Application under section 77 Planning and Environment Act 1987 against refusal of a permit; Bayside City Council; 77 units; Residential 1 zone; Design and Development Overlay - Schedule 4; Heritage Overlay No. 61; Special Building Overlay; Questions of law as to meaning of 'attic' and 'basement'; Two storey height limit in DDO1 excluding attic and basement; Whether remnant historic building should be retained; Flooding; Visual bulk and height; Design of roof form; Aspect from coast; Neighbourhood character; Internal amenity; Car parking and traffic.
Abacus Funds Management Limited and Hitchbar Pty Ltd
Abacus Funds Managament v Bayside CC [2006] VCAT 1869
The decision of the responsible authority is set aside. In permit application No. 5.2005/875 a permit is granted and directed to be issued for the land at 15 Beach Road Hampton. The permit will allow the construction of a double storey building with additional basement and attic levels including not more than seventy-six (76) apartments plus townhouses with roof terraces, access to a main road, buildings and works in a Design and Development Overlay 1 and Special Building Overlay and demolition of a building in a Heritage Overlay, generally in accordance with the endorsed plans.
The permit will be subject to the following conditions:
1
Before the use and/or development starts three copies of revised plans drawn to scale and dimensioned must be submitted to and approved by the responsible authority. When approved, the plans will be endorsed and will then form part of the permit. The plans must be generally in accordance with the plans considered and substituted by the Tribunal in Application for Review P752/2006 but modified to show to the satisfaction of the responsible authority:
(a)
The creation of a break in the apartment building roof (in the wing parallel to Beach Road) by raking the roof form away from either side of units 65 and 77 adjacent to the void over the main building entry. The pitch of the raked portions is to be generally consistent with the prevailing roof pitch. The roof form is to be designed to ensure any roof top plant behind remains hidden from view from surrounding land. Any consequential modifications to the internal floor layout and floating glass panel are to be shown.
(b)
The height of the apartment building lowered by 1m to RL16.6m.
(c)
The use of varied materials and finishes or other appropriate techniques to introduce greater articulation to the upper portion of the two storey walls of Units 47 and 48 that face No. 14 Beach Road.
(d)
The provision of appropriate screening measures in accordance with ResCode Standard B22 from the balconies and/or windows of Units 14, 17, 42, 47, 48, 58, 68, 69 and 72 which are within 9m of neighbouring residential properties. As an alternative to Standard B22, the applicant may demonstrate that balcony planter boxes and the floating glass panel are designed to limit overlooking into neighbouring land.
(e)
The conversion of Units 3, 4, 7, 8, 11 and 12 to double storey/mezzanine style apartments with living spaces provided at ground level for direct courtyard access.
(f)
The floor type to be constructed and finished floor levels to AHD confirming that no part of the finished ground floor level exceeds 1200mm above natural ground measured directly below.
(g)
All wall heights above ground level to be nominated on the plans.
(h)
All paving (except driveways and over the basement) to be permeable. Details of the permeability of the paving must be supplied to the satisfaction of the responsible authority.
(i)
A schedule of all external materials and finishes to be provided to the satisfaction of the responsible authority prior to the commencement of any buildings and works on the land. The schedule shall show the materials, colour (including two colour samples) and finish of all external walls, roof fascias, window frames and paving (including car park surfacing). The use of a dark colour for the apartment roof is to be avoided.
(j)
Deletion of apartment 57.
(k)
All plant and equipment (including air conditioning units, heating units, hotwater systems, etc) which is proposed to be located externally shall be identified on the plans and located to the satisfaction of the responsible authority. Such equipment should be located away from bedrooms of adjoining properties.
(l)
The plans to show the dimensions of all car spaces, aisles, ramps and accessways including widening of car space No.'s 27 and 34 to 3m.
(m)
Visitor parking within the apartment basement at the rate of 0.2 spaces per dwelling in a common area, including at least one (1) standard size disabled space closest to the lifts.
(n)
The plans to show at least one (1) car space to be allocated to each two (2) bedroom dwelling. Where 2 spaces are allocated to these dwellings, tandem spaces are to be allocated. All other units with more than 2 bedrooms (or with at least two bedrooms and a study) are to be allocated a minimum of 2 car spaces each.
(o)
The plans to show all car spaces consecutively numbered.
(p)
The porte cochere to show a headroom clearance of 4.5m.
(q)
The plans to show the inclusion of sight triangles as per AS/NZ 2890.1-2004 on the east side of the apartment complex ramp and 1.5m x 1m on the east side of the townhouse ramp to the satisfaction of the responsible authority.
(r)
The plans to show a redesign of the area in the vicinity of the bottom of the ramp to the apartment basement car park to provide a 'T' intersection with adequate sight lines to the satisfaction of the responsible authority.
(s)
The plans to show the provision of a convex mirror on the wall opposite the bottom of the vehicle ramp to the townhouses to the satisfaction of the responsible authority.
(t)
Details of the means by which the car parking areas are to be secured, the times when security doors at the basement entries are to be opened for visitor access and the provision of appropriate space for access control equipment clear to the ramps and accessways to be shown on the plans.
(u)
Details of acoustic measures for apartments in close proximity to the railway reserve, such as fencing and glazing treatments, in accordance with the recommendations of a qualified acoustic engineer.
(v)
The pedestrian walkway on the east side of the townhouses widened to 1.5m to allow for landscaping and pathway lighting.
(w)
The provision of at least 9 bicycle parking spaces accessible to visitors.
2
The use and/or development as shown on the endorsed plans must not be altered or modified (whether or not in order to comply with any statute, statutory rule or for any other reason) without the prior written consent of the responsible authority.
3
Before the use and/or development starts, a site layout plan drawn to scale and dimensioned must be approved by a building practitioner registered under the Building Act 1993 and submitted to the responsible authority.
4
The plans must show a drainage scheme providing for the collection of stormwater within the site and for the conveying of the stormwater to council's nominated point of discharge to the satisfaction of the responsible authority.
5
Before demolition begins, an annotated photographic study of archival quality of the building known as "Edgecliff" prepared by a suitably qualified person to the satisfaction of the responsible authority must be submitted to the responsible authority as a record of the building. The survey must include:
(a)
each elevation of the building
(b)
the interior of the building
(c)
architectural design detailing of the building
(d)
a statement prepared by an architectural historian describing and explaining both the design and construction of the building and the photographs.
6
Before occupation of the apartment complex, all buildings and works specified in this permit in relation to the apartment complex must be completed to the satisfaction of the responsible authority.
7
Before occupation of the townhouses, all buildings and works specified in this permit in relation to the townhouses must be completed to the satisfaction of the responsible authority.
8
The responsible authority must be advised in writing when all construction and works are completed for the buildings and works specified in this permit in relation to the apartment complex and the townhouses respectively to enable the site to be inspected.
9
The redundant vehicle crossing must be removed and the area reinstated with appropriate kerbing and channelling (and then sown with grass) to the satisfaction of the responsible authority.
10
Street numbers contrasting in colour to the background must be fixed at the front boundary of the property as near as practicable to, or on the letterboxes in order to clearly establish the identity of the property. Separate unit numbers must be placed adjacent to the front entrance of each dwelling.
11
All service pipes, fixtures and fittings, other than stormwater downpipes, must be concealed on exposed elevations to the satisfaction of the responsible authority.
12
The alterations of soil levels involving an increased or decreased level at the boundaries must be retained by the provision of an adequate retaining wall, constructed of brick or masonry or other suitable alternative approved by the responsible authority, to buttress the soil against the possibility of shift. The construction of this retaining wall shall be the sole responsibility of the owner/developer.
13
Before the use and/or development starts, areas set aside for parked vehicles, access lanes and associated access ramps as shown on the endorsed plans must be:
(a)
constructed to the satisfaction of the responsible authority;
(b)
properly formed to such levels that they can be used in accordance with the plans;
(c)
surfaced with an all-weather sealcoat to the satisfaction of the responsible authority;
(d)
drained, maintained and not used for any other purpose to the satisfaction of the responsible authority;
(e)
line-marked to indicate each car space and all access lanes to the satisfaction of the responsible authority;
(f)
directional signage indicating car parking areas to be erected as required by the responsible authority and to the satisfaction of the responsible authority.
Parking areas and access lanes must be kept available for these purposes at all times.
14
Before the development hereby permitted starts, three (3) copies of a Landscape Plan must be submitted for approval by the responsible authority. The plan must be generally in accordance with the Landscape Concept Plans dated July 2006 Drawing Nos EDG1205-01, 02 and 03 prepared by Eckersley Stafford Design. The plan must show the proposed landscape treatment of the site and include supporting information to the satisfaction of the responsible authority. In particular, the plan should be to a scale of 1:100 of 1:200 and show:
(a)
Accurate location of boundaries, existing and proposed built elements, neighbouring buildings and/or vegetation that may affect or be affected by the proposed development and landscape.
(b)
Clear identification of the following elements:
(i) areas proposed to be lawn, pavement, garden beds, other landscape features;
(ii) proposed tree locations, shrub and ground cover groupings, climber locations;
(iii) coded identification for these groupings and the numbers proposed;
(iv) a Plant Schedule, which consists of an itemised list of all proposed species. The schedule must include the following headings and plant code; (refers to codified botanical names used on plan, for example, Bm):
•
Botanical and Common name;
•
Height and Width at maturity;
•
Installation height (for trees only);
•
Container size (for all other plant groups); and
(c)
Fence designs around private open space areas with particular attention to the appearance of fencing facing common areas and the street;
(d)
Supporting notes on the plan that elaborate on specific requirements for the proposed landscaping (eg. site preparation, protection during construction of existing vegetation, use of a suitable mulching material and proposed depth etc).
(e)
A legend that explains any graphic symbols used on the plan.
When approved the plan will be endorsed and will then form part of the permit.
15
Before either the apartment complex or the townhouses respectively allowed by this permit are occupied, landscaping works as shown on the endorsed plans relating to that part of the permitted development must be completed to the satisfaction of the responsible authority and then maintained to the satisfaction of the responsible authority.
16
Before the development starts, a development management plan to the satisfaction of the responsible authority must be submitted to and approved by the responsible authority. When approved, the plan will be endorsed and will then form part of the permit. Construction operations on and adjacent to the site must conform to this endorsed plan. Three copies of the plan must be submitted. The plan must include :
(a)
the location of all areas on and/or off-site to be used for parking for construction workers and contractors;
(b)
days and hours of construction;
(c)
site security;
(d)
measures to minimise noise and dust;
(e)
access of construction vehicles;
(f)
any other relevant matter.
