austlii:vic/VBAB/2025/57
General information, not legal advice.
VBAB
2025-04-17
Original judgment source is linked above.
(a) The Respondent's refusal letter was dated 29 August 2024.
(b) The appeal was issued on 25 September 2024 and meets the prescribed 30 day appeal time set out within the Act. The Applicant has enclosed email dated 25 September 2024 which confirms that:
"....we have as of 24 September 2024 lodged an appeal of the decision with the Building Appeals Board in accordance with Section 144 of the "
(c) Build Over Easement consent has been granted by Great Western Water on 6 December 2022 who also has an asset vested in the easement (extension of time also grated and dated 6 March 2024).
(d) There is an existing grade level paving and timber boarding currently over the easement so no further footings or underground works will be necessary.
(e) The existing deck has been built on a grade over an existing paving slab and therefore the spa load over the easement will be spread out evenly over a large surface area reducing the direct loading onto the easement assets.
(f) The drawings of the existing verandah footing clearly show that there is no additional load via transfer of angle of repose footing onto the storm water asset. This is confirmed by a consulting building surveyor by letter dated 23 March 2012.
(g) The spa is portable and can be easily drained/removed in the unlikely event that access to the underground services are required.
(h) The deck subfloor level is approximately 600mm above the existing sewer and stormwater drainage pipes at the lowest point as required by Greater Western Water. It may therefore be reasonable to consider a similar approach to councils storm water pipes.
(i) Greater Western Water has agreed to the build over easement on 6 December 2022.
(j) There is currently a 173 agreement (AJ742248X) in place for the verandah encroaching into the easement refer to appendix D. Further to this the owner is supportive of agreeing to an additional 173 agreement
The letter references a request for a review of the decision to refuse the Building Over Easement (BOE) application. Furthe the Respondent states that it upholds its earlier decision to refuse the BOE application and that should the Applicant be dissatisfied they can choose to appeal with the Building Appeals Board.
RESPONDENT'S SUBMISSIONS ON JURISDICTIONAL QUESTIONS
(a) In Moonee Valley, Council is the drainage service authority, and all drainage is vested to Council under Section 198 of the Local Government Act 1989. The Respondent has a responsibility to provide this service to current and future developments. The Respondent manages over 528 km of drainage pipes and more than 22,000 drainage pits.
(b) Council must ensure that drainage and easements vested are kept clear of permanent structures to maintain uninterrupted access for urgent maintenance works, protect assets, and meet current and future demands and developments.
(c) Generally, an easement gives someone/service authority the right to use a section of land for a specific purpose, even though they are not the landowner.
(d) As a drainage authority, we face many challenges in providing and continuing service due to factors such as housing demand, population increase, proposed activity centres, flooding, and climate change.
(e) To protect council drainage assets, Council has adopted a Build Over Easement policy/procedures, providing a clear decision-making framework to determine what structures are appropriate to be built over or next to the easement/council drainage assets. This is consistent with other councils and Melbourne Water. Information and guidelines are available on the website for applicants to refer to before submitting applications.
(f) The Respondent has listed three refusals of the BOE application dated 21 June 2023, 25 October 2023 and 27 July 2024. The Respondent notes the letter dated 29 August 2024 responding to a request mad to the Council Mayor seeking assistance. The letter dated 29 August 2024 on 4 September 2024 with background information for clarity and was not a fresh decision. The email was sent to the Applicant's representative and the Applicant on 4 September 2024. In support of its position the Respondent notes the section 157 referral was signed on 8 October 2024.
(g) The section 157 referral was signed on 8 October 2024 and the Respondent believes the appeal was not lodged on time.
(h) The Council has decided under section 198 of the Local Government Act 1989, Council Local Law and related policies and procedures and believes the decision may not fall within the BAB's jurisdiction.
(i) The Respondent requests the appeal be struck out and Council's refusal be affirmed.
Council refused, we said we were going to the Building Appeals Board and then they said they would re-consider.
Thanks for your email, attached is the Council final decision of refusing the BOE application for 97 Rim Cross Drive Avondale Heights after a re-consideration.
Jurisdictional Question 1: Whether the appeal has been lodged in time?
decision, in relation to a matter in relation to which an application for review or appeal can be made to the Building Appeals Board, the Authority or VCAT, includes failure to decide;
I refer to your request for Council review its decision to refuse your BOE Application on 21/06/2023 to Jason Holmes, Jason's email on 07/07/2023 and Council reconfirming it is position on 25/10/2023, Jason's email on 25/03/2024 requesting to reconsider the decision before going to Building Appeals Board (BAB), Council reconfirming the refusal on 26/07/2024, John's request status on 26/07/2024 and Sarah Barbaro's email to the Mayor on 13/08/2024 for a demountable spa to be constructed on the easement E-2 on PS447797H, which is an easement for drainage purpose in favour of all lots on PS447797H.
In this instance, Council upholds its earlier decision to refuse the BOE application for the spa to be installed on easement E-2 on PS447797H. Your efforts in seeking Council approval with respect to this matter is appreciated, I am sorry that we could not assist with a more favourable outcome. Should you be dissatisfied with this decision to refuse your application, you may choose to appeal the decision to the Building Appeals Board.
Thanks for your email, attached is the Council final decision of refusing the BOE application for 97 Rim Cross Drive Avondale Heights after a re-consideration.
(1) A person may commence a proceeding before the Building Appeals Board by serving on the Board an application, a notice of appeal or a notice of referral of a matter to the Board, as appropriate.
(2) A document commencing a proceeding -
(i) the nature of the proceeding; and
(ii) the grounds for commencing the proceeding; and
(iii) the relief sought; and
(b) must be in accordance with the regulations (if any).
(a) An electronic lodgement was received by the Registry of the BAB on 25 September 2024.
(b) The Application form, payment details and supporting documentation was received.
(c) Clarification was sought which resulted in the filing of documentation dated 8 October 2024.
(d) The Registry considers that the appeal was lodged on 25 September 2024.
Jurisdictional Question 2: Whether the BAB can amend the proceeding to an appeal or consider an appeal relating to reg 130 of the Building Regulations 2018?
(1) The following are vested in the Council and are under the management and control of the Council -
(a) public sewers and drains within the municipal district;
(b) sewers and drains in and under roads in the municipal district;
(c) Works and materials relating to (a) and (b).
(2) This section does not apply to any sewers and drains vested in another Council or a Minister, the Crown or any public body.
[1] Australian Broadcasting Tribunal v Bond (1990) 170 CLR 321, 337.
�Barbaro & Anor
Moonee Valley City Council [2025] VBAB 57;
(1990) 170 CLR 321