QLDIn ForceRegulation
Survey and Mapping Infrastructure Regulation 2024
sec.24Survey accuracy
Start here
Get a plain-English read of sec.24
Turn the raw legal text into a practical explanation grounded in Survey and Mapping Infrastructure Regulation 2024.
### sec.24 Survey accuracy
A cadastral surveyor who carries out, or is responsible for carrying out, a cadastral survey must ensure any survey equipment used for the survey is—
standardised; and
capable of achieving the accuracy stated in the relevant survey standard for cadastral surveys.
Maximum penalty—6 penalty units.
- (a) standardised; and
- (b) capable of achieving the accuracy stated in the relevant survey standard for cadastral surveys.