17
Except for the western-most street tree in Orlando Street or with the consent of the responsible authority, the existing street trees must not be removed or damaged.
18
Prior to the commencement of any development or demolition works a Tree Protection Zone Fence of cyclone wire or similar construction must be erected to a height of at least 1.8 metres at a minimum (metres) in radius from the centre of the following trees:
Tree 1: Allocasuarina verticillata - Drooping Sheoak
Edge of kerb and footpath east/west, 2 metres north/south
Tree 2: Allocasuarina verticillata - Drooping Sheoak
Edge of kerb and footpath east/west, 2 metres north/south
Tree 3: Allocasuarina Verticillata - Drooping Sheoak
Edge of kerb and footpath east/west, 2 metres north/south
Tree 4: Allocasuarina Verticillata - Drooping Sheoak
Edge of kerb and footpath east/west, 2 metres north/south
Tree 5: Allocasuarina Verticillata - Drooping Sheoak
Edge of kerb and footpath east/west, 2 metres north/south
Tree 6: Allocasuarina Verticillata - Drooping Sheoak
Edge of kerb and footpath east/west, 2 metres north/south
Edge of kerb and footpath east/west, 2 metres north/south
Tree 9: Allocasuarina Verticillata - Drooping Sheoak
Edge of kerb and footpath east/west, 2 metres north/south
Tree 10: Leptospermum laevigatum - Coast Tea-tree
Edge of kerb and footpath east/west, 2 metres north/south
(a)
Barrier fences must stop access to persons, vehicles or machinery to the area it encloses and be maintained throughout the entire construction period and must have a sign attached stating 'Tree Protection Zone Fence'. (Access may be permitted only with the consent of the Site Manager or the Consultant Arborist).
(b)
There is to be no excavation in the area enclosed by this fence and a layer of organic mulch (woodchips) to a depth not less than 100mm must be laid and receive at least 1 litre of water for every 10mm of trunk diameter on a weekly basis to assist moisture retention and reduce the impact of soil compaction.
(c)
No materials, chemicals, paints etc, equipment, temporary building or otherwise, must be dumped, stored or erected within this fence.
19
Crossings shall be constructed in a manner that will not damage the root systems of any mature street trees. An experienced qualified arborist must be engaged prior to construction to plan and oversee construction methods which will ensure no damage to the trees (above and below the ground). No work shall be carried out on any council naturestrip without approval of the responsible authority.
20
Any street tree proposed to be removed and any additional street tree required by the approved landscaping plan shall be replaced or provided by council with a suitable tree(s) entirely at the owner's/developer's expense. Note: if there is not adequate space directly in front of the proposed development site a replacement tree will be planted by council, at the owner's/developer's expense, in the vicinity of the site.
21
A qualified arborist must attend the site during site cut and excavation to ensure that all affected tree roots are managed correctly and to ensure any damaged or exposed tree roots are pruned cleanly and the cut ends sprayed with a root hormone solution before covering with soil.
22
All basic services, including water, electricity, gas, sewerage and telephone, shall be installed underground and located to the satisfaction of the responsible authority.
23
Before any construction or demolition works commence on the site, to the extent that the site perimeter is unfenced and/or is not fenced to the satisfaction of the responsible authority, a secure fence is to be erected around the perimeter of the site to prevent access to the site from unauthorised persons. This fence is to be maintained for the duration of the construction and demolition, to be a minimum height of 1.8 metres, or such alternative height as is approved in writing by the responsible authority, and be constructed and sited to the satisfaction of the responsible authority. The gate or opening to the fence must be securely locked at all times when work has ceased on the site.
24
The landscaped areas shown on the endorsed plan and schedule shall only be used as landscaped areas and shall be maintained in a proper, tidy and healthy condition to the satisfaction of the responsible authority. Should any tree or shrub be removed or destroyed it may be required to be replaced by a tree or shrub of a similar size and species.
25
The responsible authority shall be advised of the completion of the landscaping so that a site inspection can be carried out. A further inspection will be carried out by the responsible authority six (6) months after completion of the landscaping to ensure that species have been adequately maintained.
26
All disturbed surfaces on the land resulting from the development/ building and works authorised or required by the permit shall be revegetated and stabilised to the satisfaction of the responsible authority so as to prevent any erosion or siltation either on or adjacent to the land.
27 The 'Legal Point of Discharge' for this development is the Council drain/pit located in Orlando Street near the south-east corner of the property OR the drain/pit in front of the property in Beach Road. The developer should verify that the levels to the drain are satisfactory for the proposed design.
28
The development is to have a 'Stormwater Detention System' installed with the design capacity to be council approved.
29 Drainage associated with basement construction (seepage and agricultural waters) muse be pumped to the nearest Council Drain Pit and not be discharged to be kerb and channel unless directed otherwise.
30 Before the development begins, detailed plans (3 sets) indicating the method of stormwater discharge to the nominated 'Legal Point of Discharge' (and Stormwater Detention Systems where applicable), must be lodged with the responsible authority for approval.
31
The driveway/parking areas/paved courtyards/paths and 'pervious' pavements must be graded/drained to prevent stormwater discharge onto the front footpath or into adjacent properties.
32
Prior to the commencement of any works on the site, the applicant is to submit a Waste Management Plan to the responsible authority detailing the manner in which waste will be stored and collected including type, size and number of containers, spatial provision for on-site storage of same, the size of the collection vehicle and the frequency, time and point of collection. Garbage receptacles are not to be stored on the street at any time. Such Waste Management Plan must be to the satisfaction of the responsible authority.
33 Finished floor levels must be to a minimum of 300mm above the applicable flood level.
34 The entry to the basement level must be constructed 300mm above the applicable flood level.
35 The entry/exit driveway of the basement carpark must incorporate a floodproof apex a minimum of 300mm above the applicable flood level.
36 A bund wall to a minimum of 300mm above the applicable flood level is to be constructed along the driveway to prevent floodwaters entering the basement carpark.
37 The drainage system is to be constructed so that external flooding is unable to penetrate the basement area.
38 All vents, staircases, etc are to be floodproofed to a minimum of 300mm above the applicable flood level to ensure no floodwater inlets to floor levels below the applicable flood level.
39 Pollution and sediment laden runoff shall not be discharged directly or indirectly into Melbourne Water's drains or waterways during the construction of development works.
40 At least 28 days prior to the construction, a Site Management Plan detailing pollution and sediment control measures must be submitted to Melbourne Water for comment/approval.
41 Upon completion of works, a certified survey plan, showing levels reduced to the Australian Height Datum, must be submitted to Melbourne Water to demonstrate that Melbourne Water's freeboard requirements have been satisfied.
42 The edges of the entrance and exit of the proposed porte cochere crossovers on Beach Road must be angled at least 60 degrees to the road reserve boundary, to improve entry and exit conditions, to the satisfaction of the responsible authority.
43 Vehicle access via the proposed porte cochere driveway on Beach Road shall be through a one-way, left-in, left-out arrangement only. Appropriate signage and pavement marking shall be provided to direct and control the flow of traffic to achieve this, to the satisfaction of the responsible authority.
44 Prior to the commencement of any works, a detailed functional layout plan must be submitted to VicRoads and the responsible authority for approval. The layout must include, but may not be limited to the following:
(a)
The proposed porte cochere crossover access arrangements at the front of the property, including dimensions and location specifics of all proposed works and existing infrastructure.
(b)
All proposed road signage and pavement marking associated with the operation of the porte cochere access, to the satisfaction of the responsible authority.
45 Works must be constructed in accordance with approved/ endorsed layouts, to the satisfaction of the responsible authority.
46 The applicant shall pay the full cost of all roadworks, drainage, pavement markings, public lighting alterations, service relocations, signage and any other associated costs that may arise due to the proposed development.
47 Consent must be obtained from VicRoads to the commencement of any works within or affecting the road reserve, in accordance with the Road Management Act.
48 The Department of Infrastructure - Bus Operations Department (tel: 96558940) must be notified of the proposed works affecting any bus stop located in front of the subject property at least seven (7) days before construction is to commence.
49
This permit will expire if one of the following circumstances applies:
(a)
The development of either the apartment complex or the townhouses is/are not started within two (2) years of the date of this permit; and
(b)
The development is not completed within three (3) years of the date of the commencement of the development.
The responsible authority may extend the periods referred to if a request is made in writing before the permit expires or within three months afterwards.
Mr E Stokans of Russell Kennedy, Lawyers assisted by Ms T Jenkin, senior planning officer.
Ms J Davis, barrister by direct brief for Mr S Stankovic.
1 This case concerns a proposal for the construction of a substantial residential development comprising 77 apartments and 6 townhouses at the former site of the Hampton Rehabilitation Hospital opposite the beach on the corner of Beach Road and Orlando Streets in Hampton.
2 The development is two-storeys above ground level and the apartment building has a pitched roof. The Bayside planning scheme imposes height controls over the site and other nearby properties.[1] Some apartments are proposed within the roof space, raising a key question as to whether this element is truly an attic and therefore whether the development complies with the planning scheme controls. The overall scale, siting and appearance of the development and in particular its visual impact on the foreshore and Bay are other important issues under consideration. Given the site's location within a residential setting, the development's impacts upon surrounding neighbours is also a significant issue.
3 Existing buildings on the site are to be demolished - including a former Victorian Italianate villa known as "Edgecliff". This building is subject to heritage controls raising a further issue as to whether its demolition should be permitted.
4 The land is also affected by localised overland stormwater flows[2] and this circumstance has given rise to concerns about the development's potential to disperse stormwater onto neighbouring land. The design of car park basements and some apartments excavated into the site are further matters requiring consideration.
5 Car parking for 155 cars is proposed and these are to be accessed from Orlando Street. Other key questions are whether the number of carparking spaces will be adequate and whether and unreasonable increase in traffic will occur.
6 There were 45 objections to the development and Council subsequently decided to refuse the grant of a permit citing 11 grounds.
7 Abacus Funds Management and Hitchbar Pty Ltd are now seeking a review[3] of the Council's decision to refuse their permit application.[4]
8 The parties at the hearing of the application for review relied on both written and oral submissions and expert evidence was given. A number of photographs, plans and other documents were tendered to the Tribunal and are retained on file.
