[2025] FCA 338
General information, not legal advice.
Federal Court of Australia
2025-04-10
Anderson J
Original judgment source is linked above.
(a) Jemena Eastern Gas Pipeline (1) Pty Ltd ();
(b) Jemena Queensland Gas Pipeline (1) Pty Ltd (QGP);
(c) Jemena VicHub Pipeline Pty Ltd; and
(d) Jemena Darling Downs Pipeline (3) Pty Ltd (DDP).
(a) for EGP, 1 March 2019 to 22 February 2022;
(b) for QGP, 1 March 2019 to 22 February 2022;
(c) for VicHub, 1 March 2019 to 16 December 2021; and
(d) for DDP, 1 March 2019 to 19 August 2019.
(a) impacted on the accuracy of information provided to AEMO for the operation of the capacity auction;
(b) had the potential in some instances to result in missed auction capacity, being capacity for which at least some demand existed but which was not made available through the capacity auction;
(c) had the potential in some instances to result in auction participants paying above what they otherwise would have paid; and
(d) had the potential in some instances to result in some participants bidding differently to what they otherwise would have bid.
(a) joint written submissions dated 1 April 2025;
(b) a Statement of Agreed Facts dated 15 August 2024 (SoAF) setting out the facts agreed between the parties regarding liability pursuant to s 191 of the Evidence Act 1995 (Cth) (EA), amended on 1 April 2025 (Amended SoAF);
(c) a Statement of Admissions and Further Agreed Facts dated 1 April 2025 (SAFAF) setting out the admissions made by the respondents for the purposes of the proceeding and additional facts relevant to penalty as agreed between the parties pursuant to s 191 of the EA; and
(d) proposed minutes of orders (Agreed Proposed Orders), setting out the relief which the parties submit is appropriate.
The capacity auction and auction quantity limits
(a) An "auction service" is a transportation service provided on a pipeline (or "auction facility") by a facility operator, being one or more of "forward haul", or "backhaul" auction services. It is available between certain "receipt points" and "delivery points" along the pipeline. Each combination of receipt point, delivery point and auction service on an "auction facility" comprises a separate "auction product".
(b) An "auction product" is the transportation capacity available between two points, used to provide auction services by means of an auction facility and in respect of which a bid may be submitted in the "capacity auction" (NGR, r 647(2)).
(c) "Firm services" are transportation capacity for use of a transportation service that is reserved capacity (NGR, r 647(2)(a)); and in normal operating conditions and even if a transportation facility is fully contracted for a gas day on a firm basis, to the extent consistent with accepted good industry practice:
(i) nominations made by other shippers do not affect the quantity of reserved capacity or the scheduling of a nomination for use of the reserved capacity; and
(ii) a nomination made before the nomination cut-off time for use of a transportation service on a gas day up to the quantity of a shipper's reserved capacity will be scheduled for the quantity nominated (NGR, r 647(2)(b)).
(a) reduce the search and transaction costs associated with procuring day-ahead capacity and aid the price discovery process for day-ahead capacity; and
(b) instil confidence in the capacity auction through the use of robust delivery, settlement, credit, curtailment and other risk management processes and governance arrangements.
(a) By 3pm on D-1, the respondents receive day-ahead nominations for transportation services from shippers.
(b) By no later than 4.30pm on D-1, the respondents provide AEMO with AQLs calculated for D for "product components" associated with "auction products" on their auction facilities. The AQLs for product components on the respondents' Auction Facilities were automatically calculated using the respondents' PypIT system. The PypIT system, which is explained in further detail later in these reasons, was ultimately the cause of the relevant contraventions.
(c) By no later than 5pm on D-1, shippers submit bids for auction products to AEMO.
(d) By no later than 5.30pm on D-1, AEMO determines the results of the capacity auction.
(e) At 5.32pm, AEMO provides the auction results to the respondents and, by no later than 6.30pm on D-1, the respondents give effect to the auction results.
(a) the difference (if any) between the physical capacity of the auction facility and amount of firm capacity nominated; and
(b) the difference (if any) between the capacity that is the subject of contracts for "firm services" and the amount of firm capacity nominated.
