[2025] VCAT 559
General information, not legal advice.
Victorian Civil and Administrative Tribunal
2025-06-25
Original judgment source is linked above.
Figure 2: Schematic of site layout for processing area (source: Figure appended to the Prensa Application Report November 2023, TB p2027)
THE STRUCTURE OF THESE REASONS AND SUMMARY OF OUR FINDINGS
CONTEXT OF THIS DECISION - THE MANAGEMENT OF ASBESTOS
Asbestos...[was] used extensively in the manufacture of many products such as tiles, cement pipes and insulation among others. Asbestos was used because of the versatility, strength, fire resistance and insulating properties of the fibres. Australian homes built or renovated before 1990 have a good chance of containing asbestos (ASEA). Asbestos is also present in other commercial and public buildings and infrastructure.
... is restricted to material that cannot pass a 7 mm x 7 mm sieve. This sieve size is selected as it approximates the thickness of common asbestos cement sheeting and for fragments to be smaller than this would imply a high degree of damage and potential for fibre release.
Asbestos was widely used in commercial and domestic building materials across Victoria from the late 1800s until the 1980s. It was completely banned in Australia in 2003 because it causes fatal and debilitating diseases. The only way to prevent asbestos-related diseases is to eliminate the risk of exposure by safely removing asbestos-containing materials.
How is asbestos currently managed and disposed of in Victoria?
(2) A clearance certificate must state that -
(a) an inspection by an independent person has found that there is no visible asbestos residue remaining as a result of the asbestos removal work in the area where the asbestos removal work was performed or in the area immediately surrounding the area where the asbestos removal work was performed; and
(b) if required under regulation 292 or 294, asbestos paraoccupational air monitoring in the area where the asbestos removal work was performed indicates that the airborne asbestos fibre level is less than 0·01 f/ml.
[Tribunal emphasis]
Victoria needs conveniently located infrastructure for the safe disposal of asbestos and asbestos-containing materials removed from our building stock and other sources to support the gradual removal of this legacy waste from the community. Asbestos removal should be done primarily, and preferably, by a licensed removalist. However, householders are also permitted to remove non-friable asbestos in accordance with strict guidelines. Both need access to safe disposal options.
Victoria has 26 landfills licensed to receive asbestos with only 21 currently accepting waste. Some of these facilities also have limitations on the type and amounts of asbestos they will accept.[29] For many Victorians, these landfills are located more than a 60-minute drive from their household or business. Over time, the number of landfills will decline reducing access further.
...
By weight, asbestos is one of the largest hazardous waste streams in Victoria. In 2019-20, it made up about eight per cent of hazardous material disposed of at licensed landfills, with an estimated 178,000 tonnes of asbestos-containing materials disposed of at landfill (SV 2020). Lots of wrapped asbestos disposed of directly by household removalists is not formally captured via Victoria's waste data tracking system. Our research suggests this is a relatively small fraction, with most asbestos entering landfills as a contaminant in soil or from commercial removalists.[30]
Currently, a restricted number of landfills are licensed to accept commercial and/or domestic asbestos waste (see Figure 1). Some landfills licensed to accept asbestos do not currently do so, due to concerns around risk management and costs, or they only accept it from residents in their immediate local government area (SV 2017 and Goulburn Valley WRRG 2017).
Based on SV's preliminary research into planned closures of Victorian landfills, the number of landfills licensed to receive asbestos is projected to decline from 26 to 18 in the next ten years. In the next 30 years, it is projected to drop to seven landfills. Landfill closure over time will increase drive times to asbestos disposal options. In regional Victoria, by 2030 an estimated 50 per cent of the population will be located more than 60 minutes' drive from a landfill accepting commercial asbestos waste and 30 per cent from a landfill accepting domestic asbestos waste. Drive times will also increase in metropolitan Melbourne by 2030 with nearly an estimated 20 per cent of the population located more than 60 minutes' drive from a landfill accepting commercial asbestos waste.[32]
SUMMARY OF LEGISLATIVE PROVISIONS AND FRAMEWORK
The main purposes of this Act are -
(a) to provide for the continuation of the Environment Protection Authority; and
(b) to specify a new objective of the Environment Protection Authority; and
(c) to provide for a new governance structure of the continued Environment Protection Authority; and
(d) to provide for the Governing Board of the Environment Protection Authority; and
(e) to set out principles of environment protection; and
(f) to set out the legislative framework for the protection of human health and the environment from pollution and waste; and
(g) to provide for a general environmental duty to minimise risks of harm to human health and the environment from pollution or waste; and
(h) to establish a permissions scheme that enables the Environment Protection Authority to issue or grant development licences, operating licences, pilot project licences, permits and registrations; and
(i) to provide a framework for the management of waste; and
* * * * *
(k) to enable the Environment Protection Authority and authorised officers to ensure compliance with the Act and require action to manage risks of harm to human health and the environment from pollution or waste; and
(l) to provide for a system of criminal and civil penalties; and
(m) to provide for a system of civil remedies and compensation orders available to the Court; and
(o) to make consequential amendments to the Public Administration Act 2004 and other Acts.
It is the intention of Parliament that in the administration of this Act and the regulations regard should be given to the principles specified in this Chapter.
(a) have access to reliable and relevant information in appropriate forms to facilitate a good understanding of issues of harm or risks of harm to human health and the environment and of how decisions are made under this Act; and > > (b) be engaged and given opportunities to participate in decisions made under this Act, where appropriate to do so; and > > (c) have their interests taken into account in decisions made under this Act.
25 General environmental duty
(1) A person who is engaging in an activity that may give rise to risks of harm to human health or the environment from pollution or waste must minimise those risks, so far as reasonably practicable.
(2) A person commits an offence if the person contravenes subsection (1) in the course of conducting a business or an undertaking.
Penalty: In the case of a natural person, 2000 penalty units;
In the case of a body corporate, 10 000 penalty units.
(3) An offence under subsection (2) is an indictable offence.
(4) Without limiting subsection (1), a person who is conducting a business or an undertaking contravenes that subsection if the person fails to do any of the following in the course of conducting the business or the undertaking, so far as reasonably practicable -
(a) use and maintain plant, equipment, processes and systems in a manner that minimises risks of harm to human health and the environment from pollution and waste;
(b) use and maintain systems for identification, assessment and control of risks of harm to human health and the environment from pollution and waste that may arise in connection with the activity, and for the evaluation of the effectiveness of controls;
(c) use and maintain adequate systems to ensure that if a risk of harm to human health or the environment from pollution or waste were to eventuate, its harmful effects would be minimised;
(d) ensure that all substances are handled, stored, used or transported in a manner that minimises risks of harm to human health and the environment from pollution and waste;
(e) provide information, instruction, supervision and training to any person engaging in the activity to enable those persons to comply with the duty under subsection (1).
(5) Without limiting subsection (1), a person who is conducting a business or an undertaking and engaging in an activity that involves the design, manufacture, installation or supply of a substance, plant, equipment or structure, contravenes that subsection if the person fails to do any of the following in the course of conducting the business or the undertaking and engaging in the activity, so far as reasonably practicable -
(a) minimise risks of harm to human health and the environment from pollution and waste arising from the design, manufacture, installation or supply of the substance, plant, equipment or structure when the substance, plant, equipment or structure is used for a purpose for which it was designed, manufactured, installed or supplied;
(b) provide information regarding the purpose of the substance, plant, equipment or structure and any conditions necessary to ensure it can be used in a manner that complies with the duty under subsection (1).
[Tribunal emphasis]
(a) the storage or possession of waste or any other substance or thing; or
(b) anything prescribed to be an activity.
(a) eliminate risks of harm to human health and the environment so far as reasonably practicable; and
(b) if it is not reasonably practicable to eliminate risks of harm to human health and the environment, to reduce those risks so far as reasonably practicable.
(a) the likelihood of those risks eventuating;
(b) the degree of harm that would result if those risks eventuated;
(c) what the person concerned knows, or ought reasonably to know, about the harm or risks of harm and any ways of eliminating or reducing those risks;
(d) the availability and suitability of ways to eliminate or reduce those risks; and
(e) the cost of eliminating or reducing those risks.
35 What is contaminated land?
(1) Subject to subsection (2), land is contaminated if waste, a chemical substance or a prescribed substance is present on or under the surface of the land, and the waste, chemical substance or prescribed substance -
(a) is present in a concentration above the background level; and
(b) creates a risk of harm to human health or the environment.
(2) Land is not contaminated -
(a) merely because waste, a chemical substance or a prescribed substance is present in a concentration above the background level in water that is on or above the surface of the land; or
(b) if any prescribed circumstances apply to the land.
39 Duty to manage contaminated land
(1) A person in management or control of contaminated land must minimise risks of harm to human health and the environment from the contaminated land so far as reasonably practicable.
(2) For the purposes of subsection (1), minimising risks of harm to human health and the environment from contaminated land includes (but is not limited to) carrying out any of the following -
(a) identification of any contamination that the person knows or ought reasonably to know of;
(b) investigation and assessment of the contamination;
(c) provision and maintenance of reasonably practicable measures to minimise risks of harm to human health and the environment from the contamination, including undertaking clean up activities where reasonably practicable;
(d) provision of adequate information to any person that the person in management or control of the contaminated land reasonably believes may be affected by the contamination, including -
(i) sufficient information to identify the contamination; and
(ii) the results of investigation and assessment referred to in paragraph (b); and
(iii) the risks of harm to human health and the environment from the contamination;
(e) provision of adequate information to enable any person who is reasonably expected to become a person in management or control of the contaminated land to comply with the duty to manage contaminated land.
