[2025] FWC 2799
General information, not legal advice.
Fair Work Commission
2025-09-19
Original judgment source is linked above.
s.437 - Application for a protected action ballot order
Proposed protected action ballot of employees of Metro Trains Sydney Pty Ltd
(1) MTS objects to questions 1 and 3, on the basis that the questions are defective and do not sufficiently identify the proposed industrial action such that it is capable of being answered as required by s. 437(3)(b) Act; and
(2) Otherwise, in respect of all questions, Metro Trains seeks an extension of the notification time to 5 days pursuant to s 414(2)(a) of the Act.
1.Performing work in a manner different from that in which it is customarily performed. [yes/no]
3.Bans, limitations, or restrictions (including changes to the performance of work resulting in bans, limitations, or restrictions) on the manner in which work is undertaken. [yes/no]
Moving now to the construction of s.437 itself, seen in its statutory context, all that the
section requires is that the questions should describe the industrial action in such a way that employees are capable of responding to them. If the questions are ambiguous or lack clarity there may be consequences for the bargaining representative and the employees if reliance is placed on the result of the ballot in taking industrial action. If the question or questions give rise to ambiguity, the conclusion may be reached that the industrial action specified in a notice under s.414 was not authorised by the ballot and that the action is not protected for the purposes of s.409(2). It is true that ambiguity or lack of clarity in the description of the industrial action is undesirable, but these are matters more appropriate for consideration under other provisions. It follows that in most cases the drafting of the questions will be a matter for the applicant.
In summary, therefore, an application for a protected action ballot order will comply with the requirement in 437(3)(b), and thus will have been "made under section 437" for the purpose of s 443(1)(a), if it specifies a question or questions, capable of being answered "yes" or "no" by the employees participating in the ballot, which propose(s) action of an identified character, kind or sort capable of constituting industrial action within the meaning of s 19(1). A question which meets these requirements can be expressed and understood in ordinary industrial English, and there is no requirement for legalism, technicality or pedantry in the drafting or analysis of such questions. In our view, the proposition that, beyond these requirements, the questions must be interrogated to identify ambiguity in aid of enabling "informed consent" goes beyond the text of the provision and constitutes a gloss on the statute. The concept of "informed consent" is inapposite to a protected action ballot since, unlike a vote to approve an enterprise agreement, there is no requirement for genuine agreement and those voting are not bound by the result (in the sense there is no requirement for any employee to actually take industrial action which has been authorised by a ballot and for which a s 414(1) notice has been issued).
As earlier stated, s 443(1) imposes a duty on the Commission to make a protected action
ballot order if the requirements of paragraphs (a) and (b) of the subsection are met. The
mandatory nature of s 443(1) is the most important factor governing the construction of s 443 as a whole.45 It should not therefore be considered that, in respect of a valid application for a protected action ballot order, the Commission is at large as to the terms of the order to be made subject to satisfaction of the content requirements in the section. The inference to be drawn from the mandatory nature of s 443(1) is that the order required to be made is one which gives effect to an application validly made under s 437. Thus, in respect of s 443(3)(d), we do not consider that the Commission has a general discretion to determine the questions which will be included in the order, or to simply exclude valid questions, independent of what has been applied for.
(b) Extension of the Notification Time - s 414(2)(a) of the Act
"443 When the FWC must make a protected action ballot order
(5) If the FWC is satisfied, in relation to the proposed industrial action that is the subject of the protected action ballot, that there are exceptional circumstances justifying the period of written notice referred to in paragraph 414(2)(a) being longer than 3 working days, the protected action ballot order may specify a longer period of up to 7 working days."
Section 463(5) of the WR Act is in all material respects the same as s.443(5) of the
Act. We consider the discussion extracted above is apposite to the phrase "exceptional
The determination of whether the circumstances in a particular case are 'exceptional'
involves an evaluative judgement. A proper approach to the exercise of the Commission's
discretion under s.443(5) requires first that a member identify or make findings about the
particular facts or circumstances in relation to the proposed industrial action which are said inform the evaluative judgement that such factors or circumstances are exceptional
circumstances. The phrase "exceptional circumstances" carries its ordinary meaning.
Secondly, there must be a consideration whether the identified exceptional circumstances are circumstances "justifying" a longer notice period. This also involves an evaluative judgement made on the basis of probative material. The use of the verb "justifying" in s.443(5) signifies that the identified exceptional circumstances must show or prove that it is reasonable or necessary or the circumstances warrant or provide good reason to require a longer period of written notice.