Circumstances giving rise to and comprising the respondents' contraventions
(a) each respondent used an information technology system called the PypIT system to calculate and determine AQLs provided to AEMO within the context of the capacity auction. The PypIT system was a system which had existed prior to the capacity auction, and which the respondents had opted to retrofit with new functionality to it to calculate and determine AQLs in the context of the capacity auction. The calculation of AQLs via the PypIT system was largely automated;
(b) the PypIT system and the information relied upon and contained in it was affected by 14 categories of error (as described in Annexure A of the orders). The 14 categories of errors can be classified into the following three types of error:
(i) nine errors in the design and/or implementation of the algorithm used to calculate AQLs, including in some instances because of misinterpretation of the requirements of the NGR and/or the CTA Procedures;
(ii) one human error in data entry, including undetected data inaccuracies that pre-dated the commencement of the capacity auction; and
(iii) four errors that arose from modifications or updates to the PypIT system which impacted the AQL algorithm and its interaction with other underlying data held in the PypIT system;
(c) Annexure A to the orders sets out the respects in which the parties agree as to:
(i) a summary of the nature of each category of error;
(ii) the pipeline affected; and
(iii) the number of gas days on which AQLs for one or more product components on a relevant pipeline were affected;
(d) the applicable time periods for each of the 14 categories of error have been identified and agreed between the parties. They are set out in paragraph 62 of the Amended SoAF, which is extracted in paragraph 1 of Annexure B to the orders. It suffices for current purposes to note that the applicable time period for each category of error varies, with the errors commencing on different dates, having been identified on different dates, and then rectified on different dates. The errors commenced as early as March 2019;
(e) by reason of the errors in Annexure A to the orders (except for the errors in row 2A), the number of erroneous AQLs provided to AEMO for each of the respondent's respective facilities was:
(i) 16,847 AQLs on the Eastern Gas Pipeline;
(ii) 16,738 AQLs on the Queensland Gas Pipeline;
(iii) 3,360 AQLs on the VicHub Pipeline; and
(iv) 1,341 AQLs on the Darling Downs Pipeline.
(f) by reason of the errors in Annexure A to the orders (except for the errors in row 2A), the number of gas days on which one or more erroneous AQLs were provided to AEMO, by means of a single data file for all respondents per gas day, for each of the respondents' respective facilities was:
(i) 949 on the Eastern Gas Pipeline;
(ii) 1,090 on the Queensland Gas Pipeline;
(iii) 653 on the VicHub Pipeline; and
(iv) 327 on the Darling Downs Pipeline.
(a) the circumstances set out in paragraph 28 above occurred, including that:
(i) 13 categories of error affected the design and/or implementation of the algorithm used to calculate AQLs, or arose from modifications or updates to the PypIT system over an extended period;
(ii) the applicable time periods for certain categories of error exceeded six months; and
(iii) the applicable time periods for certain categories of error were less than six months;
(b) each respondent contravened r 653(1)(a) of the NGR as described above;
(c) the respondents' practices, methods and acts relating to the calculation of the AQLs comprised the categories of practices, methods and acts set out in paragraph 67 of the Amended SoAF, which is extracted in paragraph 2 of Annexure B to the orders;
(d) the respondents' policies, procedures and training for staff that applied comprised those policies, procedures and training set out in detail at paragraph 68 of the Amended SoAF, which is extracted in paragraph 3 of Annexure B to the orders;
(e) by reason of the matters referred to in sub-paragraphs (a) to (d) above, the respondents did not calculate the AQLs in accordance with the Part 24 information standard;
(f) the number of gas days on which one or more erroneous AQLs were provided to AEMO by reason of the errors in Annexure A to the orders (except for the errors referred to in rows 2A and 3), by means of a single data file for all respondents per gas day, for each of the respondents' respective facilities was:
(i) 805 on the Eastern Gas Pipeline;
(ii) 1,082 on the Queensland Gas Pipeline;
(iii) 556 on the VicHub Pipeline; and
(iv) 161 on the Darling Downs Pipeline.