....
40 Duty to notify of contaminated land
(1) A person in management or control of land must notify the Authority if the land has been contaminated by notifiable contamination as soon as practicable after the person becomes aware of, or reasonably should have become aware of, the notifiable contamination.
(2) A person commits an offence if the person contravenes subsection (1).
Penalty: In the case of a natural person, 120 penalty units;
In the case of a body corporate, 600 penalty units.
(3) For the purposes of subsection (1), whether a person in management or control of land becomes aware of, or reasonably should have become aware of, notifiable contamination is determined having regard to -
(a) the person's skills, knowledge and experience; and
(b) whether the person could practicably seek advice regarding the contamination; and
(c) any other circumstances of the contamination.
(4) Subsection (1) does not apply if -
(a) the person who is required to notify the Authority under subsection (1) is aware that a notification has already been made to the Authority in accordance with this section; or
(b) the notifiable contamination is a prescribed exempt notifiable contamination.
[Tribunal emphasis]
37 What is notifiable contamination?
Notifiable contamination, in relation to contaminated land, means contamination that is -
(a) prescribed notifiable contamination; or
(b) if the regulations do not prescribe notifiable contamination by a particular waste, chemical substance or prescribed substance, contamination for which the reasonable cost of action to remediate the land is likely to exceed -
(i) $50 000; or
(ii) any other prescribed amount.
[Tribunal emphasis]
For the purposes of section 37(a) of the Act, the presence of friable asbestos in or on soil on land is prescribed notifiable contamination if a person is, or is likely to be, exposed to airborne asbestos fibre levels of above 0·01 fibres per millilitre by means of inhalation.
[Tribunal emphasis]
friable asbestos means asbestos that, when dry -
(a) may be crumbled, pulverised or reduced to powder by hand pressure; or
(b) as a result of a work process becomes such that it may be crumbled, pulverised or reduced to powder by hand pressure;
On-site retention of contaminated soil
For the purposes of section 37(a) of the Act, the on-site retention of soil (other than fill material) from contaminated land sourced on-site that is not an activity for which a permission is required, is prescribed notifiable contamination.
Fill material is industrial waste that is soil -
(a) with contaminant concentrations not exceeding the upper limits for fill material contaminant concentrations specified in the Waste Disposal Categories - Characteristics and Thresholds; and
(b) that does not contain asbestos;
[Tribunal emphasis]
contamination of land arising from a particular waste or a chemical substance that is not specified in section 6 of Schedule B1 to the NEPM (ASC), other than contamination arising from -
(i) asbestos described in regulation 9; ...
PERMISSIONS REGIME UNDER THE EP ACT AND THE EP REGULATIONS
What is dealt with in Chapter 4 'Permissions' of the EP Act?
(a) a development licence; or
(b) an operating licence; or
(c) a pilot project licence; or
(d) a permit; or
(e) a registration;
(1) This section sets out a simplified outline of this Chapter.
(2) This Chapter provides for the issue or grant of the following permissions -
(a) development licences;
(b) operating licences;
(c) pilot project licences;
(d) permits;
(e) registrations.
(3) Part 4.2 prohibits persons from engaging in specified or prescribed activities without a permission.
(4) Part 4.3 sets out -
(a) the application, transfer and amendment processes for permissions; and
(b) other provisions that apply to permissions generally.
(5) Part 4.4 sets out provisions that apply to development licences, operating licences and pilot project licences and applications relating to those licences.
(6) Part 4.5 sets out provisions that apply to permits and applications relating to permits.
(7) Part 4.6 sets out provisions that apply to registrations and applications relating to registrations.
(8) Part 4.7 provides that a prohibited person must not engage in a prescribed activity.
(9) Part 4.8 provides for an environment protection levy that is to be charged, levied and collected by the Authority.
This Part applies subject to anything to the contrary in Part 4.4 [Licences], 4.5 [Permits] or 4.6 [Registrations].
In this Part -
relevant permission application means -
(a) an application under section 50 for a permission; or
...
(f) an application under section 80 for an exemption from the application of section 44; or
...
[Tribunal emphasis]
(1) An application for a permission must -
(a) be made -
(i) in the case of an application made to the Authority, in a form and manner approved by the Authority; or
(ii) in the case of an application made to a council, in the prescribed form and manner; and
(b) be accompanied by the prescribed fee (if any) for the application; and
...
(c) specify whether the application is for -
(i) a development licence; or
(ii) an operating licence; or
...
(d) specify the activity in relation to which the permission is sought; and
(e) include any prescribed information.
(2) The Authority or a council -
(a) must not deal with an application that does not comply with this section; and
(b) must advise an applicant if an application does not comply with this section.
(1) A person must not engage in one or more of the following activities except as authorised by a development licence in respect of the activity -
(a) the construction or installation of plant or equipment for a prescribed development activity;
(b) the development of processes or systems for a prescribed development activity;
(c) the modification, other than general maintenance, of plant, equipment, processes or systems for a prescribed development activity or of the operation of a prescribed development activity -
(i) if the modification creates a risk of material harm to human health or the environment from pollution or waste; or
(ii) in prescribed circumstances.
(2) Subsection (1) does not apply -
...
(c) if a prescribed exemption applies to the person.
(1) For the purposes of section 44 of the Act, an activity set out in column 3 of the Table in Schedule 1 is a prescribed development activity if the corresponding entry in column 4 of that Table specifies that the activity is a prescribed development activity.
(1) The Authority must, not later than 4 months after receiving an application for a development licence that complies with section 50 -
(a) issue a development licence subject to any specified conditions that the Authority considers appropriate; or
(b) refuse to issue a development licence.
(2) The Authority must refer an application for a development licence to a prescribed agency for comment in the prescribed circumstances.
(3) When determining whether or not to issue a development licence, the Authority must take into account -
(a) any measures the applicant has taken or proposes to take in order to comply with the general environmental duty when engaging in the activity that is the subject of the application; and
(b) the impact of the activity on human health and the environment, including the impact on any environmental values identified in any relevant environment reference standard, taking into account any other activities being or proposed to be engaged in by the applicant or any other person; and
(c) the principles of environment protection; and
(d) the best available techniques or technologies; and
(e) whether the activity is otherwise consistent with this Act and the regulations; and
(f) if the regulations require the Authority to refer the application to a prescribed agency, any comments or submissions received from that agency; and
(g) any comments and submissions received -
(i) in response to the notice of the application published under section 52; and
(ii) within the time specified in that notice; and
(h) any prescribed matter.
(4) The Authority must refuse to issue the development licence if -
(a) the Authority considers that the activity that is the subject of an application poses an unacceptable risk of harm to human health or the environment; or
(b) the Authority determines that the person is not a fit and proper person to hold a development licence; or
(c) any prescribed circumstances exist.
(5) The development licence must specify the date on which the development licence expires.
(6) If the Authority decides to issue a development licence, the Authority must, within 5 business days of issuing the licence, take reasonable steps to notify each person who made a submission under section 52 in relation to the application for the licence of the following -
(a) the decision to issue the licence;
(b) that certain persons may seek review of the decision under section 434.
(1) The holder of a development licence may apply, in the form and manner approved by the Authority, for a statement from the Authority as to whether the Authority considers the holder to have completed the activity specified in the development licence to the Authority's satisfaction.
(2) The Authority must provide a written statement under subsection (1) within 20 business days after receiving an application under that subsection.
(1) A person must not engage in a prescribed operating activity except as authorised by an operating licence in respect of the activity.
...
(2) Subsection (1) does not apply -
(a) in respect of any action or thing the person takes or does to comply with -
...
(iii) an exemption granted to the person under section 80(2) that is in force in respect of the activity; or
...
(b) in respect of any action or thing that the person is required to take or do under an improvement notice or environmental action notice; or...
(c) if a prescribed exemption applies to the person.
(2) For the purposes of section 45 of the Act, an activity set out in column 3 of the Table in Schedule 1 is a prescribed operating activity if the corresponding entry in column 4 of that Table specifies that the activity is a prescribed operating activity.
(1) Subject to subsection (2), the Authority must, after receiving an application for an operating licence that complies with section 50 -
(a) issue an operating licence subject to any specified conditions that the Authority considers appropriate; or
(b) refuse to issue an operating licence.
(2) The Authority must issue or refuse to issue an operating licence under subsection (1) within -
(a) 15 business days after receiving the application if -
(i) the applicant holds a development licence in respect of the activity that is the subject of the application; and
(ii) the Authority has provided to the applicant a statement under section 73 that the Authority considers the applicant to have completed the activity to the Authority's satisfaction; or
(b) in any other case, 42 business days after receiving the application.
(3) When determining whether or not to issue an operating licence, the Authority must take into account -
(a) any measures the applicant has taken or proposes to take in order to comply with the general environmental duty when engaging in the activity that is the subject of the application; and
(b) the impact of the activity on human health and the environment, including the impact on any environmental values identified in any relevant environment reference standard, taking into account any other activities being or proposed to be carried out by the applicant or any other person; and
(c) the principles of environment protection; and
(d) the best available techniques or technologies; and
(e) whether the activity is otherwise consistent with this Act and the regulations; and
(f) any prescribed matter.
(4) The Authority must refuse to issue an operating licence if -
(a) the Authority considers that the activity that is the subject of the application poses an unacceptable risk of harm to human health or the environment; or
(b) the Authority determines that the person is not a fit and proper person to hold an operating licence; or
(c) the Authority considers the activity that is the subject of the application to be a prescribed development activity and the applicant does not hold a development licence in respect of the activity; or
(d) any prescribed circumstances exist.
