[2015] VCAT 1371
General information, not legal advice.
Victorian Civil and Administrative Tribunal
2015-08-28
Original judgment source is linked above.
For the reasons explained above, the decision of the Responsible Authority is set aside. A permit is issued subject to conditions.
(c) The provision of canopy trees within the front setback(s) to assist in the integration of the development within the existing streetscape.
(d) Details of the location and type of all paved and sealed areas. Extensive hard surfaces are not supported. The adoption of porous/permeable paving, rain gardens and other water sensitive urban design features is encouraged.
The Responsible Authority may extend the period referred to if a request is made in writing before the permit expires or;
[1] Refer to Clause 55.05-5 and standard B29, and Clause 55.03-5 and standard B10.
[2] Allan Armstrong and Associates v Monash CC [2014] VCAT 1364
Baric
Moreland CC [2015] VCAT 1371
Allan Armstrong and Associates v Monash CC [2014] VCAT 1364