(a) r 653(1)(a) of the NGR on each of the gas days where AQLs for its respective facility were affected by one or more of the errors identified in Annexure A to my orders (except for the errors referred to in row 2A); and
(b) r 649(1) of the NGR on each of the gas days where AQLs for its respective facility were affected by one or more of the errors identified in Annexure A to my orders (except for the errors referred to in rows 2A and 3).
(a) it is in the public interest for the AER to seek to have the declarations made and for the declarations to be made. They submit the declarations will serve as a formal record of the contraventions, serve the public purpose of expressing the Court's disapproval of the respondents' contravening conduct, form part of the community's censure of the respondents' contravening conduct and serve an educative purpose in indicating to other facility operators of auction facilities how and why the contraventions occurred. They submit the AER has the role of applying to the Court for orders in respect of breaches of the NGR, and has a real interest in seeking the declaratory relief;
(b) the respondents, as the entities declared to have contravened the law, have an interest in opposing the relief. They submit this remains the case notwithstanding their admissions and agreement;
(c) the facts and admissions in the Amended SoAF and the SAFAF provide a sufficient factual foundation for the making of the declarations; and
(d) the proposed declarations relate to conduct that contravenes the NGR and contain sufficient indication of how and why the relevant conduct amounts to contraventions of the NGR.
(a) the nature and extent of the breach (s 234(a));
(b) the nature and extent of any loss or damage suffered as a result of the breach (s 234(b));
(c) the value of any benefit reasonably attributable to the breach that the person or, in the case of a body corporate, any related body corporate, has obtained, directly or indirectly (s 234(ba), noting that this factor was included from 29 January 2021));
(d) the circumstances in which the breach took place (s 234(c));
(e) whether the person has engaged in any similar conduct and been found to have breached a provision of the NGL, the Regulations or the NGR in respect of that conduct (s 234(d)); and
(f) whether the service provider had in place a compliance program approved by the AER or required under the NGR, and if so, whether the service provider had been complying with that program (s 234(e)).
[T]here is an important public policy involved in promoting predictability of outcome in civil penalty proceedings and that the practice of receiving and, if appropriate, accepting agreed penalty submissions increases the predictability of outcome for regulators and wrongdoers. As was recognised in Allied Mills and authoritatively determined in NW Frozen Foods, such predictability of outcome encourages corporations to acknowledge contraventions, which, in turn, assists in avoiding lengthy and complex litigation and thus tends to free the courts to deal with other matters and to free investigating officers to turn to other areas of investigation that await their attention.
Subject to the court being sufficiently persuaded of the accuracy of the parties' agreement as to facts and consequences, and that the penalty which the parties propose is an appropriate remedy in the circumstances thus revealed, it is consistent with principle and for the reasons identified in Allied Mills, highly desirable in practice for the court to accept the parties' proposal and therefore impose the proposed penalty. ...
(a) EGP: $1,700,269;
(b) QGP: $2,285,330;
(c) VicHub: $1,174,347; and
(d) DDP: $340,054.
[I]f a penalty is devoid of sting or burden, it may not have much, if any, specific or general deterrent effect, and so it will be unlikely, or at least less likely, to achieve the specific and general deterrent effects that are the raison d'être of its imposition.
Generally speaking, those engaged in trade and commerce must be deterred from the cynical calculation involved in weighing up the risk of penalty against the profits to be made from contravention.
The penalty must be at a level that a potentially-offending corporation will see as eliminating any prospect of gain. ...It is in this way that the statutory object of ensuring that contravention is not regarded as a mere cost of doing business is achieved.
(a) EGP: $1,700,269;
(b) QGP: $2,285,330;
(c) VicHub: $1,174,347; and
(d) DDP: $340,054.