(5) Nothing in this Chapter prevents -
(a) the person who has applied for an operating licence in respect of an activity applying for a development licence in respect of the same activity; or
(b) the Authority determining that application for a development licence in accordance with Division 1.
75 Term of operating licences
(1) Subject to subsection (2), if the Authority issues an operating licence after the commencement of this Chapter, the Authority must specify on the licence the period during which the licence remains in force.
(2) An operating licence may not remain in force -
(a) in the case of an operating licence that specifies a waste management activity that is engaged in at a current or former landfill site, for a period of more than 99 years; or
(b) in any other case, for a period of more than 20 years.
(1) A person may apply to the Authority for an exemption from the application of section 44 in respect of a prescribed development activity.
(2) A person may apply to the Authority for an exemption from the application of section 45 in respect of a prescribed operating activity.
(3) An application for an exemption under subsection (1) or (2) must -
(a) be made in any form and manner approved by the Authority; and
(b) specify the activity in relation to which the exemption is sought; and
(c) be accompanied by the prescribed fee (if any) for the application; and
...
(d) include any prescribed information.
(4) Subject to section 51B, on receiving an application that complies with subsection (3), the Authority must, within 20 business days (or any shorter prescribed period) after receiving the application -
(a) grant the exemption subject to any conditions the Authority considers appropriate; or
(b) refuse to grant the exemption.
(5) When determining whether to grant an exemption, the Authority must take into account any prescribed matter.
(6) An exemption granted under subsection (4) may be revoked or amended by a written notice given by the Authority.
(7) An exemption granted under subsection (4) has no effect unless the conditions to which it is subject are complied with.
138 Of key relevance to this proceeding, the assessment of a licence exemption is to be undertaken having regard to the following criteria or prescribed matters under regulation 24 of the EP Regulations:
For the purposes of section 80(5) of the Act, the following are prescribed matters -
(a) the purposes of the Act;
(b) the objective of the Authority;
(c) the objects set out in section 111 of the Act;
(d) the principles of environment protection;
(e) whether granting the proposed exemption may adversely affect -
(i) human health or the environment; or
(ii) the interests of any person other than the applicant; or
(iii) any environmental values identified in any relevant environment reference standard;
(f) the best available techniques or technologies for engaging in the prescribed activity;
(g) whether the applicant has adequately engaged with any person whose interests may be affected by the proposed exemption, taking into account the Charter of Consultation developed under section 53 of the Act;
(h) whether the applicant is a fit and proper person for the purposes of Chapter 4 of the Act;
(i) whether, if the Authority has requested further information from the applicant, the applicant has provided sufficient information within a reasonable time;
(j) whether it is in the public interest to grant the exemption.
The Charter contains 'Consultation guidelines' that address consultation for permissions and, relevantly, includes the following content in terms of development licences and exemptions:
The references in the above table to 'Pre-application engagement' and 'Permissions applications profile assessments' is a reference to the following content in the Charter:
THE WASTE DISPOSAL REGIME UNDER THE EP ACT AND THE EP REGULATIONS
What is dealt with in Chapter 6 'Waste' of the EP Act?
(1) This section sets out a simplified outline of this Chapter.
(2) Part 6.2 provides for the objects of this Chapter.
(3) Part 6.3 provides for the powers and appointment of litter enforcement officers and offences in relation to the disposal and removal of litter and other waste.
(4) Part 6.4 provides for duties in relation to industrial waste.
(5) Part 6.5 provides for duties and controls in relation to priority waste.
(6) Part 6.6 provides for the administration of the waste levy scheme.
(1) The objects of this Chapter are -
(a) to minimise litter and waste disposal by encouraging the management of waste in accordance with the waste management hierarchy; and
(b) to promote waste reduction, resource recovery and resource efficiency; and
(c) to minimise the impact on human health and the environment from waste generation and waste disposal.
(2) It is the intention of the Parliament that in the administration of this Chapter regard should be given to the objects of this Chapter.
Waste should be managed in accordance with the following order of preference, so far as reasonably practicable -
(a) avoidance;
(b) reuse;
(c) recycling;
(d) recovery of energy;
(e) containment;
(f) waste disposal.
resource recovery in relation to waste, means -
(a) preparation for reuse of the waste;
(b) recycling the waste;
(c) reprocessing the waste;
(d) recovering energy or other resources from the waste;
(e) anything prescribed to be resource recovery in relation to waste -
but does not include anything prescribed not to be resource recovery in relation to waste.
[Tribunal emphasis]
reuse, in relation to waste, means the use of the waste for a purpose that is the same or similar to the purpose for which it was used before it became waste;
soil containing asbestos only means priority waste that is classified as soil containing asbestos only in accordance with regulation 67 or 68;
[Tribunal emphasis]
... a person who has the management or control of priority waste consigned for disposal must, before relinquishing management or control of the priority waste to another person for the purposes of transporting the priority waste, classify the priority waste in accordance with this regulation.
The person must classify the priority waste consigned for disposal as a category of priority waste set out in Schedule 6.
...
... a person who has the management or control of priority waste that is soil sourced on-site from contaminated land must, as soon as practicable after sourcing the soil, classify the soil as one of the following categories of priority waste set out in Schedule 6 -
(a) Category A waste;
(b) Category B waste;
(c) Category C waste;
(d) Category D waste;
(e) soil containing asbestos only.
...
... a person who has the management or control of priority waste that is soil not sourced on-site from contaminated land must, before relinquishing management or control of the soil to another person for the purposes of transporting the soil, classify the soil as one of the following categories of priority waste set out in Schedule 6 -
(a) Category A waste;
(b) Category B waste;
(c) Category C waste;
(d) Category D waste;
(e) soil containing asbestos only.
[Tribunal emphasis]
Soil containing asbestos only
Soil containing asbestos only is industrial waste that is soil that -
(a) contains asbestos; and
(b) does not contain any contaminant concentration exceeding the upper limits for fill material contaminant concentrations specified in the Waste Disposal Categories - Characteristics and Thresholds, as in force from time to time.
[Tribunal emphasis]
Priority waste is any waste, including municipal waste and industrial waste, that is prescribed to be priority waste for the purposes of -
(a) eliminating or reducing risks of harm to human health or the environment posed by the waste; or
(b) ensuring the priority waste is managed in accordance with this Part; or
(c) facilitating waste reduction, resource recovery and resource efficiency.
139 Duties of persons managing priority waste
(1) A person who has the management or control of priority waste must classify the priority waste in accordance with this Act and the regulations.
(2) A person who has the management or control of priority waste must take all reasonable steps to ensure that -
(a) the priority waste is contained in a manner that prevents its escape; and
(b) the priority waste is isolated in a manner that ensures resource recovery remains practicable; and
(c) a person who collects, consigns, transfers or transports the priority waste is provided the following, where reasonably available -
(i) information regarding the nature and type of the priority waste;
(ii) information regarding any risks of harm to human health or the environment that exist in relation to the priority waste;
(iii) any other information that can reasonably be expected to be necessary for the person to comply with a duty in relation to the priority waste under this Act.
Note
Section 314 provides that subsections (1) and (2) are civil penalty provisions. The penalties for contravention of these civil penalty provisions are set out in the table in section 314.
(3) A person who contravenes subsection (1) or (2) commits an offence.
Penalty: In the case of a natural person, 120 penalty units;
In the case of a body corporate, 600 penalty units.
[Tribunal emphasis]
(1) A person who has the management or control of priority waste must -
(a) take all reasonable steps to identify and assess alternatives to waste disposal for the priority waste, including -
(i) reuse and recycling of the priority waste; and
(ii) if the person produced or generated the priority waste, avoiding producing or generating similar priority waste in the future; and
(b) have regard to the following in making a decision relating to management of the priority waste -
(i) alternatives to waste disposal identified and assessed under paragraph (a);
(ii) any guidelines issued by the Authority relating to alternatives to waste disposal for that type of priority waste;
(iii) the objects of this Chapter.
(2) For the purposes of subsection (1)(a), taking reasonable steps includes (but is not limited to) the following -
(a) considering any guidelines issued by the Authority relating to alternatives to waste disposal for that type of priority waste;
(b) considering any other relevant guidelines or publications;
(c) considering the availability of any relevant technology used in resource recovery;
(d) consulting a person or body with relevant expertise relating to alternatives to waste disposal for that type of priority waste.
(b) if the industrial waste is received and used in accordance with specifications acceptable to the Authority set out in a determination made under regulation 5.
(a) all the conditions in Clause 6 of this determination are satisfied; and
(b) the fill material does not contain, or the waste generator has removed as far as reasonably practicable, any wastes or physical contaminants that are not soil, including -
(i) concrete, bricks, ceramics, asphalt, plastics, glass, metal or wood; and
(ii) putrescible or organic wastes; and
(c) the fill material is not malodourous, including from petroleum hydrocarbons, hydrogen sulphide or organosulfur compounds; and
(d) the fill material does not contain discoloured chemical deposits or staining from chemical waste.
[Tribunal emphasis]
(1) The waste receiver must inspect each consignment of fill material when received at the receiving site and -
(a) confirm the consignment meets the specifications in Clause 5 of this determination; and
(b) make a record of that inspection.
(2) The waste receiver must not accept any waste soil classified as fill material excavated from contaminated land unless the waste generator has provided evidence of the soil classification, including any laboratory analysis, carried out in accordance with Regulation 62(1)(b) of the [EP] Regulations.
(3) Any laboratory analysis required for the purposes of this determination must be undertaken by a National Association of Testing Authorities accredited laboratory.
