### sec.27B Lapsing of declaration if IAR required
This section applies to a coordinated project if an IAR is required for the project.
The declaration for the project lapses if, within 18 months of the declaration being made, the Coordinator-General has not, under section 34I (1) (b) , accepted a draft IAR as the final IAR for the project.
However, if before the lapsing of the declaration under subsection (2) , the Coordinator-General gives written notice to the proponent stating a later time for the declaration to lapse, the declaration does not lapse until the later time.
s 27B ins 2014 No. 40 s 31
(sec.27B-ssec.1) This section applies to a coordinated project if an IAR is required for the project.
(sec.27B-ssec.2) The declaration for the project lapses if, within 18 months of the declaration being made, the Coordinator-General has not, under section 34I (1) (b) , accepted a draft IAR as the final IAR for the project.
(sec.27B-ssec.3) However, if before the lapsing of the declaration under subsection (2) , the Coordinator-General gives written notice to the proponent stating a later time for the declaration to lapse, the declaration does not lapse until the later time.