarily determinative of the exercise of the relevant discretion to grant respectively a planning permit and a works approval. Nevertheless the relevant policy imperative was plain."
It can be accepted that the RWMG has the role of carrying out an assessment. That does not preclude others such as the Council also considering such matters where it is appropriate to do so. Further, it would be incorrect not to do so, if there is reason to suspect that the RWMG has not carried out such an assessment. The lack of a power to review RWMP's is as much a reason for independently and separately considering the issue as not. The consideration of siting criteria in this case is not a collateral challenge of the site rankings created by the RWMP. Further, it is clear from the Western Recycle case and from the observations of Osborn J. in Roads Corporation v. Love that the views and conclusions set out in plans do not bind permit applicants.
In considering a planning permit application in relation to an existing or proposed landfill site, responsible authorities must make decisions consistent with the policy and the BPEM, especially with regard to landfill site selection.
Protection of the environment is a responsibility shared by all levels of Government and industry, business, communities and the people of Victoria. (This principle is also included at cl. (6)(a) of the Waste Management Policy).
The landfill levy is a twofold incentive. As well as discouraging the disposal of waste to landfill through higher disposal fees, funds from the levy are directed to the development of recycling infrastructure and other initiatives including education programs (page 15).
Landfill levy funding will be used to support the development of processing infrastructure to replace landfill as the preference for waste disposal. Sustainability Victoria and EPA Victoria will work with waste management groups to implement government policy which minimises the development and use of landfills (page 29).
Landfill levy funding will be used to support the development of processing infrastructure to replace landfill as the preferred option for waste disposal (page 36).
Action 26. EPA Victoria will investigate potential landfill bans for C&D waste types and/or streams (page 40).
Action 27. EPA Victoria would investigate the practicability of landfill bans for C&I. waste types and/or streams (page 40).
Given that the proposed landfill is well within the 200 metre buffer specified in the BEPM, can we be confident that there are no unacceptable risks to residents living in proximity to the proposed landfill?
[22] ...The EPA is a repository of expertise that enables it to undertake expert scientific and engineering scrutiny of proposals to ensure that all reasonable steps are taken to reduce risks to human health and the environment to acceptable levels.[7] The EPA possesses a level of expertise that is not possessed by planning and responsible authorities.
[23] In general terms, the EPA is the pre-eminent, expert authority within the state on all matters concerning the control of pollution and protection of the environment. In our view, its assessment of matters related to these issues ought be accepted as authoritative and in preference to other assessments or opinions in the absence of an established process whereby competing assessments or opinions can be tested and a binding determination made. The same approach should be adopted with respect to official EPA policies and guidelines.
Can we be confident that potential off-site amenity impacts can be managed within acceptable limits?
[1] This is the smaller site area shown on the amended plans revised to exclude all land outside the Special Use Zone 3.
[2] (paragraphs 15 and 16 of the applicant's submission:
[15] The Applicant also submits that the present proceedings provide the RA, the community and the Tribunal with an opportunity to impose modern operating conditions on the landfill.
[16] That opportunity will not be available if the Applicant were to be successful in pursuing its assertion that (that) planning permit P990025 provides permission to the Applicant to landfill the site.)
[3] Program Manager Landfills, Statutory Facilitation Unit EPA Victoria.
[4] Geotechnical Engineer and Waste Management Consultant.
[5] Roads Corporation v Love [2010] VSC 32
[6] Cl. 43.01-2 of the Brimbank Planning Scheme.
[7] We are aware that the EPA consists only of one person, the Chairman. However, in the present context where we refer to the EPA we are referring to the organisation.
Barro Group Pty Ltd
Brimbank CC [2011] VCAT 1099