[Tribunal emphasis]
For the purposes of section 138 of the Act, the following types of waste are prescribed to be priority waste -
(a) industrial waste that is classified as priority waste under regulation 61 or 62;
(b) industrial waste that, had it been classified under regulation 61 or 62, would be classified as priority waste.
Excavated material or engineered fill including fill material, other than item 83 or 85 of this Table[60]
Category D waste
Category D waste is industrial waste (other than Category A waste or Category B waste or Category C waste) that is soil -
(a) with any contaminant concentration greater than the upper limits for fill material contaminant concentrations specified in the Waste Disposal Categories - Characteristics and Thresholds, as in force from time to time, but not exceeding the upper limits for Category D waste contaminant concentrations; or
(b) with any leachable concentration not exceeding the upper limits for Category D waste leachable concentrations; or
(c) for which the Authority has issued a designation classifying the waste as Category D waste.
Soil containing asbestos only
Soil containing asbestos only is industrial waste that is soil that -
(c) contains asbestos; and
(d) does not contain any contaminant concentration exceeding the upper limits for fill material contaminant concentrations specified in the Waste Disposal Categories - Characteristics and Thresholds, as in force from time to time.
Packaged waste asbestos
Packaged waste asbestos is waste asbestos (other than soil containing asbestos) contained in a manner so as to eliminate the release of airborne asbestos fibres.
[Tribunal emphasis]
Soil containing asbestos only would be fill material if it did not contain asbestos. If soil containing asbestos contains any contaminant concentrations exceeding the upper limits for fill material, the soil is Category A, B, C or D waste as determined in accordance with the above category descriptions.
[Tribunal emphasis]
Classifying priority waste under the Waste Disposal Category
In Victoria, waste must be classified to meet waste duties under Part 6.4 (Duties relating to industrial waste) and 6.5 (Duties and controls relating to priority waste) of the Environment Protection Act 2017.
The Environment Protection Regulations (the Regulations), Part 4.2 (Industrial Waste and priority waste) specifies the process for classifying waste.
This Waste disposal categories - characteristics and thresholds publication, as published by Environment Protection Authority Victoria (EPA) from time to time, is incorporated into the Regulations without modification.
This publication establishes the characteristics and thresholds necessary for complying with the Regulations, specifically, classification of wastes to determine the relevant waste disposal category in accordance with Schedule 6 of the Regulations.
A holder of waste must use the criteria and thresholds in this publication to determine a waste disposal category unless the category is determined by the Regulations.
[Tribunal emphasis]
Any reference in this document to soil that contains asbestos does not include soil from which visible asbestos-containing material has been removed, so far as reasonably practicable, from the soil by the person proposing to supply, store, transport, sell, use or re-use the soil. See regulation 217 of the Occupational Health and Safety Regulations 2017 (sic) for further information.
[Tribunal emphasis]
Wherever this publication requires testing to be completed, such as for leachable concentration or total concentration, it is a requirement that testing be undertaken by a National Association of Testing Authorities, Australia (NATA) accredited laboratory.
As defined in the Environment Protection Regulations fill material is industrial waste that
(a) with contaminant concentrations not exceeding the upper limits for fill material
waste contaminant specified in the document Waste Disposal Categories -
(b) does not contain any contaminant concentration exceeding the upper limits for fill material contaminant concentrations specified in Table 3.
... to provide information to help duty holders understand their obligations under the Environment Protection Act 2017 and subordinate instruments, including by providing examples of approaches to compliance.[67]
...
... to step through the process for classifying industrial waste under the Environment Protection Act 2017 1(the Act) and Environment Protection Regulations 2021 (the Regulations). This guide:
All industrial waste is subject to the industrial waste duties in sections 133, 134 and 135 of the [EP] Act which require that industrial waste must only be deposited at a place or premises authorised to receive industrial waste (a 'lawful place').
...
Priority waste is a subset of industrial waste which requires additional controls due to its higher level of hazard, its potential for mismanagement, or to encourage resource recovery or resource efficiency.
...
Priority waste is subject to further duties [that] relate to:
...
Priority waste may also be reportable priority waste (transactions) and reportable priority waste (transport).
Section 142 applies to reportable priority waste (transactions) and requires this type of waste be tracked using Waste Tracker (or an authorised alternative system).
Section 143 applies to reportable priority waste (transport) and requires this type of waste be transported by a vehicle for which a permission is held to transport the waste.
...
For soil, the priority waste category helps determine what can be done with soil more broadly, not just for disposal to landfill. For example, Category D soil generated at a project site may be contained on that site under a permit.
As with other waste, where soil is consigned for disposal to landfill the priority waste category will determine which landfills are able to receive the waste and the applicable levy rate.
[Tribunal emphasis, footnotes omitted]
Figure 3: Flowchart for soil sourced from contaminated land
For purposes of classifying industrial waste that is soil, EPA requires assessment of the soil, including an understanding of site history, to determine whether the soil is sourced from contaminated land and to identify which contaminants require analysis. An assessment must be undertaken for all chemical substances known or reasonably expected to be in the waste. This means that not all contaminants need to be analysed in every waste, unless they are known or reasonably expected to be present.
...
Where soil does not contain any known or reasonably expected contaminants exceeding the upper limits for fill material in Table 3 (and there are no other contaminants known or reasonably expected to be present, for example asbestos, WASS, PFAS), the soil can be classified as fill material.
[Tribunal emphasis]
Soil must be classified as the applicable category in accordance with Schedule 6 of the Regulations. This may require sampling and analysis to determine the contaminant or leachable concentrations of the waste to apply the contaminant or leachable concentrations thresholds specified in Table 2 of Waste disposal categories - characteristics and thresholds (EPA publication 1828).
[Tribunal emphasis]
Does the soil contain asbestos? This does not include soil from which visible asbestos-containing material has been removed, so far as reasonably practicable.
If yes [the soil contains asbestos], the soil is priority waste and the category of priority waste under Schedule 6 of the Regulations is soil containing asbestos only.
No further action required for classification while the soil remains on-site. Go to step 4 if the soil is to be transported offsite.
[Tribunal emphasis]
Does the soil contain asbestos? This does not include soil from which visible asbestos-containing material has been removed, so far as reasonably practicable.
is industrial waste, classified as fill material with a code of N122. That soil is not a reportable priority waste, including for transactions or transport, although when transported, and received at another site, is subject to the Fill Determination.
... establish a nationally consistent approach to the assessment of site contamination to ensure sound environmental management practices by the community which includes regulators, site assessors, environmental auditors, land owners, developers and industry.
... provide adequate protection of human health and the environment, where site contamination has occurred, through the development of an efficient and effective national approach to the assessment of site contamination.
... determine whether site contamination poses an actual or potential risk to human health and the environment, either on or off the site, of sufficient magnitude to warrant remediation appropriate to the current or proposed land use. In assessing that risk a balance is to be achieved between:
The broader objective of assessment is to ensure:
friable asbestos means asbestos that, when dry -
(a) may be crumbled, pulverised or reduced to powder by hand pressure; or
(b) as a result of a work process becomes such that it may be crumbled, pulverised or reduced to powder by hand pressure;
When in good condition, bonded asbestos products do not release asbestos fibres into the air and are considered safe for people who are in contact with them, including when carrying and handling these materials (enHealth 2012).
[Tribunal emphasis]
... material that is in a powder form or that can be crumbled, pulverised or reduced to a powder by hand pressure when dry, and contains asbestos.
... a soil level of 0.01% for friable asbestos should keep asbestos fibre levels in air below 0.001 fibres per millilitre (f/ml) and probably to around 0.0001 f/ml. This corresponds to a lifetime risk of 10-6 to 10-5 in the exposed population from airborne asbestos fibres using WHO (2005) risk figures for mesothelioma...
The WADOH Guidelines adopt the following Health Screening Levels ('HSL') for asbestos:[81]
The basis for the screening criteria is two-fold.
DOH applied this criterion to the less hazardous bonded ACM, depending on on-site use. These mirror the Assessment of Contaminated Sites (ASC) National Environmental Protection Measure (NEPM) (1999) site uses and associated default exposure ratios.
A lower criterion has been applied to both FA and AF as activity and disturbance may result in the suspension of smaller particles from FA and AF in air. The 100mg/kg was divided by a factor of 10 to account for greater dryness and dust-generating potential of local soils and the fact that current exposure standards (external site) treat the mineralogical forms of asbestos as equivalent.
Note: For low concentration exposures (cumulative exposure of less than 0.01 f/mL.yr), the risk of mesothelioma, the most applicable health outcome from crocidolite fibre (the most potent fibre), is low. There are generally accepted quantitative estimates of disease, extrapolated from dose-response relationships established for higher occupational exposures. These are those presented by WHO (2000) and Hodgson and Darnton (2000). The estimates suggest that asbestos exposure below 0.0002 f/mL.yr is likely to be less than the lifetime risk of 1 x 10-5 and possibly less than 1 x 10-6 (WHO 2000 and Hodgson and Darnton, 2000). These are lifetime cancer risks estimates that are broadly acceptable for environmental contaminant hazards.
A Tier 1 assessment is a risk-based analysis comparing site data with generic investigation and screening levels for various land uses to determine the need for further assessment or development of an appropriate management strategy.
... If the Tier 1 screening levels are not exceeded, and an appropriate level of investigation has been carried out, then no contamination management actions are required except for ensuring the surface soil is free of visual asbestos. This may be achieved by multidirectional raking or tilling and hand-picking of exposed fragments of bonded ACM. Final visual inspection of the assessment and remediated areas should not detect any visible asbestos.
...