Put simply, the position of the parties was that there were so many contraventions it was not helpful to seek to make a finding as to the precise number or to calculate a maximum aggregate penalty by reference to such a number. Rather, the better approach was to determine the penalty assisted by understanding the extent to which there was a certain number of courses of conduct leading to potentially a huge number of contraventions. The instinctive synthesis endorsed by the High Court in Markarian should then be conducted by reference to a recognition of the multiplicity of breaches, a broad view of the course or courses of conduct, and an assessment of the overall extent and seriousness of offending, together with all other relevant considerations, in particular deterrence. The comments of the Full Court in Singtel Optus Pty Ltd v Australian Competition and Consumer Commission [2012] FCAFC 20; 287 ALR 249 at 262-263 [52]- [55] support this approach.
Imposing penalties for multiple contraventions and the course of conduct principle
The 'course of conduct' principle provides that consideration should be given to whether multiple contraventions arise out of the same course of conduct or the one transaction, to determine whether it is appropriate that a concurrent or single penalty be imposed: Australian Competition and Consumer Commission v Yazaki Corporation (2018) 262 FCR 243; [2018] FCAFC 73 at [234] (Allsop CJ, Middleton and Robertson JJ). This operates to ensure that where there is an interrelationship between the legal and factual elements of two or more offences, the offender is not punished twice for what is essentially the same criminality: see Construction, Forestry, Mining and Energy Union v Cahill (2010) 269 ALR 1; [2010] FCAFC 39 at [39] (Middleton and Gordon JJ), cited with approval in Yazaki at [234]; see also Australian Building and Construction Cmr v Construction, Forestry, Mining and Energy Union (2017) 254 FCR 68; [2017] FCAFC 113 at [148] (Dowsett, Greenwood and Wigney JJ). The application of the 'course of conduct' principle requires "an evaluative judgment in respect of the relevant circumstances": see Australian Competition and Consumer Commission v Cement Australia Pty Ltd (2017) 258 FCR 312; [2017] FCAFC 159 at [425] (Middleton, Beach and Moshinsky JJ).
(a) caused a separate and factually unique type of error in the calculation of AQLs;
(b) affected different pipelines for a different number of gas days during the respective Relevant Periods; and
(c) existed for different time periods.
(a) the contraventions of r 649(1) of the NGR arose from the PypIT system containing multiple inadvertent errors during each of the Relevant Periods;
(b) the categories of error giving rise to the contraventions affected the design and/or implementation of the algorithm used to calculate AQLs, or arose from modifications or updates to the PypIT system over an extended period; and
(c) the "applicable time periods" for a number of the categories of error exceeded six months.
in common with criminal sentencing, determining a civil penalty usually involves multi-factorial decision-making, identifying and balancing all the factors relevant to the contravention, and where the result is arrived at by a process of "instinctive synthesis" of the relevant factors: Reckitt Benckiser at [44].
(a) EGP: $1,700,269;
(b) QGP: $2,285,330;
(c) VicHub: $1,174,347; and
(d) DDP: $340,054.
Nature and extent of the breach (s 234(a) of the NGL)
Nature and extent of any loss or damage suffered as a result of the breach (s 234(b) of the NGL)
(a) in relation to EGP, 1 March 2019 to 8 April 2019;
(b) in relation to QGP, 1 March 2019 to 16 September 2020;
(c) in relation to VicHub, 1 March 2019 to 21 March 2021; and
(d) in relation to DDP, for the entirety of the Relevant Period.
(a) five of the errors could only have resulted in Overstated AQLs;
(b) seven of the errors could have resulted in Understated AQLs. However, three of those errors did not understate AQLs on pipeline segments used by shippers in the capacity auction. One error occurred when no shipper had an auction service in place. Therefore, only three of these errors had the potential to result in higher auction clearing prices;
(c) two of the errors could have led to Overstated AQLs or Understated AQLs depending on the circumstances, but one of these errors occurred when no shipper had an auction service in place. Therefore, only one of these errors had the potential to result in higher auction clearing prices.
(a) the AQL provided to AEMO was understated;
(b) for segments and zones relevant to active auction services, the auction quantity bid for by participants was equal or more than the minimum of the reported AQLs, suggesting that there may potentially have been unmet demand for auction capacity; and
(c) the capacity auction clearing price was greater than zero; and
(d) there potentially was "missed" auction capacity, being capacity for which at least some demand existed but which was not made available through the capacity auction;
(e) auction participants were potentially overcharged on the actual cleared auction volumes; and
(f) if correct AQLs had been provided, on some occasions some participants might have bid differently.