9 The following persons gave expert evidence:
i
For the Council - Mr Craig Czarny of Hansen Partnership as to urban design;
ii
For the applicant:
•
Mr John Douglas, the project architect of JDA Architects as to the description of the proposal, design response and urban design;
•
Mr Chris Butler of Grogan Richards as to traffic and parking;
•
Mr Stephen Clark of Water Technology as to flooding issues;
•
Mr Richard Eckersley of Eckersley Stafford Design, Landscape Architects, as to landscaping;
•
Mr Jamie Govenlock of Urbis JHD as to planning and urban design; and
•
Mr Bryce Raworth, Heritage Consultant, as to heritage issues.
10 In its submissions Council also relied on heritage reports by council's heritage consultant engaged to consider the permit application, RBA Architects, and an earlier report by Allom Lovell and Associates of June 2003 in relation to the site, but the authors of these reports were not called to give evidence. Mr Pitt objected and argued that little weight should be given to these reports as their authors were not called to give evidence and be tested in cross-examination. Also Mr Pitt tabled a report by Coffey Geosciences Pty Ltd in relation to the impact of the excavation for the basement and groundwater issues. Its production was not contested by Council.
11 At the commencement of hearing, by consent, leave was given to amend the applicant's name to "Abacus Funds Management Limited and Hitchbar Pty Ltd."
12 Also Mr Pitt applied under clause 64 of schedule 1 of the Victorian Civil and Administrative Tribunal Act 1998 to amend the application by substituting some revised plans for those in the permit application.
13 Notice of the revised plans and of the changes in the plans had been given to all original objectors and persons notified of the application in accordance with the Tribunal's practice note.
14 Mr Robinson, an objector, objected to the substitution and sought an adjournment to review the plans as he considered that some of the objectors may not have had the expertise to review the plans. However his request for the adjournment was refused as we were satisfied that notice of the amended plans occurred in accordance with the Tribunal's practice note, no other party objected to the substitution and the plans were sufficiently detailed so that persons reading them would be able to obtain a reasonable understanding of them. Moreover, Mr Robinson is an architect and qualified to assess the drawings himself and had done so.
15 Also at the commencement of the hearing Mr Stokans for the Council sought leave to amend the grounds for refusal of the permit to include the following ground:
Non-compliance with paragraph 2.0 of Schedule 1 of the Design and Development Overlay 2.
16 Mr Stokans submitted this was a question of law to be decided by the Tribunal. Mr Pitt argued otherwise but the parties consented to the amendment.
17 The site is located on the north-east corner of Beach Road and Orlando Street. Its frontages are 78 metres to Beach Road and 86 metres to Orlando Street. It has a long rear frontage to the Sandringham railway line on the east. The land slopes approximately 2 metres from the east (railway) to the west (foreshore).
18 Opposite the Beach Road frontage is the Port Phillip Bay foreshore with a rock groyne extending from the beach into the bay.
19 To the east and north-east of the site beyond the Sandringham railway line and railway reserve, are residential dwellings that front onto Holyrood and Hastings Streets.
20 Abutting the south-east boundary is a single storey dwelling at 98 Orlando Street.
21 To the south of the site (corner Beach Road and Orlando Street) are double and single storey residential buildings. Abutting the north-western boundary is a double storey style residence with a covered roof deck level at 14 Beach Road.
22 The site contains a heritage listed building 'Edgecliff' in its centre as well as several ancillary buildings that formed the now disused Hampton Rehabilitation Hospital. The site has been vacant for the past 2 years.
23 This proposal is for the construction of an apartment building with 77 dwellings generally fronting Beach Road. An additional 6 town-houses are proposed facing onto Orlando Street. Demolition of all existing buildings on the site is also proposed, including Edgecliff.
24 The apartment building generally runs parallel to Beach Road with several attached wings behind arranged around four internal courtyards. Two circular open space nodes are proposed within the building's principal axis containing lifts and stairs. Voids are provided around these areas which are to be landscaped.
25 From the street, the building has the appearance of a two-storey structure with a pitched roof. As we have mentioned, dwellings (thirteen) are proposed within the roof space of the building in an attic style - a matter to which we will return. There are also 12 dwellings (Units 1 to 12) which have been excavated into the ground and which face onto sunken courtyards on the north and west sides of the site. Five of these are set over two levels.
26 All other apartments are on a single level except for except for Units 29, 30, 31, 33 and 36.
27 In total, the apartments comprise 38 two-bedroom units, 11 two-bedroom units and a study; 23 three-bedroom units and 5 three-bedroom units and a study. They range in size from 95sq.m to 231sq.m and are each provided with either a ground level courtyard space, balcony or terrace.
28 An elliptical shaped porte-cochere structure is proposed at the main entry in Beach Road designed to allow one-way vehicle access. Primary vehicle access to the basement carpark, which contains 155 spaces, is proposed from Orlando Street. The basement also accommodates storage facilities and recreational facilities including a pool and gymnasium.
29 The apartments have an overall height ranging from 11.8m to 13.4m with setbacks to Beach Road of between 6.3m and 10m. Setbacks from No. 14 Beach Road are a minimum of 4.4m and from 98 Orlando Street, 5.4m.
30 Architectural features include a colonnade treatment around the façade and a continuous glass band at first floor level which sits proud of balconies. A glazed shading device also projects from the eave line and openable shutters are proposed to balconies. External finishes and materials include the use of green tinted glass, white cement render to walls and copper finish metal decking to the roof.
31 Landscaping throughout the site is proposed.
32 There are six double storey townhouses which are to face Orlando Street, and sit in front of the apartment building. They are arranged in two banks, separated by a central ramp providing access to individual basement garages from a communal driveway. These garages are at a different level to the apartments' basement so access between them is not proposed. They allow parking for up to three cars. Individual stair and lift access is also provided between each garage and indoor living areas.
33 The townhouses each contain 4 bedrooms with formal and informal living areas, private ground level courtyards, balconies and a roof deck. They are angled to the street with front setbacks varying from 5.5m to 7.2m.
34 Architecturally, they are modelled in a different style to the apartments, adopting a geometric contemporary form with flat roofs. External finishes include white rendered walls with feature textured coloured concrete blockwork, metal louvre screens and green tinted glass to balustrades.
35 The land is included in a Residential 1 zone. A planning permit is required[5] to construct two or more dwellings on a lot. Such applications, if less than 4 storeys, must meet the requirements of Clause 55 of the Scheme (ResCode). These requirements are that a development must meet the objectives and should meet the standards of that clause.
36 Some variations to Clause 55 specific to Bayside are contained within the Schedule to the Residential 1 zone.
37 The surrounding residential area is also within a Residential 1 zone.
38 Beach Road is within a Road Zone Category 1. A planning permit is required to create or alter access to this road.[6] Such applications require referral to the relevant road authority (Vic Roads) for comment.[7] Vic Roads have no objection to the proposal subject to various conditions.
39 There are three overlay controls that affect the land. They are:
•
Special Building Overlay;
•
Heritage Overlay; and
•
Design and Development Overlay.
40 A Special Building Overlay ("SBO") relating to inundation by overland flows from the urban drainage system affects about a third of the area of the land along the frontages to Beach Road and Orlando Street. A planning permit is required to construct a building or carry out works, including a fence and roadworks.[8]
41 Applications for development in the SBO require referral to Melbourne Water.[9] This authority originally objected but has since resolved their concerns in consultation with the applicant and following the consideration of the now substituted plans. Consequently, Melbourne Water does not object to the application subject to conditions.
42 A Heritage Overlay No. 61 described in the schedule as HO61 - 15 Beach Road, Sandringham - 'Edgecliff' applies. A planning permit is required to demolish or remove a building.[10] A permit is also required to construct a building and to carry out works.
43 Decision guidelines require a consideration of relevant policies and whether a proposal will adversely affect the significance, character and appearance of the heritage place.
44 The land is also covered by Design and Development Overlay - Schedule 1 ("DDO1"). A planning permit is required to construct a building or carry out works.[11] This requirement does not apply if a schedule to the overlay specifically states that a permit is not required. Buildings and works must be constructed in accordance with any requirement in a schedule to the overlay, which may include requirements relating to (amongst other things) building height. A permit may be granted to construct a building or construct or carry out works which are not in accordance with any requirement in a schedule to the overlay, unless the schedule specifies otherwise.
45 Clause 2.0 of DDO1 specifies a requirement (among a number) that:
Building height must not exceed 2 storeys (excluding an attic or basement).
A permit cannot be granted to construct a building or construct or carry out works which are not in accordance with the above requirements except that a permit may be granted to replace a building or works existing before 24 February 2000 which does not meet the height requirements of this clause.
46 DDO1's design objectives and decision guidelines are:
•
To protect and enhance the foreshore environment and views of Bayside from Port Phillip Bay.
•
To relate the scale and form of any new development to the landform of the coast.
•
To maintain a pedestrian scale along Beach Road.
•
To maintain consistency with urban design and development objectives in the Bayside Coastal Strategy 1997 and the Victorian Coastal Strategy 2002.
•
To protect the foreshore from overshadowing.
•
To manage the increased pressure for higher buildings along the coast.
•
To protect the amenity and privacy of residential properties.
Before deciding on an application, the responsible authority must consider:
•
The neighbourhood and site description.
•
The design response.
•
Whether the proposed siting, height, design, building setbacks and landscaping will be in keeping with the character of the area.
•
Whether replacement buildings or works meet the objectives of this schedule and improve the amenity of the area.
•
The impact of the development on the coastal environment where appropriate.
•
The Bayside Coastal Strategy 1997.
47 The provisions under Clauses 52.06 (car parking), 52.35 (Bicycle facilities) and 65 (Decision Guidelines) were referred to and we have considered them.
48 There were a number of State planning policies referred to at the hearing and we have taken them into account.[12]
49 The most relevant local planning policies are to be found at Clauses 21.04 (Vision and Overarching Goals), 21.05 (Housing), 21.09 (Heritage), 21.10, 21.10 (Streetscape Design); 22.06 (Heritage Policy) and 22.07 (Neighbourhood character).