If exceedences [sic] of the Tier 1 screening levels are present, either a Tier 2 analysis should be carried out or a conservative management response implemented. The Tier 2 assessment will comprise a qualitative assessment of risk in many cases and should take into account the nature and extent of contamination; the site-specific exposure scenario(s) including the intensity of relevant site activities; the impact of any mitigating factors such as soil type and soil moisture conditions (and likely variation); the proposed remediation and management measures; and the final use of the site.
Remediation options which minimise soil disturbance and therefore public risk are preferred. Management of asbestos in situ is encouraged, which may include covering the contamination with uncontaminated fill or other protective or warning layers. It should be noted that the common alternative of complete removal of asbestos from a site often involves extensive and costly investigative and validation sampling and may not be effective or necessary for the protection of human health.
**PART 3: INFORMATION ABOUT ARC'S PROPOSAL AND PROCEEDING
The operation of current landfill activities on the Premises
[original emphasis]
An exemption is not a permission: as the word indicates, it excludes an activity and removes it from the permissions regime.
[original emphasis]
... appropriate role in relation to public health issues, including community concerns about exposure to asbestos.
... to cover all activities with significant impacts (or potential impacts) on human health and the environment, regardless of the type of hazard posed.
... a modernised and streamlined framework for EPA granting permissions to engage in certain activities. This will provide EPA with greater flexibility to apply proportionate, cost-effective regulatory controls to high-risk activities through licensing, registrations and permits.
... to establish a permissions scheme that enables the Environment Protection Authority to issue or grant development licences, operating licences, pilot project licences, permits and registrations;
... the purpose of s 80 is to provide for simple, limited or short-term exceptions for particular activities or operations, for example; activities that are secondary or incidental to an existing permitted activity.
Thus it is not to be supposed that the power in s 80 of the EP Act was enacted with the object of enabling an exemption that entirely negates the default requirement for a permission and thereby to thwart the legislative purpose. The narrower construction of the exemption power is reflected in practice [where the Authority here referred to various examples of where it has granted exemptions] and in policy.
[footnotes omitted]
... reflects the low risk profile of the ARC proposal, especially in comparison to other soil remediation and processing operations.
(a) Occurs throughout Victoria.
(b) Is, as ARC understands it, unregulated by the EPA.
(c) Is undertaken on individual development sites, which may be close to existing sensitive uses.
(d) Is not undertaken in an environment such as a landfill, which is regulated by the EPA, and operated by a landfill operator licensed to receive asbestos waste, and with expertise and experience in managing asbestos.
(e) Applying the Fill Determination, the Occupational Health and Safety Regulations 2021 ("OHS Regulations"), EPA Publication 1828.211 ("EPA Publication 1828.2") and EPA Publication 1968.1 ("EPA Publication 1968.1") would only have to remove visible ACM as far as practicable and would not be required to undertake any testing, unless there was a risk of FA/AF in the soil, based on the guidance set out in the relevant publications.
(f) Can involve the processing of soil containing AF/FA to produce Fill Material.
(g) Can consign Fill Material for use on sites used for sensitive purposes.
(h) Do not have anything like the rigorous controls, screening and testing processes in place as proposed by ARC
The nature of an exemption within the EP Act statutory framework for permissions
noun 1. the act of exempting.
2. the state of being exempted; immunity.
verb (t) 1. to free from an obligation or liability to which others are subject; release: to exempt someone from military service; to exempt a student from an examination.
-adjective 2. released from, or not subject to, an obligation, liability, etc.: exempt from taxes.
-noun 3. someone who is exempt from, or not subject to, an obligation, duty, etc.
are all important elements to take into account because it is these elements that provide a level of control and require oversight of the exemption by the Authority.
The power of the EPA to exempt occupiers of scheduled premises from the work's [sic] approval system is not intended to be exercised except in the most stringent circumstances.
ARC is required to comply with the GED in undertaking the proposal. To do otherwise would result in an outcome that would be inconsistent with the purposes of the EP Act and this duty.
... the Authority or council may specify that a permission is subject to a condition -
(a) specifying measures the permission holder must take to comply with the general environmental duty when engaging in the permission activity; ...
(1) The objective of the Authority is to protect human health and the environment by reducing the harmful effects of pollution and waste.
(2) The Authority must exercise its powers and perform its duties and functions under this Act or any other Act for the purposes of achieving the objective set out in subsection (1) to the extent that it is practicable to do so having regard to the nature of the power being exercised or the duty or function being performed.
(a) to minimise litter and waste disposal by encouraging the management of waste in accordance with the waste management hierarchy; and
(b) to promote waste reduction, resource recovery and resource efficiency; and
(c) to minimise the impact on human health and the environment from waste generation and waste disposal.
[Tribunal emphasis]
ASSESSMENT: THE RISK TO HUMAN HEALTH AND THE ENVIRONMENT
OHS Regulations under Division 5 and Regulation 225 - 232 would still apply to abated soils;
The EP Regulations 2021 do not identify a minimum concentration of asbestos in soil when identifying that fill material 'does not contain asbestos';
Whilst EPA guidance 1828.2 and 1968.1 indicate that if visible asbestos is removed from soil it is no longer classified and 'soil containing asbestos'; however:
Condition 6 (2) of the EPA Fill Material designation identified that the waste receiver must not accept any waste soil classified as fill material excavated from contaminated land unless the waste generator has provided evidence of the soil classification, including any laboratory analysis, carried out in accordance with Regulation 62(1)(b) of the Regulations, where:
EP Regulation 62 Classifying soil sourced on-site from contaminated land states:
(1) A person who has the management or control of soil sourced on-site from contaminated land that is industrial waste must, as soon as practicable after sourcing the soil, classify the soil by -
(a) determining whether the soil is also priority waste; and
(b) subject to subregulation (2), determining that the soil is priority waste if the soil -
(i) has contaminant concentrations exceeding the upper limits for fill material contaminant concentrations specified in the Waste Disposal Categories - Characteristics and Thresholds; or
(ii) contains asbestos.
As such, ARC would potentially be required to undertake sampling to classify the processed waste soils as fill material in accordance with Regulation 62 to demonstrate that the soil is not a priority waste, including confirming there is no asbestos in the soil, noting the Regulations do not state the asbestos has to be 'visible'.
[Original emphasis]
It always makes commercial sense for ARC to have a full understanding of the nature of the source site that the contaminated soil has come from, and the nature of the contaminated soil, before accepting the soil for processing, and before undertaking the rigorous testing regime proposed. ARC will only want to process contaminated soil that is confirmed to have bonded ACM only. Otherwise, ARC will suffer a financial disbenefit in that it will incur the cost of testing and processing the soil, and, if the soil has any FA/AF in it, the cost of depositing that soil into Cell 7 (and the associated loss of Cell 7 airspace).
Whether granting the proposed exemption may result in adverse effects
as set out in Appendix 4 - waste acceptance table of that licence and conditions OL_WA2 and OL_L7.1.
You must cover waste asbestos immediately upon deposition in one of these ways: a) with a layer of waste (not including waste asbestos) at least 1 metre thick or a layer of soil at least 0.3 metres thick; or b) using alternative cover approved by the Authority in writing.
Soil containing fibrous asbestos will not be accepted
... contamination of land arising from a particular waste or a chemical substance that is not specified in section 6 of Schedule B1 to the NEPM (ASC), other than contamination arising from -
(i) asbestos described in regulation 9;
For the purposes of section 37(a) of the Act, the presence of friable asbestos in or on soil on land is prescribed notifiable contamination if a person is, or is likely to be, exposed to airborne asbestos fibre levels of above 0·01 fibres per millilitre by means of inhalation.
There are many uncertainties related to understanding the exposure to airborne asbestos fibres. Complications for completing an exposure assessment include the:
The transport of soil containing asbestos only is already regulated.
The receival and treatment stage of the ARC proposal
Process undertaken using the plant and equipment
Table of Applied, Adopted or Incorporated Matter
The following table of applied, adopted or incorporated matter was included in S.R. No. 47/2021 in accordance with the requirements of regulation 5 of the Subordinate Legislation Regulations 2014.
Publishing with table of incorporated matter
(1) If a statutory rule applies, adopts or incorporates any matter contained in a document, the statutory rule must be published with a footnote or endnote containing a table -
- specifying the document referred to in the statutory rule that contains the matter that is applied, adopted or incorporated; and
- indicating the provision of the statutory rule to which the matter applied, adopted or incorporated relates.
(3) No marginal note, footnote or endnote in an Act or subordinate instrument and no heading to a provision of an Act or subordinate instrument (not being a heading that forms part of the Act or subordinate instrument by force of subsection (1), (1A) or (2A)) shall be taken to form part of the Act or subordinate instrument.
(4) Nothing in subsection (3) shall be construed as preventing in the interpretation of a provision of an Act or subordinate instrument, the consideration pursuant to section 35(b) of any marginal note, footnote, endnote or heading not forming part of that Act or subordinate instrument.
35 Principles of and aids to interpretation > > In the interpretation of a provision of an Act or subordinate instrument -
(a) a construction that would promote the purpose or object underlying the Act or subordinate instrument (whether or not that purpose or object is expressly stated in the Act or subordinate instrument) shall be preferred to a construction that would not promote that purpose or object; and
(b) consideration may be given to any matter or document that is relevant including but not limited to -
(i) all indications provided by the Act or subordinate instrument as printed by authority, including punctuation; ...
soil -
(i) [that] has contaminant concentrations exceeding the upper limits for fill material contaminant concentrations specified in the Waste Disposal Categories - Characteristics and Thresholds; or
(ii) contains asbestos;
the separation of the asbestos from other contaminants by way of the text in each provision does not separate the application of the whole of the Waste Disposal Categories.
