[2009] VCAT 17
Victorian Civil and Administrative Tribunal
2009-01-08
Mr P
Original judgment source is linked above.
Section 79 Planning and Environment Act 1987 - 8 lot subdivision - whether CFA a referral authority pursuant to clause 66.01 - whether clause 56 applies
AMS Pty Ltd v Maroondah CC [2009] VCAT 17
Mr R Easton, Town Planner, Easton Consulting Pty Ltd
Mr P O'Farrell, Barrister instructed by Rigby Cooke Lawyers
Section 79 Planning and Environment Act 1987
Total area of 2,832m², regular shape, 21.9m frontage, 129.7m depth
Does the land to be subdivided into lots contain an existing dwelling on each lot?
1 The use and/or development as shown on the endorsed plans must not be altered without the written consent of the Responsible Authority.
2 Prior to the issue of a Statement of Compliance for the subdivision, the areas set aside for parked vehicles and access lanes within the common property as shown on the endorsed plans must be:
(a) surfaced with an all-weather seal coat, with one of the following alternatives:
(i) 100 mm depth reinforced concrete on a 50 mm class 2 fine crushed rock bed with F72 reinforcing fabric fixed centrally.
(ii) A bituminous concrete surfacing consisting of a 40 mm compacted depth, size 10 aggregate, on a 150 mm depth bed of 20 mm, class 2 fine crushed rock bed.
(iii) A bituminous prime and seal or emulsion treatment using a cover of size 10 aggregate and a second cover of size 5-6 aggregate on a fine crushed rock bed as for (ii) above.
(b) line-marked to indicate each car space and all access lanes;
(c) provided with concrete kerbs or other barriers to prevent direct vehicle access to an adjoining road other than by a vehicle crossing;
(d) provided with a directional sign(s) to direct drivers to the area set aside for car-parking. The sign(s) must be located and maintained to the satisfaction of the Responsible Authority, and must not exceed 0.3 square metres each.
Parking areas and access lanes must be kept available for these purposes at all times.
3 The applicant or owner must pay to Council a sum equivalent to 5% of the site value of all land in the subdivision. This payment shall be made prior to the issue of a Statement of Compliance and may be adjusted in accordance with Section 19 of the Subdivision Act 1988.
4 Prior to the issuing of a Statement of Compliance, vehicle access to serve each lot in the subdivision shall be constructed and appropriately drained to the requirements and satisfaction of the Responsible Authority.
(a) except with the consent of the Responsible Authority, the development of any lot created by the subdivision of the land must be in accordance with the development authorised by Planning Permit No. M/2007/429 issued by Council and the various conditions included in that planning permit and the development depicted in the plans from time to time endorsed pursuant to that permit;
(b) in determining whether or not to give its consent, the Responsible Authority may consider any proposal against the provisions of any relevant design guide for medium density housing;
(c) the cost of the preparation or review of the agreement and its registration on the title to the land must be borne by the Owner of the land.
6 No polluted and/or sediment laden runoff is to be discharged directly or indirectly into Melbourne Water's drains or watercourses.
7 Prior to Certification, the Plan of Subdivision must be referred to Melbourne Water, in accordance with section 8 of the Subdivision Act 1988.
8 Prior to the commencement of works separate application, direct to Melbourne Water, must be made for any new or modified storm water connection to Melbourne Water's drains or watercourses. Prior to accepting an application, evidence must be provided demonstrating that Council considers that it is not feasible to connect to the local drainage system. Contact Asset Services on telephoned 9235 1414 for Melbourne Water's connection requirements, including payment of appropriate fees.
9 The Applicant or owner must enter into an agreement with SPI Electricity Pty Ltd for supply of electricity to each lot on the endorsed plan.
10 The Applicant or owner must enter into an agreement with SPI Electricity Pty Ltd for the rearrangement of the existing electricity supply system.
11 The Applicant or owner must ensure that any private electric line in the subdivision is rearranged to the satisfaction of SPI Electricity Pty Ltd.
Note: The existing overhead service to the front property (which is included in the Body Corporate) will need to be relocated to the Group metering location to comply with the Service and Installation Rules. Because you can only have one supply point into your property you will need to install Group Metering, a Mains control metering structure to supply the multiple units. This work must be carried out by a REC (Registered Electrical Contractor) and a Certificate of Electrical Safety sent to this office before a Statement of Compliance for your subdivision can be released.
(a) the subdivision plan is not certified within twelve (12) months of the date of issue of this permit; and
(b) Statement of Compliance is not obtained within five (5) years of the certification of the plan; or
any extension of such periods the Responsible Authority may allow, in writing, upon application made before or within three months after such expiry.
[1] Clause 56.09-3 Maroondah Planning Scheme Fire hydrants objective
To provide fire hydrants and fire plugs in positions that enable fire fighters to access water safely, effectively and efficiently.
* A maximum distance of 120 metres from the rear of the each lot.
Hydrants and fire plugs must be compatible with the relevant fire service equipment.
[2] Clause 32.01-4 Maroondah Planning Scheme
[3] Section 52(1) Planning and Environment Act 1987
AMS Pty Ltd
Maroondah CC [2009] VCAT 17