50 We will return to a discussion of these policies shortly.
51 We observe however that we are unable to attach great weight to Council's Neighbourhood Character policy under Clause 22.07 of the planning scheme. While the neighbourhood is included within precinct "E2" this site itself is excluded from the map accompanying the policy. The notation under the map legend describes the site as being within "Areas not included in the study (i.e. commercial, industrial and open space areas, golf courses and Heritage Overlays)". Having said that, neighbourhood character considerations do nonetheless form a critical part of our assessment, given the relevance of policies such as those under Clause 16, Clause 21.05-3, the zone purpose and the first objective of ResCode. We will discuss neighbourhood character issues in more detail shortly.
52 There were a plethora of other documents referred to by the various parties. They include:
•
Bayside Coastal Strategy;
•
Amendments C51 and C52 to the Bayside Planning Scheme;
•
Bayside Neighbourhood Character Review August 2004;
•
City of Bayside Height Control Study 2000;
•
Draft Hampton Street Structure Plan 2005;
•
Urban Development Program Report 2005 November 2005 (DSE);
•
Decision Guidelines for High Density Housing (DSE); and
•
Melbourne 2030.
53 We do not propose to set out the content of them but we have taken them into account and will refer to them in our reasons wherever relevant.
54 We have considered all relevant planning scheme provisions, the submissions of the parties, the evidence, reports, photos maps and documents produced and our inspection of the site and the surrounding area.
55 As mentioned above, Council amended its grounds of refusal by adding the following:
Non compliance with paragraph 2.0 of Schedule 1 to the Design and Development Overlay.
56 The operation, purposes and decision guidelines of DDO1 have been mentioned above.
57 The amended ground asserts the proposal is prohibited by permit requirements in clause 2.0 of the DDO1, which provides that a permit cannot be granted to construct or building or construct or carry out works which are not in accordance with these requirements in the DDO1. The relevant requirements are that buildings and works must be constructed in accordance with the listed requirements, which include:
•
Building height must not exceed two storeys (excluding an attic or basement).
•
A roof containing an attic must match typical roof details of the surrounding neighbourhood in terms of roof pitch and form and any windows in the roof must be mounted flush to the roof, recessed or of minimal dimensions.
58 It was put to the Tribunal that this is a question of law. Whilst this question is determined by the presiding member who is a legal practitioner, and whilst the determination of whether or not an issue is a question of law is in itself a question of law, our view is that the interpretation of a word or a phrase in the planning scheme is a question of fact to be decided in the circumstances of each case having regard to the common meanings of the words used, rather than a question of law.[13]
59 'Attic' is not defined in the planning scheme, but its dictionary definitions are:
1. That part of a building, especially a house, directly under a roof; a garret.
2. A room or rooms in that part, frequently used for storage.
3. A low storey or decorative wall above an entablature or the main cornice of a building.[14]
60 'Basement' is defined in clause 72 of the planning scheme as 'a storey below ground level, or that projects not more than 1.2 metres above ground level'.
61 Clause 72 also defines:
•
'ground level' as 'the natural level of a site at any point'; and
•
'storey' as:
That a part of a building between floor levels. If there is no floor above, it is the part between the floor level and ceiling. It may include an attic, basement, built over car parking area, and mezzanine.
62 Thus whilst the definition of 'storey' includes an attic or basement, the DDO1 two storey height limit requirement allows additional attics and basements.
63 Mr Stokans submitted that amendment C52 to the Bayside Planning Scheme sought to clarify the meaning of 'attic' and 'storey' by providing guidance as to what type of attic development is contemplated by the DDO1. He said the amendment had been exhibited, submissions had been received, an officer's recommendation prepared and by the end of the hearing the Council had resolved to refer the amendment to an independent panel to consider submissions. The form of the amendment he produced introduced a definition of 'attic' as:
A space within a building, contained wholly or within the roof pitch that is not immediately enclosed by vertical external walls and that is used commonly for storage or habitation. The space may contain dormer windows or skylights and is commonly accessed by way of stairs.
A projecting construction to provide natural lighting to attic spaces comprising a vertical window with its own pitch roof, gable and side walls, framed into a larger sloping roof, usually several dormers are used for a balanced design.
64 Mr Stokans submitted that we should have regard to amendment C52 in interpreting the meaning of 'attic' under the present planning scheme as a seriously entertained planning policy. In support of this submission he referred to Lyndale and Black Pty Ltd v MMBW[15], Teston Investments Pty Ltd v MMBW[16] and Burns Bridge Services Pty Ltd v Greater Bendigo CC [17].
65 Mr Pitt submitted to the contrary that an 'attic' under the DDO1 should not be defined by reference to an amendment proposed to the planning scheme, but must be construed having regard to the terms of the planning scheme as it is at the date of the Tribunal's decision. He submitted that it is the expressed purpose of the amendment to change and restrict the effect of the existing provisions.
66 One week after the hearing, Council's solicitors by letter dated 21 July 2006 (copied to the other parties) advised that Council had now deferred amendment C52 to enable re-exhibition of the amendment consistent with the authorisation from the Minister of Planning as proposed in Council's resolution of 22 August 2005. The letter stated that the amendment as exhibited did not reflect the Council's resolution upon which the Minister's authorisation was based, and that lists of factors indicative of 'attic' and 'storey' were accidentally excluded from the exhibited document. The letter explains that the copy of the amendment produced to the Tribunal was not the one adopted by Council and authorised by the Minister for exhibition. Evidently, the correct version would now need to be exhibited prior to the Council making a formal decision on submissions and request for a panel.
67 In the circumstances we find the amendment cannot be regarded as a seriously entertained planning proposal as the process of exhibition has to start again. Also we agree with Mr Pitt that a proposed amendment should not affect the interpretation of a mandatory provision in the planning scheme which cannot be varied by a permit. That must be interpreted by the ordinary meaning of the words in the planning scheme at the date of the Tribunal's decision. A seriously entertained planning amendment is relevant where a discretion is to be exercised.
68 We comment in passing that the amendment may create more problems than it is intended to solve. It deletes the important DDO1 requirement that:
A roof containing an attic must match typical roof details of the surrounding neighbourhood in terms of roof pitch and form and any windows in the roof must be mounted flush to the roof, recessed [emphasis ours] or of minimal dimensions, where recessed windows are a common and acceptable form of modern attic development.
69 Indeed the example of recessed windows tendered as unacceptable appeared to us, when physically viewed in context, as entirely appropriate, and the Tribunal is aware of other good examples. Its exclusion of attics 'not immediately enclosed by vertical external walls' ignores a common and longstanding neighbourhood feature of attics with gable ends including windows. It introduces a concept that the attic must be used for a purpose which services other space in the building, which is not relevant to DDO1's purpose of regulating the appearance of the building from the foreshore and its height irrespective of internal use. In our view the amendment will further complicate an already difficult matter.
70 Mr Stokans relied on 2 NSW decisions in Wunsch v Rochdale City Council[18] and Carey v North Sydney Council[19].
71 These decisions are not really directly applicable to the present situation because in each case the relevant planning control contained definitions of 'storey' different from that in clause 72, and additional limitations of when an attic is not to be counted as a storey. For example, it must not be able to be used as a separate dwelling and must not be a habitable space immediately enclosed by external walls.
72 Wunsch is relevant only in that and the argument centred around the words in the definition of 'attic' - 'confined wholly within the roof pitch'. The court decided that 'it was open for the council to determine that the roof pitch is a reference to the line of the angle of the roof so far as the roof physically extends', and was satisfied that the plans demonstrate what the upper level of the proposed units can reasonably be regarded as an attic and not as a storey.
73 We consider the statutory variations in the definition of 'attic' described in Wunsch from its ordinary meaning (namely the exclusion of vertical walls and of connectivity with levels below) are not applicable to the Bayside Planning Scheme and this case. We also agree with Mr Pitt that this definition reinforces the conclusion that the ordinary use of the word excludes the statutory variations.
74 Also, the court in Wunsch took a purposive approach in interpreting the control, by taking into account the objectives of the zone of maintaining an appearance of low density housing comprising a single storey, which it considered was achieved in the case of an attic by requiring it be effectively subsumed into the roof structure, thereby not giving the impression of a double storey building.
75 Mr Stokans also relied on Carey as indicating that recessed windows are not within the ordinary meaning of 'attic'. However a close reading of the case shows it turned on a definition of 'storey' which regulated maximum roof pitch and defined it as 'any floor or part of a floor'. 'Attic' was not defined, and the court relied on the Macquarie Dictionary. The court found that the recessed balconies to each of the dwellings were not attics as they were not 'contained wholly within the roof space' since the balconies are not roofed at all, but were storeys because they were part of a floor.
76 This finding is not applicable in this case because the definition of 'storey' in clause 72 is different as it refers to 'that part of a building between floor levels' and 'if there is no floor above, it is the part between the floor level and the ceiling'.
77 Thus in this case the terraces to the upper level apartments are not 'storeys' under clause 72 as they have no roofs or ceilings, and in any case DDO1, clause 2.0, specifically provides that any windows in an attic roof 'must be mounted flush to the roof, recessed [emphasis ours] or of minimal dimensions', which has the necessary consequence that there be an area in front of the recessed window which is not roofed and may be a terrace or treated in some other way.
78 The Tribunal in Martino v Moonee Valley City Council[20] rejected 2 double storey dwellings, both in 'attic' style, on the merits as not complying with neighbourhood character because of an uncharacteristic 25 degree steep roof pitch, the amount of roof mass and a wall of roof sheeting. The member's basis of decision was that she found the design did not convey a single storey appearance, but clearly two storey buildings. No legal or definitional issue like the one before us was in question.
79 Mr Stokans also relied extensively on Chernov v Bayside City Council[21] which considered the 'attic' issue under Bayside's DDO1. A section plan from that case was produced.
80 The Tribunal at [87] adopted the meaning of attic as:
From the common understanding of an attic both in case law generally, it appears that the essence of an attic is that it is wholly enclosed within a roof space and does not have any external walls.
81 On the facts in that case the Tribunal found the third level was a storey and not an attic and was prohibited under DDO1, because of a variety of characteristics listed in [88]. It applies the purposive approach and found the development did not protect and enhance the foreshore environment and the views of Bayside from the foreshore and Port Phillip Bay[22]. The purposive approach was also adopted in Poci Brothers Pty Ltd v Bayside City Council.[23]
82 The characteristics cited at [88] were relied on by Mr Stokans and were:
I agree with the Responsible Authority's submissions that the following characteristics render the built third level a storey, which is prohibited under the DDO1, and not an attic:
•
it contains both a floor and a ceiling;
•
it is immediately enclosed by a vertical external wall on the west elevation;
•
it is not contained wholly within the roof pitch;
•
the substantial area under the roof (80 square metres) is a significant proportion of the building's footprint, notwithstanding the palatial size of the dwelling it serves;
•
it is connected to the lower levels by a lift;
•
its relationship (both space and function) with the other levels is that of a conventional storey;
•
the significant mass and scale of the built form.
