The adequate resolution of traffic matters in light of changes within the public realm
Extract from page 34 of Traffix Group revised traffic engineering assessment dated 21 January 2025
Viewing location in Traffix Group assessment approaching the pedestrian crossing extracted from page 38
Viewing location in Traffix Group assessment just after the pedestrian crossing extracted from page 39
Following the upgrade works on Latrobe Street, an updated traffic report was prepared by our office.
As a part of this updated assessment, an additional site visit and capture of further videos/images was undertaken on the Latrobe Street approach to the sign.
...
The sign is mostly obscured along the eastbound approach, with the sign blocked out by buildings and vegetation on the north side of the Latrobe Street carriageway.
The sign will not be visible to drivers as they approach the pedestrian zebra crossing at the west side of the new tram stop, and accordingly, we are satisfied that this driving task will not be impacted by the sign.
Ultimately, although the upgrade works does make changes to the Latrobe Street carriageway (including the removal of a lane, introduction of pedestrian crossing and banning of the right turn movement), this does not fundamentally change the fact that the sign is mostly not visible to drivers as they navigate the eastbound approach.
Our legibility assessment is based on similar comparable existing electronic signs, and is based on the 85th percentile value of observed signs. Accordingly, we are satisfied that this adequately accommodates for the potential variability in content of the proposed sign.

Construction and display of an electronic major promotion panel sky sign
(a) be prepared to the satisfaction of the responsible authority
(b) be drawn to scale with dimensions
(c) submitted in electronic form
(d) be generally in accordance with the plans identified as those prepared by Adraeng (Drawing No. 15242-001, Revision b0, and dated January 2025), but amended to show the following details:
- the width of the sign structure,
- the rear elevation of the sign,
- the proximity of the sign to the parapet of the host building including the depth of the parapet, and the location of the sign relevant to the parapet including whether there is ability to move in front of the curved section of the sign,
- the colour of any structure for the sign (including any mesh panels and cladding) that blends in with the colour of the host building,
- the need for mesh triangular panels on either side of the sign to limit visibility of the rear of the sign and to retain the symmetry of the sign if desirable
- the need for cladding at the bottom of the sign to screen any structure for the sign and/or to provide for a company business logo on the structure.
(a) On site luminance measurements for Daytime, Evening/Morning Twilight and Night Time, based on a 100% white screen set to the maximum value for each lighting condition.
(b) Date and times of luminance measurements for the relevant lighting conditions.
(c) Details of the luminance meter used, including serial number. The luminance meter must have been calibrated by an appropriately certified Lab within the last 12 months. The date of calibration and Calibration Report Number shall be provided.
(d) A description of the luminance methodology used, including location and orientation of the luminance meter relative to sign, the image/content displayed on sign and number of measurement points taken. The signage should be measured with a 100% white image displayed, unless signage is a fixed colour/design.
(e) Photos of the sign for each sky condition measured, taken from the meter location.
(f) Indicative elevation plans of the signage showing the values of luminance at each measurement point.
(g) A summary showing the final average luminance of the signage for each relevant sky condition.
(h) A certification signed by a suitably qualified lighting consultant to undertake luminance measurements.
(a) The sign's luminance (cd/m² or as a percentage of its maximum luminance) in minimum 10-minute intervals.
(b) The sign's photocell (light sensor) reading of the ambient light in minimum 10-minute intervals.
(c) The dwell time and transition time between successive images.
All record information must be time and date stamped to show the time of measurement.
Compliance Records must be maintained for a minimum of 12 months.
(a) Giving the illusion of continuous movement.
(b) Capable of being mistaken for traffic signals or traffic control devices, including red, amber or green circles, octagons, crosses or triangles.
(c) Capable of being mistaken as an instruction to a road user, including the wording stop, give way, slow down, turn left or turn right.
(d) With a flashing background, flashing text, flashing images, blinking or fading elements that create the illusion of movement.
(e) Containing any animation.
(f) Capable of being interpreted as projections beyond the face of the advertising screen such as through 3D technology.
(g) Consisting of present time or other contemporary update information relating to news, weather or time.
(h) Containing video, movie or television broadcasts.
(a) The development is not started within two years of the date of this permit.
(b) The development is not completed within four years of the date of this permit.
The Responsible Authority may extend the permit if a request is made in writing before the permit expires, or within six months afterwards. The Responsible Authority may extend the time for completion of the development if a request is made in writing within 12 months after the permit expires and the development started lawfully before the permit expired.
[1] Section 4(2)(d) of the Victorian Civil and Administrative Tribunal Act 1998 (Vic) states a failure to make a decision is deemed to be a decision to refuse to make the decision.
[2] The submissions and evidence of the parties, the supporting exhibits given at the hearing and the material contained on the Tribunal's electronic file have all been considered in the determination of the proceeding. In accordance with the practice of the Tribunal, not all this material will be cited or referred to in these reasons.
[5] Mr Campbell's evidence statement at [96].
[6] Mr Campbell's evidence statement at [64].
[7] The applicant's submission at [75].
Adspace Outdoor Pty Ltd
Melbourne CC [2025] VCAT 879