Potential for impacts outside of the premises from process on the premises
The best available techniques or technologies for engaging in the prescribed activity
ASSESSMENT: THE PROCESSING OF THE EXEMPTION APPLICATION AND THE IDENTITY OF THE APPLICANT
... whether the person has demonstrated to the Authority or council that the person has the financial capacity to comply with any obligations imposed by a permission; ...
a critical piece of information that's lacking for the tribunal ... to assess ARC's financial capacity to meet the costs of all the controls necessary in this proposal if they were attached as obligations imposed by a permission.
As part of the transitioning works, ARC intends to include the remediation of asbestos-contaminated soil on-site. This will involve taking asbestos contaminated soil from the community and remediating the material at ARC. The remediation works involve separating the asbestos material from the soil. This will involve the use of specialised equipment. The asbestos will be permanently disposed into ARC's EPA licensed landfill cell. The soil will be repurposed to benefit the community, rather than taking up critical landfill space.
ASSESSMENT: WHETHER IT IS IN THE PUBLIC INTEREST TO GRANT THE EXEMPTION
Is it in the public interest to grant the exemption?
You must immediately notify the Authority by calling 1300 EPA VIC (1300 372 842) in the event of:
(a) a discharge, emission or deposit which gives rise to, or may give rise to, actual or potential harm to human health or the environment;
(b) a malfunction, breakdown or failure of risk control measures at the site which could reasonably be expected to give rise to actual or potential harm to human health or the environment; or
(c) any breach of this exemption.
You must notify the Authority within 48 hours of the occurrence of any the following:
(a) any change to your name or address (including your registered address and site as applicable); or
(b) a change to an officer (as defined in the Act).
You must update the EPA Portal if any other relevant administrative details for your business change.
Waste from the activity site allowed under this exemption must not be discharged or disposed of to the environment except in accordance with this exemption or with any permission or approval issued by the Authority that may relate to the activity site.
A copy of this exemption must be kept at the activity site and be easily accessible to persons who are engaging in an activity conducted at the activity site. Information regarding the requirements of the exemption and the Act duties must be included in site induction and training information.
This exemption expires:
(a) on the issue or amendment of an operating licence or permit relating to all activities covered by this exemption;
(b) when the Authority advises in writing that all activities covered by this exemption have been satisfactorily completed and the issue or amendment of an operating licence or permit is not required; or
(c) on the expiry date listed on the front page of this exemption.
Subject to the conditions of this exemption, you are authorised to: install, construct and commission on Cell 3 of the 500 Sunbury Road facilities, processing plant, equipment and a secure activity area to receive and process soil containing only visible bonded asbestos material for the purpose of removing asbestos by using a screening plant and spreading the soil and hand raking and hand picking.
Other than for the purposes of commissioning of plant, equipment and processes hereby authorised under this exemption you are not authorised under this exemption for any other operation of said plant or equipment or receipt of loads of soil containing asbestos only for treatment.
The processing plant and equipment covered by this exemption includes the installation of the following:
(a) a screening plant and associated plant and equipment needed to support the screening plant operations as per the application;
(b) incoming soil storage bays as per the application and requirements in EX_D01 (c) and (d);
(c) screened soil storage bays as per the application and the requirements in EX_D01 (c) and (d);
(d) dust suppression control measures as per the application and the requirements in EX_D01 (e) and (f);
(e) an impermeable geofabric layer overlain by compacted rock or compacted earth layer over the 50,000 m2 processing activities area as per the application and requirements in EX_D01 (g); and
(f) a contaminated stormwater collection and treatment system for the entire activity area as per the application and the requirements in EX_D01 (h).
(a) identifies all the risks of harm to human health and the environment which may arise from the activities you are engaging in at your activity site;
(b) clearly defines your environmental performance objectives;
(c) clearly defines your risk control performance objectives;
(d) describes how the environmental and risk control performance objectives will be achieved;
(e) identifies and describes how you will continue to eliminate or minimise the risks in 1(a) (above) so far as reasonably practicable; and
(f) describes how the information collated in compliance with this clause, is or will be disseminated, used or otherwise considered by you or any other entity.
(a) documented in writing;
(b) signed by a duly authorised officer of the licensed entity; and
(c) submitted to the Authority for its approval.
(a) Clearly state that soil received for treatment must only contain visible asbestos or visible asbestos containing materials.
(b) Clearly state that soil must not be sourced from land that is part of notifiable contaminated land because of the presence of friable asbestos in or on the soil on that land as defined by section 37 of the Environment Protection Act 2017 and regulation 9 of the Environment Protection Regulations 2021.
(c) Require that prior to the acceptance of soil at the activity area hereby authorised under the exemption:
(i) All sites from which soil containing visible asbestos is sourced must be inspected by the environmental scientist/hygienist and the licensed asbestos removal contractor.
(ii) Following the source site inspection, the environmental scientist/hygienist and licensed asbestos removal contractor must confirm in writing to the exemption holder that the soil material is acceptable for treatment in accordance with the approved ROMP and RMMP or otherwise state that the soil is not acceptable.
(d) Incoming loads of soil must be sampled for laboratory analysis in accordance with the ROMP at the following rates:
(i) for multiple loads from the same source site, at a rate of 1 sample per 500 cubic metres or part there of
(ii) for any load from a single source site that is not greater than 500 cubic metres, one sample per each load received from that source site.
(e) Provide further details of dust suppression measures to reduce the likelihood of airborne emissions from the stockpiles, including but not limited to boundary mist systems, dust suppression systems directed onto pre- and post- treatment soil stockpiles and treatment trains.
(f) Provide further details of the air monitoring program and remedial responses to any incident of asbestos fibres being detected in the air at a level of more than 0.01 fibres/ml.
(a) documented in writing;
(b) signed by a duly authorised officer of the licensed entity; and
(c) submitted to the Authority for its approval.
Prior to the commissioning of the plant, equipment and processes hereby authorised under the exemption you must:
(a) Appoint an independent Licensed Asbestos Removal Contractor to carry out the assigned duties in the approved ROMP, which must include but are not limited to:
(i) inspect source sites to evaluate if the condition of soil is acceptable for processing;
(ii) have an understanding of the asbestos contamination being received at the site;
(iii) prepare and implement risk minimisation plans for asbestos remediation works;
(iv) handpick and remove visible asbestos containing materials from soil where identified;
(v) appropriately package asbestos waste materials for disposal in the onsite cell;
(vi) implement contingency procedures in the event of friable asbestos being identified; and
(vii) ensure stockpiles are managed to proactively minimise dust risks and cross contamination.
(b) Appoint an independent Environmental Consultant/Hygienist to carry out the assigned duties in the approved ROMP, which must include but are not limited to:
(i) inspect source sites to evaluate if the condition of soil is appropriate for processing;
(ii) review environmental site assessment including site history and waste classification documentation prior to loads arriving onsite to confirm that there is no likelihood of friable asbestos or disintegrated bonded asbestos being present in the loads;
(iii) evaluate whether asbestos has been appropriately characterised at source sites and make recommendations for further assessment;
(iv) undertake soil sampling for laboratory analysis in accordance with the most current version of the standard AS 4964 at pre-acceptance and pre-dispatchment of soil;
(v) visually inspect soil (at pre-acceptance, processing and pre-dispatchment) for the presence of friable asbestos or asbestos fibres;
(vi) assist with stockpile management and establishing environmental control measures;
(vii) assist with implementing contingency procedures;
(viii) monitor compliance with environmental commitments and obligations;
(ix) assist with achieving hygiene requirements of asbestos remediation work (i.e. providing air monitoring, conducting clearance inspection and issuing clearance certificates); and
(x) liaise with site management regarding corrective, preventative improvement actions to better manage the overall soil processing operation.
(c) Engage an Environmental Auditor (appointed under the Environment Protection Act 2017) to:
(i) Conduct independent reviews and endorsements of the RMMP and ROMP prepared under conditions EX_08 and EX_09 of this exemption to confirm that these documents satisfactorily meet the conditions of this exemption;
(ii) Prior to the application to commence commissioning in accordance with the Commissioning Plan, provide written independent confirmation that the development has been prepared and completed in accordance with all the requirements and authorisations set out under this exemption and is consistent with the approved ROMP and RMMP.
(iii) Conduct an independent review and endorse the Commissioning Plan to confirm that the Commissioning Plan is consistent with the RMMP and ROMP and any other operational requirements of the development hereby authorised under this exemption.
(iv) Independently confirm in a written statement that the commission activities carried out under this exemption have been undertaken in accordance with the conditions of this exemption, and the ROMP and RMMP, including by way of on-site observations and verification of data in the commissioning report, and state whether the environmental auditor agrees or disagrees with conclusions drawn from the commissioning report about the performance of the development in the commissioning phase and make any recommendations for the future operation of the development so as to meet the performance requirements set out in the ROMP and RMMP or otherwise comply with all relevant duties under the Environment Protection Act 2017.
(a) Conduct independent reviews and endorsements of the RMMP and ROMP prepared under conditions EX_08 and EX_09 of this exemption to confirm that these documents satisfactorily meet the conditions and requirements of this exemption.
(b) Provide a written statement to you confirming that the RMMP and ROMP satisfy the conditions and requirements of this exemption.
Commissioning activities must be undertaken in accordance with the approved Commissioning Plan.
Commissioning must not cause or result in any breach of any permission or exemption issued by the Authority for the permission or exempted activity, except where authorised by a condition of this exemption.