83 In Chernov the Tribunal found the third level was enclosed by a vertical external wall on the west elevation (in addition to windows) of considerable length, and that the upper level was not contained wholly within the roof pitch. At [97] the Tribunal stated:
As noted above, neither the glazed doors and windows to the lobby and gymnasium, nor the smaller windows in the as built change room and bathroom, can be regarded as recessed or mounted flush to the roof. Were the terrace area smaller and the accommodation consequently more enveloped by the roof and in particular, were the roof to the north and south unencumbered by the air conditioning platforms, this full height glazing might indeed appear to be recessed.
84 We note from the decision in Fastnet Consulting Pty Ltd v Bayside City Council[24] that an attic having a vertical gabled wall end was approved. No gable ends are proposed here.
85 In Arcaro v Bayside City Council**[25]** the Tribunal accepted as complying with the two storey height control of the DDO1 a third level attic containing separate apartments in a hipped roof style consistent with the typical roof form and pitch in the surrounding area, although the proposal was rejected for reasons of scale, mass, setbacks and visual bulk. Mr Pitt conceded that, if necessary, the spaces in the upper level could be connected to units below to be part of two level units with no permit being required if there was not a change in the units. These would be internal changes not requiring further permit, but we find no necessity for this arising out of our findings on the issue of connectivity.
86 Our conclusion and finding in this case is that the upper level apartments are attics and not prohibited by the requirements of DDO1 for the following reasons:
•
Considering the mass and scale of the built form, we find that the upper level under the roof appears as an attic and that the roof is in a form characteristic of the area, irrespective of whether there is accommodation within it.
•
Considering the purposive approach, we find that the upper level will appear from the foreshore as an attic roof form, rather than as a third storey, particularly when incorporating modifications we propose to make to the roof form at the Beach Road frontage - a matter to which we will return.
•
The upper level dwellings are wholly within the roof form and no part falls outside the typical roof alignment, and the inclusion of habitable space within the roof has not added to the dimensions of the roof or increased the mass and scale of the built form beyond what would be normally required in a roof of the two storey part of the dwellings.
•
The inclusion of lift access is not determinative, as it was in Chernov, as the lift structure is not visible from outside the building.
•
That the attic level apartments are dwellings without connectivity to lower floors is not relevant to the issue.
•
Unlike the decision in Chernov we find the relationship of the height and floor area of the upper level in relation to the whole building acceptable. The building will be a very large building on a large site and the attic level is of a floor area and dimensions appropriately proportionate to the whole.
•
The windows in the upper level are recessed consistent with the specific allowance for recessed windows in DDO1.
•
The terraces in front of the recessed windows are not storeys for the reasons discussed above as they have no floor above and no ceiling.
•
Mr Douglas's evidence was that the vertical planes opening to the upper level terraces were all sliding glass doors or windows and are not walls. We find they comply with this requirement and that Carey has no application to the meaning of 'attic' in this proposal.
•
The details of the attic roof are consistent with the typical roof details of the surrounding neighbourhood in terms of roof pitch and form.
87 As to the last dot point, we agree with Mr Pitt that the evidence of Mr Czarny and Mr Douglas is that the roof pitch and hip form match roof pitch and forms of roofs found in the neighbourhood, that the windows at the attic level are recessed windows and that the attic space displays the same characteristics as approved elsewhere by council and the tribunal on The Esplanade and Beach Road. We agree that with Mr Czarny's proposition that examples of attics in the neighbourhood include interwar attic houses with gables at each end and therefore the floor area is comparable with the level below, except as contained at the sides by the angle of the roof, which are of steeper pitches than here proposed, allowing accommodation closer to the side walls.
88 Accordingly we both find and determine that the proposal is not prohibited by the requirements of clause 2.0 of DDO1.
89 As we have mentioned, the "Edgecliff" building is listed in the schedule to the Heritage Overlay (HO61). The Council and some objectors, particularly Mr Brown expressed concerns with the demolition of Edgecliff. We have formed the view the building's demolition is acceptable for the following reasons.
90 Both the Heritage Overlay's purposes and decision guidelines listed in clauses 43.01 and 43.01-5 respectively include a consideration of the SPPF, the MSS and the LPPF. The purposes include "to conserve and enhance heritage places of cultural significance" and "to ensure that development does not adversely affect the significance of heritage places". The decision guidelines reflect those purposes and raise the key issue whether the demolition and the proposed works would adversely affect the significance of the heritage place as identified in the schedule
91 Mr Stokans' submission relied on clause 15.11-2 SPPF, clause 21.09 MSS and 22.06 LPPF as all seeking to conserve and protect places of heritage significance by retention, and in particular he referred to clause 22.06 as positively discouraging demolition of heritage places unless it can be demonstrated that they are:
•
Structurally unsound;
•
Require substantial reconstruction to make the place habitable; and
•
The replacement building displays design excellence.
92 Whilst Mr Stokans agreed that all the heritage consultants' reports produced concurred that the architectural integrity of the building had been compromised, he submitted that no one has said the building is structurally unsound, and that what amounts to substantial reconstruction is a matter of degree and opinion on which the experts are divided. He submitted that reconstruction and restoration of Edgecliff would accord with the guidelines of the Burra Charter and the planning scheme's heritage policies, and that the site is large enough to support a substantial development that respects the cultural heritage of this site without depriving the community of a valuable asset.
93 He submitted that the replacement building will not provide a worthy legacy for future generations as it does not present a standard of design excellence to warrant the irreversible loss to the community.
94 Mr Stokans referred to and produced 2 heritage reports:
•
A report by Allom Lovell & Associates dated June 2003 prepared for an earlier proposal for the site; and
•
A report by Mr Beeston of RBA Architects and Consultants Pty Ltd prepared for this proposal.
95 However he did not call the authors of the report. Mr Pitt objected to their production as the authors were not available for cross examination, but as the Tribunal has a power to inform itself as it thinks fit,[26] and as we found those reports useful in understanding the matter, we did not accept Mr Pitt's submission. Thus, we have taken these reports into account but give them less weight than the tested evidence of Mr Raworth who was called by Mr Pitt to give evidence.
96 It was Mr Raworth's evidence that the integrity of the original house on the site has been so severely compromised by the loss of much of its original fabric, that the original garden setting has been entirely lost, that there are elsewhere in the municipality a number of examples of Victorian villas displaying far greater intactness and integrity than Edgecliff and that, properly assessed, the original building on the subject land is of only minor local interest and is of a very low degree of integrity.
97 Mr Pitt relied on Mr Raworth's evidence which was consistent with the views expressed in the RBA Report:
That the subject buildings being so defaced and compromised then it is questionable whether such an approach (restoration of the subject buildings) is practicable or feasible.
98 We do not agree with Mr Stokans that the proposal being unable to meet the test of structural soundness (or unsoundness) in clause 22.06 is fatal to the application. We agree with Mr Pitt's submission that the heritage overlay and policies in the planning scheme are all to be considered together and balanced with the other applicable policies, as required by clause 11.01, to reach a planning outcome in favour of net community benefit. Therefore it is open to the Tribunal not to have regard to a particular policy or aspect of a policy in the MSS that the building be structurally unsound if it finds that consideration of the mix of relevant policies produces a net community benefit that outweighs that requirement. We agree with Mr Pitt that failure to comply with the MSS provision discouraging demolition unless it can be demonstrated that the building is "structurally unsound" cannot be taken as a prohibition of demolition unless this test can be met.[27]
99 The fundamental question is what is the heritage significance of Edgecliff?
100 Mr Raworth's report details the alterations and additions to the building and concluded that it has lost most of its original fabric. Having inspected the premises we agree with this conclusion. He stated that:
Based on the available physical and documentary evidence, the following changes are apparent:
•
All verandahs removed and replaced with unsympathetic post-war skillion roofed additions
•
Demolition of the original external wall along the north-west verandah and construction of a new wall along the outer edge of the verandah line
•
Demolition of sections of wall at the north-eastern end
•
Demolition of the large canted bay on north-west elevation
•
Re-cladding of the roof and replacement of all rainwater goods
•
Removal of the 'widows walk' tower
•
Demolition of all but one chimney (at least 6 others are visible in the early photographs)
•
Replacement of all door and window joinery
•
Painting over the original polychrome brickwork
Internally, there have been substantial alterations to the original plan form and fabric to accommodate wards, a patient's lounge, dining and recreation rooms and the hospital kitchen. Walls have been demolished or modified to provide for new openings and all ceilings appear to have been replaced. Moulded timber skirtings remain intact in the main hall and southern rooms and there are at least two original or early moulded timber door architraves and a decorative plaster archway in the front hallway. Almost all other joinery, fixtures and fittings date from the mid-20th century onwards.
The original garden setting of Edgecliff has also been lost over time and no evidence remains of original or early landscape features. As noted above, the site has been subject to various building programmes such that the house is hemmed in on three sides by hospital buildings.
101 A floor plan of Edgecliff in Mr Raworth's report shows the walls from the original constructed compared with the present structure. It depicts how little remains of the original. Indeed in our view apart from the front bay windows, some eave detail and the reclad altered roof form, the present building is but a faint echo of the past.
102 In assessing its significance Mr Raworth acknowledged the work in Allom Lovell & Associates' appraisal but concluded it is apparent the integrity of the original house has been severely compromised by the loss of much of its original fabric and at best it can only be considered to be a representative, albeit much altered example of a Victorian Italianate villa.
103 Whilst it was one of the few substantial Victorian residences remaining along Beach Road, he noted that in Hampton and Sandringham there were a number of examples of Victorian villas of greater intactness and integrity, and he listed about 18 in the vicinity with more beyond.
104 He acknowledged the use of the site as a children's convalescent home between 1910 and 1959 is notable part of the place's history but there is no remaining fabric that demonstrates this in any meaningful way. Likewise, he found the later use of the site as a rehabilitation hospital was only of some interest.