(a) first, certain identified authorised overruns affected an AQL for a segment on the auction facility on which the shipper held an auction service;
(b) second, the capacity auction clearing price was greater than zero; and
(c) third, the AQL provided to AEMO and the transportation capacity won at the capacity auction were the same (meaning the capacity auction was fully subscribed).
(a) first, for segments and zones relevant to active auction services, as a result of an error in AQL calculations, an understated AQL was reported to AEMO;
(b) second, for segments and zones relevant to active auction services, the auction quantity won was equal to the minimum of the reported AQLs, suggesting that there may potentially have been unmet demand for auction capacity; and
(c) third, the capacity auction clearing price was greater than zero.
The value of any benefit reasonably attributable to the breach (s 234(ba) of the NGL - from 29 January 2021)
The circumstances in which the breach took place (s 234(c) of the NGL)
No prior similar contravening conduct (s 234(d) of the NGL)
No compliance program approved or required (s 234(e) of the NGL)
Size and financial position of the respondents (additional factors)
The sum required to achieve that object [of deterrence] will generally be larger where the company has vast resources .... It follows that it may be appropriate to impose a higher penalty on a very large corporation than would be the case if the corporation was small and had limited resources, irrespective of the profit derived from the contravention.
(a) SGSP bears some responsibility for the conduct of the respondents because the day-to-day operation of the respondents' Auction Facilities in relation to the capacity auction was managed by a single team; and
(b) SGSP's financial position is relevant to the respondents' ability to meet a substantial civil penalty.
(a) 2019 - $304 million
(b) 2020 - $304 million
(c) 2021 - $304 million
(d) 2022 - $338 million
Profitability of respondents' pipeline services
Deliberateness of the contraventions (s 234(a) and (c) and additional factors)
(a) initiating discussions with the AER in relation to AQL reporting errors in December 2020 and self-reporting on four occasions throughout 2021, including voluntarily providing information in respect of these self-reports;
(b) providing fulsome information and documents to the AER in response to compulsory information gathering notices issued under s 42(1) of the NGL on two occasions;
(c) responding fulsomely and in good faith to the AER's requests for information;
(d) attending mediation before the AER filed any lay or expert evidence;
(e) engaging meaningfully with the AER in respect of negotiating and filing a detailed joint SoAF containing concessions; and
(f) agreeing to resolve proceedings before the AER filed lay or expert evidence.
(a) AQL spot checks;
(b) AQL limit checks;
(c) PypIT system audits;
(d) Part 25 compliance reviews;
(e) contract configuration data audit;
(f) Internal Audit review of pipelines gas market reform management;
(g) review of the contract handover process; and
(h) service priority check supported by dashboard.
(a) the performance of daily and other procedural tasks required as a result of the capacity auction as set out in the GMR ComOps Manual;
(b) staff training regarding Parts 24 and 25 of the NGR (although, ultimately, the training module was not delivered to staff as it was superseded by a more detailed training session focussing on AQLs in August 2021 following the identification of the Authorised Overrun System error);
(c) protocols regarding additional time constraints to be applied to team members' activities when undertaking pipeline scheduling activities, including in relation to the calculation and reporting of AQLs;
(d) staff training regarding regulatory obligations for outages and capacity;
(e) providing staff with the Daily Cadence document which set out key activity steps and timing associated with the capacity auction, including the calculation and submission of AQLs; and
(f) a standard operating procedure for setting up new contracts and services for clients in the PypIT system, which included a checklist to ensure correct services were included in relation to the AQL calculation.
(a) further process improvement and automation to reduce the risk of human error within key operational processes;
(b) recruitment of an additional compliance analyst role created within the Commercial Operations team; and
(c) undertaking a strategic review of the PypIT system and associated vendor support arrangements.