Thirdly, if the member is satisfied there are exceptional circumstances justifying a longer period of notice, there must be a consideration of whether to exercise the discretion and, if so, the additional period of notice that should be given in the circumstances (noting the
4. MTS is a joint venture of MTR Corporation, John Holland and UGL Rail.
5. MTS is the operator and maintainer of the metro train line known as the M1 Northwest and Bankstown Line. MTS has been the operator and maintainer of the Northwest metro line since 2014. In 2019, MTS was awarded the contract to include the Sydney city and southwest components of the M1 Line.
6. On 19 August 2024, the M1 Line expanded from its northwest stations (which operate from Tallawong to Chatswood) to six new stations in Sydney's CBD - Crows Nest, Victoria Cross, Barangaroo, Martin Place, Gadigal and Waterloo - and new platforms at Sydenham and Central.
7. The M1 Line is currently 51.5km of track with a total of 21 stations. It is expected that the M1 Line will expand into the southwest of Sydney (up to Bankstown) sometime in 2026.
8. Since January 2025, MTS is assisting in the testing and commissioning of the southwest extension to the M1 Line with some TCs working in the temporary control centre.
(a) a current average patronage (as at August 2025) of around 1.4 million customers per week, with a daily average of approximately 230,000 passengers on weekdays and 120,000 customers on weekends;
(c) running high-frequency, high-capacity services to major suburban centres including highly visited precincts for the education, residential, retail and health sectors, including at the Hills, Epping, Macquarie University, Macquarie Park, Chatswood, Central and Sydenham;
(d) cleaning and managing 21 stations and the assets located therein, including any lifts and escalators located therein;
(e) operating and maintaining 45 train carriages and 51.5km of track;
(f) providing electrical and engineering services for the M1 Line;
(g) operating the automatic train operation using communications-based train control signalling system via the OCC;
(h) monitoring the system during engineering hours (i.e. outside the times MTS operates passenger services);
(j) managing and maintaining assets worth approximately $1.35 billion .
10. MTS is a 24/7 operation. It operates passenger services between approximately:
(a) 4.00am to 12.30am the following day on Monday to Thursday;
(b) 4.00am to 1.30am the following day on Friday and Saturday; and
Between the above hours, the stations and M1 Line are closed for cleaning and maintenance. They may also be planned closures during non-peak times for additional maintenance.
11. The peak times for the use of metro trains on the M1 Line are 7-9am and 4-6pm on weekdays. During these times, on average, there are approximately 50,000 and 40,000, respectively, number of passengers travelling on the M1 Line.
12. Whilst we do not formally record data on the demographics of MTS passengers, I am informed and verily believe that many customers to use our services rely on the metro trains as their only method of transport. I also understand that our customer base includes:
(d) intellectually and physically disabled people;
(f) individuals working in essential healthcare services, such as health professionals; and
47. A stoppage of work which results in the partial or total shutdown of the M1 Line would impact on the travelling public that relies on the metro for transport. As set out in paragraph 9, this equates to approximately 1.4 million customers per week.
48. MTS is a party to Sydney Metro Alternate Transport Response Plan (ATRP) which:
(a) outline the response to minimise disruptions to the travelling public
(b) describes the responsibilities on operators, including MTS, in respect of unplanned outages, including MTS's consultation obligations with Sydney Trains and the Transport Management Centre; and
(c) outlines the alternate and replacement services available for each of the stations on the M1 Line, which in summary are:
(i) buses only (including bus replacement services) for the stations between Tallawong and Cherrybrook, and Macquarie Uni and North Ryde, Crows Nest, Victoria Cross, Gadigal and Waterloo;
(ii) trains (in addition to busses) for Epping, Chatswood, Martin Place, Central and Sydenham;
(iii) light rail (in addition to buses and trains) for Central; and
(iv) ferry (in addition to buses) for Barangaroo.
Certainly I concur that public transport is an importance service and that the public depends on it, and this justified sufficient time to allow for the communication of the affected services. This is particularly so where the passengers included children and special needs children and the members of the public.
trying to reach an agreement with Metro Trains, that there has been a notification time in relation to the proposed agreement, and that all of the requirements in s.443(1) of the Act have been met.
Ms O Badger, on behalf of Australian Rail, Tram and Bus Industry Union
Ms S Behpour, on behalf of the Association of Professional Engineers, Scientists and Managers, Australia.
Mr M Manucci of Counsel, on behalf of the Respondents.
[2] [2010] FWAFB 526, at [19].
[3] [2022] FWCFB 204 at [53] and [54].
[4] [2018] FWCFB 4011, at [22] to [25].
[5] [2016] FWC 3347, at [43]. See also Transit Australia Pty Ltd v. Transport Workers Union of Australia [2011] FWA 3410, 31 May 2011 at [36].
Printed by authority of the Commonwealth Government Printer
Australian Rail, Tram and Bus Industry Union
Metro Trains Sydney Pty Ltd [2025] FWC 2799