105 He believed Edgecliff is only of minor local interest, possesses a very low degree of integrity and did not warrant its current heritage overlay status.
106 Mr Raworth also noted that the site was neither within a significant streetscape nor within a heritage overlay identified for a broader precinct or area. He agreed with Allom Lovell & Associates that the building has been so defaced and compromised that it is questionable whether reconstruction is practicable or feasible. We would agree with that view. As the architectural integrity is so severely compromised we agree with his conclusion that reconstruction effectively requires the rebuilding of much of the house and introduction of a great amount of modern fabric. The present alterations are not largely reversible.
107 We find there is not a strong argument for retention and reconstruction of the subject building, and that given its relatively low interest, demolition would effectively extinguish the relevance of the heritage overlay. On this basis the design of any new buildings would not be a heritage issue.
108 We agree that an appropriate response would be for Council to require an archival quality photographic survey for lodgement with the local historical society prior to demolition.
109 The design and height of the building was the subject of considerable debate at the hearing. In essence, the arguments revolved around the following questions:
•
Is the height of the building and its visual presentation acceptable when viewed from public areas, particularly from the foreshore and Orlando Avenue?
•
Will the building have unreasonable visual or other amenity related impacts upon residential neighbours?
•
Is the development designed to offer future residents acceptable levels of internal amenity?
110 We will deal with each of these matters in turn.
111 The Council and objectors argued that the apartment building would be too high, too big and excessively bulky. Particular concerns were raised about the overall height of the building which reaches 13.4m, more than 4m greater than the ResCode standard of 9m. Mr Disney provided us with various photographs taken from various vantage points around the foreshore opposite and from the bay, contending that the apartments would be highly exposed and too dominant from these locations.
112 Parties opposed to the proposal also expressed concerned with the continuous roof form and façade treatment of the apartment building - particularly at the Beach Road frontage. Front setbacks were said to be inadequate in the context of surrounding development and because of the large scale and height of the proposed building. This was one of Mr Robinson's key arguments. It was Mr Czarny's evidence that the roof form should be broken up and that the front façade of the building should be substantially recessed on either side of the front entry to create greater vertical expression.
113 While generating less concern than the apartment building, Mr Czarny expressed concerns with the elevated floor level of the townhouses. It was contended that the gap between them for the basement ramps would also expose the mass of the apartments when viewed from Orlando Street while opening up oblique side wall views of the townhouses.
114 Before turning to our assessment of these issues, it is necessary to set the scene as to the site's strategic significance and therefore the implications for the design response.
115 This is a very large site about 500m away from the vibrant Hampton Street activity centre, with main road frontage in an established urban area. It is located between two railway stations, with Hampton the closest about 500m away. The site has only three residential abuttals, one of which is relatively minor. The site's proximity to the foreshore and Port Phillip Bay are favourable attributes that contribute to the desirability of this setting as a place to live whilst also offering a range of recreational opportunities.
116 The subject land is also identified as a site capable of accommodating more than 10 dwellings in the "Urban Development Program Report 2005 November 2005" prepared by the Department of Sustainability and Environment.
117 Given these attributes, we accept the evidence of Mr Govenlock that the site enjoys considerable strategic support for a major redevelopment. That is, we regard the site as having the hallmarks of a strategic redevelopment site. The encouragement of new housing on such sites is one of the strategies under Clause 12.01-2 of the planning scheme that seek to give effect to urban consolidation and housing diversity directions under Melbourne 2030.
118 Importantly, Council's own local policies provide strong strategic support for increased housing densities on this and nearby land.
119 Clause 21.04-3 makes reference to a Strategic Framework Plan which includes the site within a 'Residential Opportunity' area while the nearby Hampton Street shopping strip is identified as a 'Community Level Centre'.
120 One of the housing objectives at Clause 21.05-3 is:
To accommodate increases in residential population levels and changing demographic profiles.
121 Relevant strategies to achieve the objective include:
Encourage higher density housing principally in activity centres and residential opportunity areas as identified on the Strategic Framework Plan, particularly those with good access to public transport networks (eg. Sandringham Urban Village).
Provide a range of housing choices to meet the diverse needs of the community. [Tribunal emphasis added]
122 We therefore think that it reasonable to expect a more intense level of development on this site compared to sites, for example within the residential hinterland. Such development will inevitably bring about some change to the appearance of this neighbourhood. As is often said by this and various other divisions of the Tribunal, the role of the planning process is to manage that change rather than to stifle it or insist on 'more of the same'.
123 In managing that change and determining the acceptability of the design, we are guided by the various policies of the Bayside Planning Scheme, the DDO1, SBO and of course, the particular attributes of this neighbourhood setting. We are also mindful of the need to balance conflicting objectives in favour of net community benefit and sustainable development.[28]
124 One of the important assessment tools guiding our discretion is the DDO1. It has the following design objectives that we regard as being of particular relevance to this case:
•
To protect and enhance the foreshore environment and views of Bayside from Port Phillip Bay.
•
To relate the scale and form of any new development to the landform of the coast.
•
To maintain a pedestrian scale along Beach Road.
•
To manage the increased pressure for higher buildings along the coast.
125 Following our inspection and viewing of the site from various vantage points along the foreshore, we make the following observations.
126 At street level, there is a shared pedestrian / bike path. The proposed building will be highly exposed from this path. There is a second unsealed walking/jogging path behind the first. Depending on the height of landscaping between the two paths, development on the opposite side of Beach Road is subject to varying degrees of exposure. There is a third concrete path at a lower level. It sits below a landscaped embankment. While some distant oblique views to the Hampton hotel are possible, development in the immediate area is fully screened from view, including existing buildings on the review site. The landscaping arrangements create a sense of seclusion and remoteness when one travels along this path. Then, as one heads onto the beach and out onto the rock groyne (and bay), more distant views of development open up.
127 It was Mr Douglas's evidence that the development would be respectful of the costal conditions and would not be intrusive when viewed from these various vantage points. He contended that the horizontal form of the building responds to the landform of the coast - embodied in the continuous treatment of the roof form and floating glass band along the façade. Mr Douglas also referred to the colonnade feature as providing appropriate vertical expression to the façade.
128 Mr Pitt submitted that the building would be prominent but not unreasonably dominant. He also relied upon the evidence of Mr Govenlock who asserted that such a response would be acceptable when one considers the size of the site and other significant sites with landmark quality buildings along the coast such as the Hampton hotel.
129 In principle, we accept the applicant's arguments that a development on this site which, as we have found, is a strategic redevelopment site will inevitably have an obvious presence.
130 With some modifications that we will discuss shortly, we are satisfied that the apartment building's presence will not in broad terms, be unreasonable when viewed from Beach Road itself, the bike path at the same level as the road or the unsealed jogging/walking behind. One's experience of the building will be a dynamic rather than static one when travelling along these routes. From these locations, we agree with Mr Douglas's evidence that the colonnade treatment, movable sun screens to balconies and angling of the two corner elements of the building will offer an acceptable degree of relief to the façade and assist in creating perceptible vertical expression. From more other coastal vantage points such as the groyne and bay itself, we think distance will play an important part in mediating its scale and presence.
131 Overall, we therefore think that the architectural expression of the building's facade is well conceived. In particular we think the use of the floating glass panel with its curved form together with the projecting glazed element at the eave line above will also assist in creating a visually interesting building which makes a positive contribution to this part of Beach Road.
132 We do however have some reservations about the uninterrupted roof form and the overall building height. While we accept that new development ought not seek to literally replicate the design of surrounding buildings, the space between buildings and roof forms is an established characteristic of development in this area. We are also mindful of Council's policies such as those at Clause 21.05-3 which seek to:
Ensure that new medium density housing is designed to be responsive and respectful of its surroundings.
133 Although we have found that the vertical expression of the façade is acceptable, we think the unbroken treatment of the roof is not. We consider its uninterrupted 50m length would have an excessively bulky appearance and would be uncharacteristic of the mass of existing roof forms in the locality. From our inspection we observed that the former Hampton hotel building - one of the largest buildings nearby - has a length of about 36m and there are definite gaps between the roof forms of existing dwellings along Beach Road. Although one objective of the DDO1 is to relate the scale and form of any development to the land form of the coast, we think it equally important that the roof form be designed to minimise rather than accentuate its bulk and presence while also responding to the pattern and form of surrounding development. That objective is common enough and is a relevant matter for consideration in neighbourhood character and detailed design terms under ResCode and planning scheme policies.
134 We have therefore come to the view that there should be a centrally located break in the roof. We consider that the modified roof design described by Mr Douglas would achieve an acceptable outcome that would address our concerns with this element of the design. This modification would involve raking the roof form away from either side of units 65 and 77 adjacent to the void over the main building entry. We anticipate that this may involve consequential internal modifications to these and possibly neighbouring units. From Mr Douglas's evidence, we understand that the floating glass panel could be wrapped around the corners of this central void space rather than continuing along the main façade. This however is a matter of detailed design which we think is best left to the architect's hand.
135 We also consider that the colour of the roof ought to be light in appearance to assist in minimising its visual impact. The plans indicate the use of "copper finish metal decking" which may be an appropriate response but this will ultimately require confirmation with the provision of a sample to the Council for its approval. Our conditions will reflect these findings.
136 Turning now to the question of the apartment building's height, we think it necessary to require its lowering. We have formed this view for a number of reasons. The existing height of the building fronting Beach Road is approximately l0m above ground level. The building would extend about 3.4m higher than this and approximately 4m higher than the highest point of the dwelling at No. 14 Beach Road. We think the building height would be excessive taken in the context of existing and neighbouring building heights and when viewed from the foreshore. In particular, we have concerns about the building's visual impact when viewed from the beach itself and from the more secluded environs of the third and adjacent (sealed) path - the latter from which buildings are presently not immediately visible.
137 We do not think lowering the building to 10.5m as suggested by Mr Stokans would however be reasonable. This would result in the loss of one level of the building which we think that on balance is unwarranted taking into account the strategic significance of the site. We are also mindful that Mr Czarny, under cross-examination by Mr Pitt, agreed that wall heights are comparable to the height of other buildings in the area. We also agree. Consequently, we think a height reduction by 1m would satisfactorily address our concerns.
138 To achieve our required modification we envisage that a combination of techniques may be used, including lowering the basement floor level by up to 0.5m and a reduction in floor to ceiling heights which are presently 3m.
