austlii:tas/TASCAT/2025/223
General information, not legal advice.
TASCAT
2025-12-05
Original judgment source is linked above.
Amplitel Pty Ltd v Break O'Day Council [2025] TASCAT 223
1. The decision of the Break O'Day Council to refuse a permit for development application DA 2024/00245 is set aside and substituted with a decision to grant a permit subject to the conditions of approval annexed to the Statement Between Planning Experts by Deb Szekely and Frazer Read dated 4 August 2025.
2. The Break O'Day Council is directed to issue a permit for DA 2024/00245 according with these orders within 14 days.
3. Any application for an order for costs in the appeal is to be made in writing with supporting submissions within 21 days. If no application is so filed each party is to bear their own costs.
Resource and planning - Planning appeal - Telecommunications tower - Building height - visual amenity - Whether cl C5.6.1A2 of the Tasmanian Planning Scheme is inconsistent with and prevails over cl 26.4.1A1
Clarence City Council v Resource Management and Planning Appeal Tribunal [2018] TASSC 41;
Refrigerated Express Lines (A/asia) Pty Ltd v Australian Meat & Livestock Corporation (No 2) [1980] FCA 38; (1980) 44 FLR 455;
Tabart v Central Coast Council [2024] TASCAT 178; Marching Ants (Tas) Pty Ltd v Launceston City Council & Ors [2021] TASRMPAT;
No Turbine Action Group Inc v Central Highlands Council [2025] TASCAT 162;
Mt Wellington Cableway Company Pty Ltd v Hobart City Council & Ors [2022] TASCAT 128;
Meander Valley Council v Resource Management and Planning Appeal Tribunal [2013] TASSC 42 [10]
(a) the performance criterion P1(b) of cl 26.4.1 of the Scheme; or
(b) the performance criterion P1.1 of cl C5.6.1 of the Scheme.
(b) minimises adverse impacts on adjoining properties and the visual character of the area.
(b) 15m if for a structure, such as a tower, pole or similar.
(a) be necessary for the operation of the use and not cause unreasonable impact on adjoining properties, having regard to:
(ii) separation from existing buildings on adjoining properties; and
(iii) any buffers created by natural or other features; and
(b) not unreasonably impact on the visual character of the area, having regard to:
(iii) visibility from adjoining roads and public open space.
That facilities do not cause an unreasonable loss of visual amenity.
Facilities located within existing utility corridors or on sites with existing facilities, must not cause an unreasonable loss of visual amenity, having regard to:
(ii) conceal facilities within the surrounding natural or built environment;
(c) the need to minimise clearing of vegetation; and
(d) functional and safety requirements to establish, operate and maintain facilities.
Does the proposal fall for assessment against cl 26.4.1 A1
Building height of freestanding towers must not be more than ... 30m in the ... Utilities Zone.
5.5 Operation of Codes > > 5.5.1 The codes identify areas of land or planning issues which require compliance with additional provisions. > > 5.5.2 Codes set out provisions for: (a) particular types of use or development that may apply to land in one or more zones; and (b) matters that affect land that are not appropriately described by zone boundaries. > > 5.5.3 Where there is an inconsistency between a provision in a code and a provision in a zone, the code provision prevails. > > 5.5.4 An inconsistency between a provision of a code and a provision of a zone does not exist if a code requires compliance with standards additional to those that apply within a zone. > > 5.5.5 The requirements and structure for code overlay maps and lists in the Local Provisions Schedules are set out in clause LP1.0 and Appendix A
Means a tower, pole, mast or similar structure used to supply a carriage service by means of telecommunication.
(i) the topography of the site:
(ii) any existing vegetation; and
(iii) visibility from adjoining roads and public open space.
The use of the adjective 'unreasonable' indicates that P1 contemplates that a reasonable degree of impact is to be tolerated. Unreasonableness is to be determined objectively and is a question of impression and degree and is to be assessed by reference to the particular circumstances of a given case: Tucker v State of Victoria [No 2] [2021] VSCA 182 [32]. The standard of reasonableness is to be determined by interpretation of the Scheme applying the ordinary approach to construction: Minister for Immigration and Citizenship v Li [2013] HCA 18 [67]. As noted in respect to the approach to 'necessary', the zone purpose statements will provide context for the assessment, as will the objective of cl 20.4.1, which includes to provide for a building height that "minimises adverse impacts on adjoining properties".
26.1 Zone Purpose > > The purpose of the Utilities Zone is: > > 26.1.1 To provide land for major utilities installations and corridors. > > 26.1.2 To provide for other compatible uses where they do not adversely impact on the utility.
(i) the topography of the site;
(ii) any existing vegetation; and
(iii) visibility from adjoining roads and public open space.
Means, in relation to a locality, place or building, any quality, condition or factor that makes or contributes to the making of the locality, place or building harmonious, pleasant or enjoyable".
(ii) conceal facilities within the surrounding natural or built environment;
(c) the need to minimise clearing of vegetation; and
(d) functional and safety requirements to establish, operate and maintain facilities.
Amplitel Pty Ltd
Break O'Day Council [2025] TASCAT 223
(1980) 44 FLR 455