(a) EGP: $1,700,269;
(b) QGP: $2,285,330;
(c) VicHub: $1,174,347; and
(d) DDP: $340,054.
(a) the criticality of accurate gas auction reporting to achieving the objective of the capacity auction;
(b) the significant number of erroneous AQLs which each respondent provided to AEMO;
(c) the significant number of gas days on which each respondent provided erroneous AQLs to AEMO;
(d) the period of time over which the contraventions occurred;
(e) that the respondents' contravening conduct impacted the accuracy of information provided to AEMO for the operation of the capacity auction; and
(f) that the practices, methods and acts (extracted in paragraph 2 of Annexure B to the orders), and the policies, procedures and training (extracted in paragraph 3 of Annexure B to the orders), of the respondents during the Relevant Periods were inadequate to ensure that AQLs were calculated in accordance with the Part 24 information standard.
(a) the respondents self-reported conduct and have cooperated with the AER throughout its investigation and this proceeding;
(b) the respondents made certain admissions about their conduct at an early stage of the proceeding and agreed to resolve the proceeding prior to the AER filing evidence or submissions;
(c) the conduct was not deliberate or covert, and the respondents took steps to rectify the errors;
(d) the respondents have made remediation payments to customers and have not received any quantifiable benefit as a result of the contraventions; and
(e) the conduct did not involve senior management.
I certify that the preceding one hundred and forty-nine (149) numbered paragraphs are a true copy of the Reasons for Judgment of the Honourable Justice Anderson.
JEMENA DARLING DOWNS PIPELINE (3) PTY LTD (ACN 127 059 152)
Australian Energy Regulator
Jemena Eastern Gas Pipeline
Australian Building and Construction Commissioner v Construction, Forestry, Mining and Energy Union [2017] FCAFC 113; 254 FCR 68
Australian Building and Construction Commissioner v Pattinson (2022) 274 CLR 450; [2022] HCA 13
Australian Competition and Consumer Commission v BlueScope Steel Ltd (No 6) [2023] FCA 1029
Australian Competition and Consumer Commission v Coles Supermarkets Australia Pty Ltd (2015) 327 ALR 540; [2015] FCA 330
Australian Competition and Consumer Commission v Reckitt Benckiser (Australia) Pty Ltd [2016] FCAFC 181; 340 ALR 25
Australian Competition and Consumer Commission v Uber B.V. [2022] FCA 1466
Australian Energy Regulator v Santos Direct Pty Ltd [2024] FCA 579
Australian Securities and Investments Commission v Firstmac Limited (Penalty Hearing) [2025] FCA 12
Australian Securities and Investments Commission v MLC Nominees Pty Ltd (2020) 147 ACSR 266; [2020] FCA 1306
Australian Securities and Investment Commission v Westpac Banking Corporation (No 3) (2019) 131 ACSR 585; [2018] FCA 170
Australian Securities and Investments Commission v Westpac Banking Corp (Omnibus) [2022] FCA 515; (2022) 159 ACSR 381
Commonwealth v Director, Fair Work Building Industry Inspectorate (2015) 258 CLR 482; [2015] HCA 46
Markarian v The Queen (2005) 228 CLR 357; [2005] HCA 25
NW Frozen Foods Pty Ltd v Australian Competition & Consumer Commission (1996) 71 FCR 285; [1996] FCA 1134
SingTel Optus v Australian Competition and Consumer Commission (2012) 287 ALR 249; [2012] FCAFC 20
Trade Practices Commission v CSR Ltd [1991] ATPR 41-076
Volkswagen Aktiengesellschaft v Australian Competition and Consumer Commission (2021) 284 FCR 24; [2021] FCAFC 49
(2015) 327 ALR 540
(2015) 258 CLR 482
(2005) 228 CLR 357
(1996) 71 FCR 285
(2012) 287 ALR 249
(2010) 269 ALR 1
(2018) 262 FCR 243
(2017) 254 FCR 68
(2018) 262 CLR 157
(2022) 274 CLR 450
(2021) 284 FCR 24
(2017) 258 FCR 312
(2014) 234 FCR 343