139 For pedestrians moving along the site frontage, we are satisfied that the development would not be overwhelming in scale or appearance. We consider that the front setbacks of the building are comparable to much of the development along Beach Road. Setbacks to walls of the apartment building vary from a minimum of 6.3m on the corners increasing to 10m within the central portion. Although raised decks are partially proposed within the front setback area we are confident that Mr Eckersley's landscaping proposals will provide an appropriate softening of this area that will enhance the pedestrian experience. At the point nearest the dwelling at No. 14 Beach Road, the south-west wing of the building is setback more than l9m, given its angled design. We think that this setback provides a sensitive transition between this neighbouring dwelling and the lesser setbacks of the proposal further south-east.
140 Despite concerns expressed by Mr Stokans and Mr Robinson, we are not troubled by the presence of the glass floating panel at first floor level which sits forward of the main façade. This band of glazing will be well above the eye level of the pedestrian and is to have a light weight appearance. We think adequate space is available for the planting of canopy trees around this element. As we have mentioned, we consider this glazed element to be an integral part of the design that will create a sense of overall design cohesion whilst adding visual interest to the façade. It should be retained.
141 Nor are we troubled by the proposed porte-cochere. It also will have a light weight appearance and would not read as a hostile element at pedestrian level. During our inspection we also observed a group of street trees which will substantially mask this element from the opposite side of Beach Road.
142 In Orlando Avenue, we consider that the development would not have unreasonable visual impacts upon the streetscape or from residential properties opposite. This interface is presently characterised by high fencing and buildings that are utilitarian in appearance - features that in our view, detract from the appearance of the street.
143 The apartments in the south-west corner and townhouses further east are designed to address the street and will make a positive contribution to it. Although the apartments in the south-west corner face Orlando Street, the angled lot and street configuration accentuate the relationship of this part of the development with Beach Road rather than Orlando Street or the substantial 2-3 storey dwelling on the opposite corner. An appropriate transition in setbacks from the corner to the nearest dwelling at No. 98 Orlando Street is also provided.
144 Further east, the larger form of the apartment building also sits well behind and would be largely masked by the townhouses in the foreground. Given that the setback to the eastern wing of the apartments is primarily 38m from Orlando Street, we are satisfied that this element of the development will not be unreasonably intrusive when viewed from Orlando Street.
145 Although surrounding development is somewhat mixed, examples of substantial two-storey dwellings are not uncommon. We consider that the townhouses have been well designed with their contemporary styling, articulated facades and design detailing. They are designed to reflect the finer grain pattern and appearance of existing dwellings nearby.
146 We do not think the presence of the two double cross-overs providing access to the basement carparks will adversely impact on the streetscape. Three cross-overs presently exist, the width of the frontage is substantial at 86m and the new cross-overs are located opposite a high perimeter fence of the dwelling at No. 16 Beach Road. Adequate scope exists for landscaping between the cross-overs. Thus, we find this aspect of the design to be acceptable.
147 Ms Davis acting for Mr Stankovic, the owner of No. 14 Beach Road and two adjoining lots, submitted that the development would have an imposing and oppressive impact, especially when viewed from the rooftop deck of Mr Stankovic's home. It was also contended that the apartments would assume the appearance of a four-storey building - particularly given the courtyard units which are excavated into the ground opposite the common boundary.
148 During our inspection of No. 14 Beach Road we went up onto the roof deck. Our first observation is that the existing outlook to the bay will remain substantially intact. We accept Mr Douglas's evidence that the angling of the apartment building's north-west corner has been designed to achieve that objective.
149 Secondly, while overviewing into the review site from first floor windows at the side and rear and from the roof deck are possible, we do not think the development would be unreasonably intrusive from these particular vantage points. We say this given the siting and configuration of the large courtyard on the north-west side. At its mouth, commencing between 4.4m (rear) and 5.2m (front) from the common boundary, the courtyard has a width of some 27m between the two building wings. It reduces to a width of 18.8m about 17m from the common boundary. The front wing of the building is angled to the common boundary rather than running parallel to it which assists in minimising visual bulk. The rear wing partly adjoins outbuildings on Mr Stankovic's property. This is an interface we do not regard as particularly sensitive. We do however consider it necessary to provide some articulation to the upper portion of the two storey walls of Units 47 and 48 that face No. 14 Beach Road given their breadth of more than 22m broken only by a small gap and their 2-storey height. Together with extensive landscaping proposed along the common boundary[29] and within the courtyard area itself we otherwise find that satisfactory softening of the development will be achieved.
150 Overall, we therefore consider that the development has been designed in a manner which is generally respectful of the outlook from this neighbouring dwelling and indeed from the backyard. Given the design response we have described and with the lowering of the building and greater articulation to the north-west wing that we will require, we are also satisfied that the development would meet the Bayside ResCode objective for side setbacks.
151 We turn now to the interface on the east side with properties at No.'s 96 and 98 Orlando Street.
152 From our inspection, we observed a driveway and fairly dense row of perimeter planting (about 5m high) along much of the east boundary at No. 98 Orlando Street. Further north of this is a large garage/shed. Together with the proposed setbacks of 4.2m to the townhouses and 5.4m to the apartments, we are satisfied that the development would not unreasonably impact upon this neighbouring property.
153 At the rear, we agree with Mr Govenlock's evidence that unit 57 at first floor level ought to be deleted given the potential for this part of the development to be unreasonably intrusive. With this modification we consider that the design response is an acceptable one.
154 In respect of No. 96 Orlando Street, we note that the triangular portion of the review site which abuts the common rear boundary with this neighbour is to be free of buildings. The deletion of Unit 57 and the distance of this neighbouring property from the proposed development also take us to the conclusion that no unreasonable visual impacts will arise in respect of this neighbour.
155 In terms of overshadowing we anticipate that there will be none in relation to No. 14 Beach Road. To the east, some minor overshadowing in the afternoon will occur in relation to No. 98 Orlando Street. These shadows will however only be cast on the driveway or shed at 3pm. Importantly, habitable room windows and secluded areas of private open space would not be affected at this time achieving compliance with ResCode standards and objectives.
156 There is the potential for overlooking from a number of apartment windows and or balconies/terraces which are situated within 9m of No. 14 Beach Road and No. 98 Orlando Street. While Mr Govenlock agreed that some screening measures should be introduced in relation to Units 47, 48, 58, 68, 69 and 72 we have identified several others on the north-west side following our inspection and close examination of the plans. These additional units are:
•
At ground level, Units 14 and 17 whose floor levels appear to be elevated about 1 .2m and 0.8m respectively above natural ground level; and
•
Unit 42 at first floor level.
157 We will require a condition introducing appropriate screening measures in accordance with ResCode Standard B22 or by demonstrating that balcony planter boxes and the floating glass panel are designed to limit overlooking to Council's satisfaction.
158 The site's northern interface is with the railway reserve. Beyond that again are residential properties which front Holyrood Street.
159 We do not think that the appearance of the development would bring about any unreasonable visual consequences when viewed from the railway reserve or from residential properties to the north. The width of the railway reserve is more than 23m and it is not an interface we regard as highly sensitive. The development is to be setback between 4m to about 27m from the north boundary. With these setbacks and the separation created by the railway reserve, we consider that any views of the development from properties in Holyrood will be distant ones - those views would not be unreasonably intrusive.
160 Some concerns were raised primarily by Mr Stokans about the acceptability of the design in terms of the level of amenity that the development would offer future residents.
161 In particular, the courtyard units which are excavated below ground level were said to be a poor design response and might be regarded as low quality housing. It was argued that these apartments would be in shade for most parts of the day. The design of these units was also said to be potentially problematic given the site's partial location within an area subject to overland flows. We will return to the question of the SBO and flooding impacts shortly.
162 Other concerns relate to the proximity of some units to the railway line and the adequacy and amenity of communal open space areas.
163 We do not share the Council's concerns as to the quality and liveability of the development.
164 In relation to the excavated courtyard units, 7 of these are oriented to face a substantial courtyard space which has a width in excess of 18m at its narrowest point in the north-west wing. Both indoor areas and private courtyards will all receive some sunlight throughout various times of the day. The substantial dimensions of the communal courtyard also lead us to the conclusion that residents will not have a sense of being unreasonably "hemmed in" or overwhelmed by walls opposite.
165 We hold similar views about sunlight access in relation to units 8 to 12 facing the north boundary. We also think the setbacks from these units and the dimensions of their private open space areas will allow a reasonable outlook to and appreciation of landscaped areas in this portion of the site.
166 In reaching these findings, we have taken into account the two-level or mezzanine design of five units (i.e. Units 2, 5, 6, 8 and 10) which will enhance light penetration. We do however agree with Mr Govenlock's suggestion of converting Units 3, 4, 7, 8, 11 and 12 to double storey/mezzanine style apartments with living spaces provided at ground level for direct courtyard access. These modifications may result in Units 15, 16, 17, 18, 19 and 20 being subsumed into the footprint of the respective units on the levels below.
167 We do not think that the apartments on the north side are located too close to the railway line. The nearest dwellings are setback about 4.7m from the northern boundary and the vast majority have substantially greater setbacks. We do not consider these setbacks as inadequate and indeed we observed dwellings on the opposite side of the railway reserve located much closer to the railway reserve. Notwithstanding, we accept Mr Douglas's evidence that acoustic engineering details be provided for dwellings at this interface.
168 We are otherwise satisfied with the internal layout, orientation and amount of private open space associated with other dwellings.
169 We also consider that the design of the communal courtyards will provide an acceptable supplementary offering of open space to future residents. We regard Mr Eckersley's landscaping proposals as well conceived. Some relatively minor details will however require further resolution such as the design of fencing to private open space at the interface with communal courtyards (Mr Eckersley suggested radial sawn timber).
170 We also think it desirable to widen the pedestrian path alongside the east boundary from 1m to l.5m given the likelihood that it will be well utilised by pedestrians moving east towards Hampton Street and to enable some landscaping and lighting.
171 All of these matters can be readily dealt with through permit conditions.
172 Waste management arrangements were queried by a number of objectors. Garbage chutes are incorporated into the development and space has been set aside within the basement for waste storage. With these features and a permit condition requiring the submission of a waste management plan, we are satisfied that waste storage and collection arrangements can be satisfactorily managed.
