QLDIn ForceAct
Petroleum and Gas (Production and Safety) Act 2004
sec.558Obligation to survey if Minister requires
Start here
Get a plain-English read of sec.558
Turn the raw legal text into a practical explanation grounded in Petroleum and Gas (Production and Safety) Act 2004.
### sec.558 Obligation to survey if Minister requires
The Minister may, by notice to the holder of a petroleum authority, require the holder to survey or resurvey the area of the authority within a stated reasonable period.
The holder must cause the survey or resurvey to be carried out by a person registered as a cadastral surveyor under the Surveyors Act 2003 .
The holder must pay any costs incurred in complying with the notice.
(sec.558-ssec.1) The Minister may, by notice to the holder of a petroleum authority, require the holder to survey or resurvey the area of the authority within a stated reasonable period.
(sec.558-ssec.2) The holder must cause the survey or resurvey to be carried out by a person registered as a cadastral surveyor under the Surveyors Act 2003 .
(sec.558-ssec.3) The holder must pay any costs incurred in complying with the notice.