10 The original DA states that the application is for the erection of a concrete batching plant and cement silo in accordance with plans attached. The land to be developed is identified in the DA form as Portion 182 DP 751388.
11 The Additional Information for CVC DA 2005/5490 document accompanying the DA states:
The proposal involves the following:
· Installation of a relocatable weather-proofed plant, including 6m3 capacity batcher, 55 tonne cement-capacity silo and batch room, onto and about the existing purpose-built footings and mountings; and
· Installation of a relocatable building comprising office, lunch-room and en-suite areas together with wastewater disposal facility …
The components will be installed to match the existing drainage and vehicle manoeuvring functions of the site, as shown on Figure 2. The functions have been established by the site's previous and continuing activities. The use of the existing footings and mountings positions the footprint of the relocatable plant at no less than 100m from the top of the bank of James Creek. The existing drainage maintenance function of the site will be assisted by the recycling of run-off treated in the ponds for re-use in production activities.