During the commissioning period, you must only operate the development hereby authorised by this exemption in accordance with the approved Commissioning Plan and the requirements of EX_RO1.
(a) average testing times (laboratory testing turnaround times) required for incoming and screened materials;
(b) maximum and mean throughput rates recorded during the commissioning period;
(c) a mass balance over the commissioning period for incoming and outgoing materials and material disposed to landfill;
(d) used and available storage capacities at the start and end of each day during the commissioning period;
(e) a summary of air emissions monitoring results (with appended results for all air emissions testing) indicating mean, upper and lower detection concentrations of asbestos fibres.
(f) assessment of the projected performance to demonstrate that the air emissions from the asbestos containing soil processing operation can be improved or maintained at acceptable levels; and
(g) results from Pre-acceptance and Pre-dispatchment Testing and Evaluation Programs and confirmation of the effectiveness of the Post Abatement Clearance Certificate Process as specified in the approved ROMP, but not be limited to, the following:
(i) details of the soil source sites including location, dates, volumes;
(ii) results and findings of source site inspections and soil testing;
(iii) quality (e.g. description of soil including any contaminants, clay, moisture content) and quantity of soil received for processing;
(iv) quality (e.g. description of soil including any contaminants, clay, moisture content) and quantity of soil dispatched from the site;
(v) quantity of asbestos containing material disposed of at the landfill;
(vi) details of the post abatement soil receiver sites including location, dates, volumes and receiver inspection and testing information.
(a) A revised site layout plan showing where the incoming, processed and outgoing materials will be stored.
(b) Calculations of the capacity of the storage areas and systems put in place to prevent excess materials being retained on the site.
(c) Design of walled storage bays to store incoming and screened soil material.
(d) Dimensions of the stockpiles to be stored in the walled storage bays. This must include requirements that stockpiles must not exceed a maximum height of 3 m and exceed maximum volumes of 500 cubic metres for incoming (received untreated) soil material and 100 cubic metres of treated soil stored within each bay.
(e) Design of dust suppression sprinkling and misting systems to cover the entire activity areas, including automated systems.
(f) Design of the dust control measures at the screening plant (including screening and raking operations) to maintain soil in a damp condition by using water sprays and/or misters.
(g) Design of ground cover, such as geofabric material, or compaction clay layer, with permeability of 10-9 m/s for the entire site, as appropriate, with a protective cover layer.
(h) Design of the stormwater management system for the entire soil processing area (i.e. Cell 3) directing contaminated runoff to appropriate points of discharge or treatment systems. The stormwater management system must be designed for 1 in 20-year stormwater event.
(i) Design of an air monitoring program and air monitoring stations for dust and asbestos to confirm that the risk to human health and the environment is minimised (i.e. asbestos in air is less than 0.01 fibres/mL) within and beyond the boundaries of the activity area.
(a) the permeability of the ground cover and liner thickness;
(b) the effectiveness of stormwater control system; and
(c) installation of dust suppression measures and air quality monitoring infrastructure.
This exemption does not allow you to commission the developments that are the subject of your application, until you have received written approval from the Authority that conditions EX_D01, EX_D02 and EX_R01 of this exemption have been met.
You must notify the Authority when the developments covered by this exemption has been completed.
This exemption does not allow you to undertake any activities that are the subject of your application until the Authority has inspected the completed developments and provides written approval that such activities can be undertaken.
Following the completion of development and commissioning activities to the satisfaction of the Authority, you must submit an application for an Operating Licence or Operating Licence amendment for ongoing operation of the development works set out in condition EX_D01, including as necessary, a revised site plan. This application must be made at least 60 days prior to the expiry date of this approval.
At least 45 days before the commencement of any commissioning, you must submit to the Authority for approval:
(a) The RMMP as reviewed by the environmental auditor appointed under condition EX_10(3).
(b) The ROMP as reviewed by the environmental auditor appointed under condition EX_10(3).
(c) The written confirmation of the environmental auditor that confirms that the RMMP and ROMP have been prepared in accordance with the conditions of this exemption.
(d) A Commissioning Plan covering proof of performance for an adequate duration demonstrating how the new installations and pollution control measures are effective and the effectiveness of the approved ROMP. The proof of performance period must be adequate to gather statistically valid information from testing and analysis from a range of soil source sites representing the range of soil conditions and source sites likely to be encountered in future operations and address any other requirements of the Commissioning Report required under EX_C04.
(e) Detailed Contingency Procedures which will be followed in the event of friable asbestos or asbestos fibres being detected during the commissioning phase and any the detection of air emissions exceeding the limit of 0.01 Fibres/ml by the air monitoring program.
[1] The submissions and evidence of the parties, any supporting exhibits given at the hearing and the statements of grounds filed have all been considered in the determination of the proceeding. In accordance with the practice of the Tribunal, not all of this material will be cited or referred to in these reasons.
[2] Operating licence OL000011758 issued to ARC Pty Ltd, first issued on 14 February 1994 and amended 28 June 2022. Appendix 4 of that licence details the waste that may disposed of to the landfill which includes Treatment code D19 - landfill disposal of soil with asbestos only and D20 - landfill disposal of packaged waste asbestos: see TB p50.
[4] Sections 44 and 45 of the Environment Protection Act 2017 (Vic) apply.
[5] Guidelines for the Assessment, Remediation and Management of Asbestos Contaminated Sites in Western Australia, Government of Western Australia Department of Health, section 1.4 ('WADOH Guidelines'); Tribunal Book ('TB'), p5824.
[7] Sustainability Victoria, February 2021 (most recent update December 2022) ('ADM Plan'). Supplementary Tribunal Book ('STB'), p120.
[10] WADOH Guidelines, section 1.5.1; TB p5825.
[11] Ibid. See also the National Environment Protection Measures Schedule B1 - Guideline on Investigation Levels for Soil and Groundwater ('NEPM Schedule B1'), p77; TB p6009.
[13] WADOH Guidelines, section 1.5.2; TB p5825.
[15] Ibid. See also the NEPM Schedule B1, p78; TB p6010.
[16] WADOH Guidelines, section 1.5.3; TB p5826. See also NEPM Schedule B1, p77; TB p6009.
[20] For instance, when asbestos was found in a playground in a western suburb of Melbourne in April of 2024.
[21] Edition 2, December 2019, WorkSafe Victoria.
[22] To the extent that that document deals with their duties or obligations under that legislation. See the Compliance Code, p2.
[27] OHS Regulations Part 4.4 Asbestos and as discussed in the Compliance Code [235]-[246].
[28] ADM Plan, page 2, 5; STB pp124 and 127.
[29] Footnote from quote: 'Note that there are additional privately-owned landfills that manage their own asbestos and are not included in statewide infrastructure planning.'
[30] Footnote from quote: 'A desktop review of differences between EPA's Waste Transport Certificates (i.e. asbestos not disposed of by household removalists) and landfill levy (all disposed asbestos) data over a 12-year period demonstrates some variation, for which there are likely several causes. This data is expected to improve with better use of waste codes and with data collected through the work of the Asbestos Plan.'
[32] Footnote from quote: 'Population figures have been based on 2016 ABS census data'.
[34] Notice of making of a Determination in accordance with Regulation 5(5) of the Environment Protection Regulations 2021, Victoria Government Gazette, No. S 301 Friday 18 June 2021.
[36] Department of Climate Change, Energy, the Environment and Water.
[37] Guidelines for the Assessment, Remediation and Management of Asbestos-Contaminated Sites in Western Australia, 2021.
[38] Section 9 of the EP Act explains that 'A simplified outline of any portion of this Act set out in a section of this Act is intended only as a guide to readers as to the general scheme and effect of that portion of this Act'.
[47] Such a determination is made under regulation 5 of the EP Regulations.
[51] Dated April 2021; Release date 15 June 2021.
[58] See Fill Determination, clause 5. TB, p5686. We note here the clause 2 of the Fill Determination refers to receiving fill at a place or premises 'in accordance with the specifications set out in Clause 4...'. However, Clause 4 is headed 'Application' and details what waste or activity the Fill Determination does or does not apply to. Clause 5 is headed 'Specifications' and sets out the specifications to be met for the purposes of Regulation 63(b) of the EP Regulations. We have referred to the appropriate operation clause of this Fill Determination in our reasons.
[60] Item 85 of Schedule 5 is also a solid and sludge waste requiring special handling, being waste acid sulfate [sic] soil (Actual Acid Sulfate [sic] Soil and Potential Acid Sulfate [sic] Soil), other than item 83 of the table in Schedule 5.
[61] Waste Disposal Categories, p3; TB p5708.
[64] Waste Disposal Categories, p4; TB p5709.
[65] Waste Disposal Categories, p5; TB p5710.
[66] August 2021. Commencing at TB p5749.
[67] At page 2 of Publication 1968.1. TB p5750.
[68] At page 3 of Publication 1968.1. TB p5751.
[69] With respect to what is relevant to this proceeding.
[70] Pages 6-8 of Publication 1968.1. TB p5754-56.
[71] See pages 19 to 33 of Publication 1968.1. TB pp 5767-5781.
[72] Figure 10 of Publication 1968.1. TB p5767.
[73] Whether in conjunction with other contaminants at concentrations above Category D or not.
[74] Either Waste Tracker or an authorised alternative.
[78] See endnote Table of Applied, Adopted or Incorporated Matter included in the EP Regulations S.R. No. 47/2021, and regulations 4, 8, 11 and 13 of the EP Regulations.
[79] For completeness we note there is a comparable definition of friable asbestos in the OHS Regulations.
[81] WADOH Guidelines at section 3.8; TB p5844.