173 The location and potential impacts of roof top plant was also a matter raised in submissions by objectors. A sunken platform within the roof design will allow plant and equipment to be concealed from view. The plant will also need to be operated in accordance with relevant EPA requirements in respect of noise emissions.
174 Some concerns were also raised about construction related activity. We think it necessary to require a construction management plan to provide guidance into such matters as hours of construction, control of noise and dust and parking locations for construction workers' vehicles. These are matters that can be addressed as a permit condition.
175 The site is partially affected by localised overland stormwater flows from the urban drainage system. The relevant purpose in clause 44.05 of the Special Building Overlay (SBO) is:
To ensure that development maintains a free passage and temporary storage of floodwaters, minimises flood damage, is compatible with the flood hazard and local drainage conditions and will not cause any significant rise in flood level or flow velocity.
176 Melbourne Water originally had concerns with the proposal and the scale of the excavations to 3.5 metres below natural ground level but since, Melbourne Water has been satisfied in negotiations with the applicant and has withdrawn its objection subject to conditions being complied with.
177 Council still maintained concerns that the amended proposal does not address the concerns about floodwaters and will prevent the natural flow of overland water from entering the excavated site or the likely impacts of stormwater being diverted around the site onto adjoining properties. Mr Stokans submitted it is poor planning to locate dwellings below natural ground level in an area identified as being subject to inundation. Council did not however produce any expert evidence on the issue.
178 The concern of a number of the respondent/objectors was that floodwater at present flows down Orlando Street and that the proposed development's raised wall along Orlando Street boundary and humps at the car park ramp entrances to prevent water entering the car parks, would result in water being diverted onto properties on the other side of Orlando Street. An objector stated that already one house had required restumping at considerable cost due to water affected foundations, and fears were expressed of further damage.
179 The Coffey report dated 23 December 2004, prepared for an earlier proposal, had borehole and groundwater information attached and was accepted without dispute by the parties. The conclusions contained a statement that 'excavation of a basement to a depth of approximately 8 metres may encounter cemented bands and inflow of groundwater from approximately 3 metres below the surface level'.
180 Some borehole results were attached. The only boreholes in the SBO area concluded at 1.5 metres showing no water except for borehole 4 in the north-western corner of the property which showed water at 4 metres.
181 Mr Clark gave evidence for the applicant on flooding issues. His evidence was that:
• provided that finished floor levels were a minimum of 300mm above the applicable floor area in the SBO area, and Melbourne Water's conditions were satisfied, the proposal would be satisfactory in inundation terms.
• He noted that the existing solid fence and buildings along the Orlando Street frontage at present prevent floodwater from entering the site, and as to external flooding, his conclusion was that:
Once constructed, in terms of external flood flows the hydraulic characteristics of the site remain essentially the same. That is both in its existing configuration and following the construction of the proposed development, the site provides virtually no overland flow carrying capacity within the site boundary. In the existing situation this is due to the presence of extensive buildings across the site, and a solid fence around the side boundary. The developed situation is hydraulically similar to existing buildings.
•
As to the direct rainfall impacts on the car parks and basement areas, he was satisfied that a number of drainage and retention areas would provide satisfactory protection to the lower level units and the car parks. He considered the parking areas in the courtyard level would provide sufficient potential storage for runoff at shallow depths and that if pumps failed or the drainage system blocked, overflow from the courtyard areas should be directed to the parking areas to provide an additional factor of safety before the courtyard level floor areas are reached. He said this could be achieved by having lower level dwelling floor levels above the car park and courtyard levels.
•
In cross-examination on the impact on groundwater with particular reference to the foundation problems for houses on the opposite side of Orlando Street, he was of the opinion that the excavations would not affect the water table, and that lowering of the basement by 0.5 metre would not have any implications on drainage or flooding.
•
The detailed design should incorporate pumps drainage into rainwater tanks to ensure proper drainage of the lower levels.
•
There will not be any significant rise in flood level or flow velocity and flooding will not create a hazard within the development.
182 Mr Pitt relied on Mr Clark's evidence and the position of Melbourne Water in respect to the modified plans.
183 We accept this evidence and Mr Pitt's submissions subject to Melbourne Water's conditions being incorporated into the permit.
184 Concerns were expressed by various parties, particularly residents of Orlando Street that the development might cause traffic and carparking difficulties in this street and at the Beach Road intersection. The parties variously sought to consolidate the two access ramps in Orlando Street into one or for all access to be provided directly from Beach Road. The number of carparking spaces was also said to be deficient, with particular concerns raised about the impact of visitors parking kerbside.
185 Commencing with the access arrangements, just as we have found that the cross-overs and ramps would not have unreasonable visual impacts upon the streetscape of Orlando Street, we also find that no unacceptable traffic related impacts will arise. These ramps are located at the Beach Road end of Orlando Street, thus we anticipate most traffic related activity will occur at this location. We also accept Mr Butler's traffic evidence that the vast majority of vehicles travelling to or from the site will do so using Beach Road rather than Orlando Street.
186 Consequently, we also agree with the traffic evidence that any increase in traffic will not be excessive - less than 50 additional vehicle movements per day (vmpd) are estimated to or from the site in Orlando Street beyond the east site boundary. Even if these volumes were two or three times that number we do not consider this increase to be excessive. In reaching our findings, we have taken into account the design of Orlando Street which is capable of accommodating about 2000vmpd and existing volumes at about 300vmpd. We think that the additional traffic generated can be readily absorbed without exceeding the capacity of this local street. Nor, in our view, will this increase give rise to any unreasonable traffic or other amenity related impacts given the relatively low volumes involved. The porte-cochere will also relieve some pressure for vehicles to use Orlando Street although we expect this will be limited primarily to delivery vehicles and vehicles engaged in picking up or dropping off residents or their visitors.
187 We also think it reasonable to expect some traffic movements in Orlando Street as a consequence of any use or development of this site. Although the former hospital use has now ceased, historically that non-residential use would have generated some traffic in Orlando Street. That is also a relevant matter that has informed our findings.
188 It was Mr Butler's evidence that the intersection would be able to safely and efficiently cope with vehicles turning right to and from Orlando Street at Beach Road. We accept his evidence that sufficient gaps are available to accommodate these movements without any unreasonable queuing and delays or safety concerns. We also note that Vic Roads has not objected to the any aspect of the proposal subject to relevant conditions. Nor do they see the need for this intersection to be signalised. We agree.
189 Another matter concerning the intersection is the presence of a cabinet in the nature strip in front of the site. Council prefers to see it removed to improve sight distances at the intersection. We understand that this asset belongs to Melbourne Water. Although we think the intersection operates satisfactorily, we think it fair that if removal of the cabinet is to be pursued by the Council, Melbourne Water rather than the permit applicant should bear the cost of its relocation.
190 In relation to carparking, 155 spaces are to serve the apartments and 18 car spaces are separately available for the townhouses. They are on different levels. We see no need to link the two basements - they service discrete parts of the development.
191 The number of parking spaces more than exceeds the suggested ResCode standards for resident use and we are satisfied with the overall number of spaces proposed. We think it prudent however to require the provision of visitor parking spaces at the rate set out in ResCode - that is 1 car space per 5 dwellings (0.2 spaces per unit) rather than the lesser rate of 0.15 space per unit suggested by Mr Butler. We say this given that in a practical sense, any overflow parking is likely to occur in Orlando Street given the nature of traffic conditions in Beach Road. Further, in relation to the townhouses, while each is provided with a visitor car space, these are in tandem which together with their containment within garages may discourage their use for all but longer visits.
192 With the deletion of at least Unit 57, we are confident that ample parking spaces will remain available for allocation to both visitors and residents in accordance with ResCode standards. We also note the applicant's intention to ensure that security gates at the basement entries are left open, except at night, to promote visitor access.
193 We have considered the need for other minor modifications to the layout and design of the carparks. These are essentially matters of detailed design and generally accord with Mr Butler's evidence. In short we find that:
•
Car spaces 27 and 34 which abut walls should be widened to 3m;
•
It is desirable to allocate any tandem spaces to the 2-bedroom units;
•
Some minor improvements to the alignment and sight distances at the bottom of the apartment basement ramp (T-intersection) are warranted;
•
Minor modifications (provision of sight triangles) to the two ramps is necessary;
•
A convex mirror should be provided within the basement opposite the townhouse ramp;
•
The porte cochere is to have a headroom clearance of 4.5m.
194 These are matters that can be easily dealt with as permit conditions.
195 This is a large site of strategic significance. Its development for medium density housing is strongly supported by Council's own policies and broader statewide policies.
196 We have found that its design, with some modification to the roof form of the apartments and by lowering its height by 1m will result in an acceptable outcome. Buildings will primarily have a two-storey appearance when viewed from key vantage points around the site.
197 While this development is different and will bring about some change to the local landscape, with our required modifications we consider the level of change is within acceptable limits. We have concluded that on balance, it will not unreasonably impact upon the foreshore, the bay or surrounding neighbours.
198 We will set aside the Council's decision and direct the grant of a permit.
[1] Design and Development Overlay - Schedule 1
[2] The site is affected by the Special Building Overlay
[3] Application for review under section 77 Planning and Environment Act 1987 against refusal of a permit
[7] Under s.55 of the Planning and Environment Act 1987.
[9] Under s. 55 of the Planning and Environment Act 1987.
[12] These statewide policies include Clause 11 (Introduction), Clause 12 (Metropolitan Development); Clause 15.12 (Energy Efficiency) and Clause 16.02 (Housing).
[13] Franceschini v MMBW [1980] 1 PABR 276
[14] Macquarie Dictionary 3rd edition revised page 113
[16] MMBW 3 PABR 273
[17] [2005] VCAT 1115 (17 June 2005)
[18] (2002) NSW LED 1203 (28 June 2002).
[20] [2003] VCAT 1615 (5 November 2003)
[21] [2004] VCAT 1523 (3 August 2004)
[23] [2003] VCAT 1884 (12 December 2003) at [14].
[25] Application for Review P879/2003 (8 August 2003)
[27] Harding v Port Phillip CC [2002] VCAT 416 925 March 2002) at [21-26], and Angelore Holdings Pty Ltd v Stonnington CC [2006] VCAT 1206 (19 June 2006`).
[28] Clause all of all Victorian planning schemes including the Bayside Planning Scheme.
[29] Using Willow myrtles that grow to a height of 6m.
Abacus Funds Managament