Notations
- With respect to the amendments of the DA, the Court notes that:
1. Canterbury-Bankstown Council, as the relevant consent authority, has approved, under clause 55 of the Environmental Planning and Assessment Regulation 2000, to the applicant amending Development Application DA-52/2022 to rely upon the documents as follows:
No. Drawing No / Rev Drawing Title Prepared By Date
Architectural Plans
-
A000/E Cover Page/Apartment Schedule Doroch Architects 30/08/2024
-
A010/E Site Plan Doroch Architects 30/08/2024
-
A098/E Basement 2 Floor Plan Doroch Architects 30/08/2024
-
A099/E Basement 1 Floor Plan Doroch Architects 30/08/2024
-
A100/E Ground Floor Plan Doroch Architects 30/08/2024
-
A101/E Level 1 Floor Plan Doroch Architects 30/08/2024
-
A112/E Level 2 Floor Plan Doroch Architects 30/08/2024
-
A113/E Level 3 Floor Plan Doroch Architects 30/08/2024
-
A121/E Roof Plan Doroch Architects 30/08/2024
-
A141/E South & West Doroch Architects 30/08/2024
-
A142/E North & East Doroch Architects 30/08/2024
-
A151/E Sections Doroch Architects 30/08/2024
-
A161/E GFA Plans Doroch Architects 30/08/2024
-
A201/E Shadow Diagrams June 21 Doroch Architects 30/08/2024
-
A261/E Height Plane Diagram Doroch Architects 30/08/2024
-
A281/E External Perspectives Doroch Architects 30/08/2024
Stormwater Plans
17. 000/E Cover sheet Plan Civil & Stormwater Engineering Services Pty Ltd 30/08/2024
18. 101/K Stormwater concept Plan Basement Level 2 Sheet 1 of 2 Civil & Stormwater Engineering Services Pty Ltd 30/08/2024
19. 102/G Stormwater Concept Plan Basement Level 2 Sheet 2 of 2 Civil & Stormwater Engineering Services Pty Ltd 30/08/2024
20. 102.1/F Stormwater Concept Plan Basement Level 1 Civil & Stormwater Engineering Services Pty Ltd 30/08/2024
21. 103/O Stormwater Concept Plan Ground Level Civil & Stormwater Engineering Services Pty Ltd 12/09/2024
22. 103.1/G Longitudinal Section & External Drainage Plan Civil & Stormwater Engineering Services Pty Ltd 30/08/2024
23. 103.2/B Sections Details Civil & Stormwater Engineering Services Pty Ltd 30/08/2024
24. 104/J On-site Detention Details and Calculation Sheet Civil & Stormwater Engineering Services Pty Ltd 12/09/2024
25. 104.1/G OSD Catchment Plan Civil & Stormwater Engineering Services Pty Ltd 30/08/2024
26. 105/C Sediment & Erosion Control Plan & Details Civil & Stormwater Engineering Services Pty Ltd 30/08/2024
27. 106/G Miscellaneous Details Sheet Civil & Stormwater Engineering Services Pty Ltd 30/08/2024
Landscape Plan
28. EBLA-LD-GA01/F General Arrangement Plan EBLA Studio 12/09/2024
29. EBLA-LD-PP-01/F Planting Plan EBLA Studio 12/09/2024
30. EBLA-LD-CS-01/F Cross Section 1-4 Western Boundary EBLA Studio 12/09/2024
31. EBLA-LD-CS-02/F Cross Section 5-7 Frontage and Eastern Boundary EBLA Studio 12/09/2024
32. EBLA-LD-DE01/D Hardscape Details EBLA Studio 30/07/2024
33. EBLA-LD-DE02/D Hardscape Details 02 Steps and Fencing EBLA Studio 30/07/2024
34. EBLA-LD-DE03/D Softscaping Details and Notes EBLA Studio 30/07/2024
Supporting Documents
No. Document Date
35. Clause 4.6 Variation Request prepared by BMA Urban August 2024
revised 2 Oct 2024
36. Design Verification Report prepared by Doroch Architects September 2024
37. Waste Management Plan prepared by Doroch Architects 30/08/2024
38. NatHERS Certificate prepared by WSGL Designbuild Pty Ltd 03/09/2024
39. BASIX Certificate prepared by WSGL Designbuild Pty Ltd 03/09/2024
40. Letter in relation to overhead cable bundling prepared by Ausgrid 04/07/2024
41. Amended Flood Impact Assessment Report prepared by Civil and Stormwater Engineering Services Pty Ltd 30/07/2024
42. Flood Assessment Certificate prepared by Civil and Stormwater Engineering Services Pty Ltd 30/07/2024
43. Architectural Response Letter to Council's SOFC prepared by Doroch Architects 17/03/2024
44. Traffic Response Letter prepared by Varga Traffic Planning 26/03/2024
45. Stormwater Engineering Response Letter prepared by Civil and Stormwater Engineering Services 22/03/2024