[85] Section 4.9 through to 4.11 of the NEPM; TB p5962-5966.
[86] The most recent amendment of which is dated 28 June 2022.
[87] EP Regulations, r 16(2) and schedule 1 Table items A05a and A01.
[88] Outline of Submissions on Behalf of Australian Recycling Corporation Pty Ltd, Part A - Comparative Assessment, 13 October 2023, [9]. Our emphasis added.
[89] Decision-Maker's Submission on Preliminary Question, 13 October 2023, [30].
[90] Schedule 5, item 83 of the EP Regulations.
[91] Regulations 16(1)-(2) and Schedule 1, table, item 1 of the EP Regulations.
[92] ARC's written submissions, [37]; STB, p78. This Improvement Notice replaced a clean up notice first issued in June 2018.
[93] The applicant became the registered proprietor of the premises on 3 December 2019: See ARC's written submissions, [34]; STB p78.
[94] ARC's written submissions, [38]; STB p78.
[95] See the application form at TB p1970 and description of the proposal at TB pp1984 and 1990 in supporting documentation.
[96] A01 Exemption Application - Asbestos in Soil Processing ARC, 500 Sunbury Road, Bulla, prepared by Prensa, November 2023; TB p1979.
[97] This schematic is contained in the Applicant Report November 2023 prepared by Prensa (TB p2027) and in the Asbestos in Soil Processing Area Plan August 2023 prepared by Prensa (TB p2202).
[98] The following summary is drawn from the Asbestos in Soil Processing Area Plan August 2023 prepared by Prensa, commencing at TB p2208 and Table 3 at section 10 of the Remediation Operations Management Plan ('ROMP') at Appendix I of the Prensa application report at TB pp2144-2146.
[99] Refer to the second exemption application prepared by Prensa in November 2023 at section 10 of Appendix I, TB pp2144-2146.
[100] The ROMP was presented as Appendix I in the supporting document that accompanied ARC's application; See TB, p2127.
[101] Set in sections 11 (Table 4), 12 (Table 5) and 13 (Table 6) of the ROMP, commencing at TB p2147.
[102] We have drawn on information from the Application Report dated November 2023 prepared by Prensa (commencing at TB 1979), the draft premises plan found at TB p2027 and Appendices I and J of that report: Asbestos in Soil Remediation Operations Management Plan commencing at TB 2128 and Asbestos in Soil Processing Area Plan August 2023 prepared by Prensa, commencing at TB p2202.
[103] Limit of reporting for a laboratory analytical method.
[104] [2023] VSC 353 ('Hanson Construction Materials').
[105] Conveniently the Tribunal Book filed in this proceeding includes this evidence and materials and from the first review proceeding. When we have referred to or relied on those matters, our citations will refer to the point references in this proceeding's Tribunal Book.
[106] As described in the Statement submitted pursuant to order 3 of the Tribunal's orders of 28 September 2023, 2 October 2023, [7k].
[107] See regulation 67 and schedule 6 of the EP Regulations.
[109] Regulation 16(2) of the EP Regulations states that 'For the purposes of section 45 of the Act, an activity set out in column 3 of the Table in Schedule 1 is a prescribed operating activity if the corresponding entry in column 4 of that Table specifies that the activity is a prescribed operating activity'.
[111] EPA's opening submission, 9 April 2024, [4].
[112] EPA's opening submission, 9 April 2024, [5].
[113] EPA's opening submission, 9 April 2024, [6].
[114] EPA's opening submission, 9 April 2024, [6].
[115] EPA's opening submission, 9 April 2024, [9].
[116] EPA's opening submission, 9 April 2024, [13].
[117] EPA's opening submission, 9 April 2024, [14], quoting from the Ministerial Advisory Committee independent inquiry into the EPA, page 230.
[118] EPA's opening submission, 9 April 2024, [15], quoting from the Explanatory Memorandum to the Environment Protection Amendment Bill 2018, Key Reforms at pages 2-3.
[119] EPA's opening submission, 9 April 2024, [20].
[120] EPA's opening submission, 9 April 2024, [21].
[121] Transcript of 18 June 2024, page 76, line 31.
[122] EPA's opening submission, 9 April 2024, [21.1].
[123] EPA's opening submission, 9 April 2024, [21.2].
[124] EPA's opening submission, 9 April 2024, [21.3].
[125] EPA's opening submission, 9 April 2024, [21.4].
[126] EPA's opening submission, 9 April 2024, [21.5].
[127] EPA's opening submission, 9 April 2024, [21.6].
[128] EPA's opening submission, 9 April 2024, [21.7].
[129] EPA's opening submission, 9 April 2024, [21.8].
[130] EPA's opening submission, 9 April 2024, [21.9].
[131] For instance, Argus Tallow Merchants Pty Ltd (EXM000300055); ACM Processing Pty Ltd (EXM000300111).
[132] Transcript of 18 June 2024, page 69, lines 3-4.
[133] See section 69(3)(a) and 74(3)(a) of the EP Act.
[134] Transcript of 18 June 2024, pp 24-28 and pp 34-38.
[135] Outline of submissions on behalf of Australian Recycling Corporation Pty Ltd, 9 April 2024, Revised 31 May 2024, [86].
[136] Outline of submissions on behalf of Australian Recycling Corporation Pty Ltd, 9 April 2024, Revised 31 May 2024, [87].
[137] Outline of submissions on behalf of Australian Recycling Corporation Pty Ltd, 9 April 2024, Revised 31 May 2024 [88]-[91].
[138] Outline of submissions on behalf of Australian Recycling Corporation Pty Ltd, 9 April 2024, Revised 31 May 2024 [92].
[139] Outline of submissions on behalf of Australian Recycling Corporation Pty Ltd, 9 April 2024, Revised 31 May 2024 [6], [9] and [10].
[140] Transcript of 18 June 2024, page 101, lines 25-26.
[141] Macquarie Dictionary online, Pan Macmillan Australia 2025.
[142] Macquarie Dictionary online, Pan Macmillan Australia 2025.
[145] Pursuant to section 455 of the EP Act.
[146] EP Act, s 456(1)(b) and as explained in the Charter, pages 15-17.
[154] Transcript of 18 June 2024, page 72, lines 28-29.
[155] EPA's opening submission, 9 April 2024, [21].
[156] EPA's opening submission, 9 April 2024, [6].
[157] Transcript of 18 June 2024, page 28, lines 6-31.
[158] EPA's opening submission, 9 April 2024, [21.4].
[159] Transcript of 18 June 2024, page 43, lines 12-16 in the context of the broader discussion at page 41, lines 13-31; page 42, lines 1-31; page 43, lines 1-31; page 44, lines 1-2.
[160] Transcript of 21 June 2024 page 483, lines 15-25.
[162] Transcript of 18 June 2024, page 69, lines 3-4.
[163] Transcript of 18 June 2024, page 23 lines 23-31, page 24 lines 1-19, page 73 lines 23-29.
[164] Provided by Lexi Nexis Publishers.
[165] Transcript of 18 June 2024, page 24 lines 1-10.
[168] Publication 1799.2, June 2021; commencing at TB p5720.
[169] Transcript of 18 June 2024, page 88, lines 12-14.
[170] Transcript of 18 June 2024, page 88, lines 19-21.
[171] Transcript of 18 June 2024, page 36.
[172] Evidence statement dated 19 July 2023 at [5.28.1] - [5.28.3]; TB p616.
[173] Outline of submissions on behalf of Australian Recycling Corporation Pty Ltd, 9 April 2023, [75].
[174] Outline of submissions on behalf of Australian Recycling Corporation Pty Ltd, 9 April 2023, [75]-[76].
[175] Outline of submissions on behalf of Australian Recycling Corporation Pty Ltd, 9 April 2023, [77]-[79].
[176] Outline of submissions on behalf of Australian Recycling Corporation Pty Ltd, 9 April 2023, [23].
[177] Outline of submissions on behalf of Australian Recycling Corporation Pty Ltd, 9 April 2023, [14].
[178] At Schedule B1, section 4.8, table 7 along with the WADOH Guidelines at section 3.8, table 3.
[179] Outline of submissions on behalf of Australian Recycling Corporation Pty Ltd, 9 April 2023, [15]-[19].
[180] Outline of submissions on behalf of Australian Recycling Corporation Pty Ltd, 9 April 2023, [21].
[181] Outline of submissions on behalf of Australian Recycling Corporation Pty Ltd, 9 April 2023, [22].
[182] Environmental auditors are appointed by the Authority under Part 8.3 of the EP Act.
[183] See for example the Authority's closing submissions. Transcript of 21 June 2025, p27/138 Lines 14-25.
[184] See section 4.7 of the NEPM; TB p5961.
[185] EPA's opening submission, 9 April 2024, [42].
[187] EPA's opening submission, 9 April 2024, [43]-[44].
[188] Transcript of 21 June 2024, page 431, lines 6-7.
[189] EPA's opening submission, 9 April 2024, [45].
[190] Transcript of 21 June 2024, page 483, lines 26-28.
[192] Outline of submissions on behalf of Australian Recycling Corporation Pty Ltd, 9 April 2023, [80]-[84].
[193] EPA's opening submission, 9 April 2024, [45].
[194] This likely reflects the limits on interests under section 434 of the EP Act for third party reviews of development licence decisions.
[196] Published by the Authority and publicly available on its website since 23 June 2021
[197] EPA's opening submission, 9 April 2024, [10].
[198] EPA's opening submission, 9 April 2024, [46]-[55].
Australian Recycling Corporation Pty Ltd
Environment Protection Authority [2025] VCAT 559